Agenda - Advisory Design Panel Source: https://www.langleycity.ca/media/file/adp-agenda-march-13-2024 Archived copy: https://heylangley.ca/records/city-of-langley/committees/advisory-design-panel/2024/2024-03-13-agenda-adp-agenda-march-13-2024.pdf SHA-256 of the PDF: dfefcbe18a85bb7fcc37dfeccd2d6c12b9996b1f2786469dc33a0713cb2593b6 Fetched: 2026-11-10 --- page 1 --- ADVISORY DESIGN PANEL WEDNESDAY, MARCH 13, 2024 AT 7:00 PM Council Chambers Langley City Hall (In-Person Meeting) A G E N D A 1) AGENDA Adoption of the March 13, 2024 agenda. 2) MINUTES Adoption of minutes from the November 22, 2023 meeting. 3) ADVISORY DESIGN PANEL INTRODUCTION & ORIENTATION Welcome and brief orientation and review of ADP Terms of Reference. 4) DEVELOPMENT PERMIT APPLICATION DP 12-23 ZONING BYLAW AMENDMENT APPLICATION RZ 10-23 20256-20272 54A Avenue. 5) NEXT MEETINGS April 3, 2024 April 24, 2024 (to be confirmed) 6) ADJOURNMENT --- page 2 --- Document Number: 190884 MINUTES OF THE ADVISORY DESIGN PANEL HELD IN COUNCIL CHAMBERS, LANGLEY CITY HALL WEDNESDAY, NOVEMBER 22, 2023 AT 7:00 PM Present : Councillor Paul Albrecht (Chair) Councillor Mike Solyom (Co-Chair) Mayor Nathan Pachal Matt Hassett Leslie Koole Chad Neufeld Scott Thompson Ella van Enter Absent: Johnnie Kuo Blair Arbuthnot Tony Osborn Cst. Peter Mann Staff: C. Johannsen, Director of Development Services A. Metalnikov, Planner K. Kenney, Corporate Officer Chair Albrecht began by acknowledging that the land on which we gather is on the traditional unceded territory of the Katzie, Kwantlen, Matsqui and Semiahmoo First Nations. 1) AGENDA Adoption of the November 22, 2023 agenda. It was MOVED and SECONDED THAT the agenda for the November 22, 2023 Advisory Design Panel be approved. CARRIED --- page 3 --- ADP Minutes – November 22, 2023 2 2) MINUTES Adoption of minutes from the October 18, 2023 meeting. It was MOVED and SECONDED THAT the minutes of the October 18, 2023 Advisory Design Panel meeting be approved as circulated. CARRIED 3) DEVELOPMENT PERMIT APPLICATION DP 11-23 1,094 m 2 restaurant at 6141 200 Street. Anton Metalnikov, Planner, spoke to the staff report dated November 15, 2023 and provided a brief overview of the Development Permit application. Carl Johannsen, Director of Development Services advised that: • the applicant was ready to construct the building then reconsidered and submitted a new design to the City for approval; • although the new design does meet development guidelines, staff have been working with the applicant to have more colour variation and windows to punctuate the corner. In response to questions from Panel members, staff advised that: • The second floor is a staff area, and does not change the height of the building; • The purpose of the bioswale is for storm water retention; it was not included in the original application but was subsequently identified as necessary by engineering staff; • It is anticipated that that the bioswale will only be wet during the rainy season; • The applicant must meet the BC Building Code in terms of number of washrooms; • There is currently a sidewalk along 200 Street but not along the Langley Bypass; adding a sidewalk to the Langley Bypass would require consultation with Ministry of Transportation and Infrastructure; • Staff will be looking at frontage improvements along the Langley Bypass in the future; • The angled sidewalk is used to access the mall. The Applicant team entered the meeting: Rafael Santa Ana, Principal, Rafael Santa Ana Architecture Workshop Fatima Panama, Intern Architect, McKinley Studios Dylan Chernoff, Landscape Architect, Durante Kreuk Ltd. Brett Gwynn, Real Estate Development Porfolio Manager, Cactus Club Café. --- page 4 --- ADP Minutes – November 22, 2023 3 Ms. Panama presented the application, providing an overview of the development with details on the following: • Overall vision and design aesthetic; • Building design renderings; • Material palette. Mr. Santa Ana provided information on the context and site plans, noting the restaurant is completely accessible. Mr. Chernoff provided information on landscape design elements including: • Stormwater management feature; • Walkways north and south of building; • Lantern on corner. Panel members provided feedback on the form and character of the development and discussion took place regarding the following: • Adding more plantings to the landscape plan to be more in line with a west coast modern aesthetic; • Suggest updating plants in existing planters located across from accessible stalls; • Incorporate some extra trees, taking into consideration soil volume needed to retain trees; • There should be a more direct route for pipe connection to bioswale that does not travel under the building; • Providing a double row of trees; • Consider more fenestration into the building; • Consider widening the north facing sidewalk and making a continuous sidewalk by removing the one existing parking spot if not required under Zoning Bylaw; • Place bike racks in a more high-traffic area and ensure the racks are of a high quality; • Landscaping is obscuring the restaurant sign on the building’s east elevation and, on the west elevation, cars will block the sign; • Seasonal patio sound attenuation is going to an issue; should put extra plantings there and have tall planters to help buffer sound; • Should enclose all-season patio for better security; • From afar it will be difficult to differentiate different textured concrete which creates a lack of contrast; issue is mostly on the east and north sides; suggest doing something to break up the façade on those sides with colour or deeper textures; • Ensure the different colours of concrete won’t turn grey over time; • Consider using a cedar post at the front entrance instead of a concrete post to provide a warmer feeling; • Use a more interesting material on the ground around the entrance, possibly bring pattern from interior to exterior; diversity in exposed aggregate could make a unique feature for entrance; --- page 5 --- ADP Minutes – November 22, 2023 4 • There is an opportunity for additional windows on the second floor on the north; • For a dressier look, have more colour on the slats; • The west view has vertical posts – incorporate that element on east side to break up monotony; • When incorporating natural species in the landscaping, consider what will tolerate changing climate conditions; • Put some taller features in the river rock planting beds in front of the windows for more interest; • Provide night rendering to the Panel. In response to questions from Panel members, the applicant team advised that: • The bioswale is 10ft by 20ft and 2ft deep; • It would be difficult operationally to have multiple entrances into the restaurant in terms of providing a consistent guest experience; • The statutory right of way is for accessing underground storm water pipe; accordingly all amenities over the ROW will be removable and the ground will be able to be excavated; • The difference in the design is the addition of the upper floor which is required for back of house; the interior square footage is 11,779.6 sq. ft., which is larger than the original design but comes with a similar occupancy load; • There is a street face on all four sides; the long façade from the north end parking area with the least visibility is for back of house; • There is a combination of methods to buffer noise from the highway on the patio: o Have enclosed patio and open above; o Taller glass panels and landscaping trees; and o Regulating height of seating with height of panels. • Would have to look into technical details with respect to suggestion to remove parking stall in order to extend the sidewalk; could create pinch points for other stalls; • There will be lighting to highlight the different concrete textures; the deeper grooves are an inch deep; the concrete tone is warm and will show contrast at the joints; • There are both customer and staff washrooms located upstairs; • The walkway around the patio will be wide enough and fully accessible; • The “Open to Below” space on the second floor is to enable overhead maintenance access for equipment located on the first floor garbage room; • To accommodate the increased popularity of delivery services, a dedicated delivery pick-up window is being located on the east (200 Street) elevation; • The north side of the building has a textured panel and will have a slightly slicker texture to allow for easy maintenance and anti graffiti; • The janitor’s room on the second floor services the upstairs washrooms; --- page 6 --- ADP Minutes – November 22, 2023 5 • There are no plans for signage other than on the building and what is within the landlord’s podium. The applicant team left the meeting. In response to a question from one of the Panel members, staff advised that they will find out if there will be a fence around the detention pond and whether it is intended to be a feature or just a planting area. The Panel compiled a list of recommendations for the applicant. It was MOVED and SECONDED THAT: 1. The ADP receive the staff report dated November 15, 2023 for information; and 2. The ADP recommends the applicant give further consideration to the following prior to the application proceeding to Council: a. Update landscape design to emphasize west coast modern aesthetic (e.g. ferns and evergreens) b. Consider updating the landscape strips in the parking lot to the west and north of the building, including replanting and widening them as possible c. Provide a double row of trees along the south property line, and provide additional trees elsewhere in the parking area (and provide sufficient soil volume for new trees) d. Review the width of the sidewalks abutting the building’s north and south, including using a letdown at the north garage door, and review pedestrian accessibility around the rest of the building perimeter e. Relocate the bicycle rack to be closer to the building entrance f. Utilize sound attenuation and security measures for the seasonal patio g. Provide more design interest and contrast on larger walls along the north and east elevations, including updating the north façade to mitigate the prominence of the garage door (e.g. additional variety, second floor fenestration, art) and using wood-tone vertical features and additional fenestration into the back-of-house area on the east (e.g. enlarging the horizontal band) h. Update the material of the entry post on the building’s northwest (e.g. wood post, cedar panels) i. Consider an entry-specific ground surface material (e.g. pavers, flooring pattern spilling from interior outwards) j. Provide more information on planting program’s resilience to climate change k. Enhance river rock areas on west of building with larger/taller boulders l. Provide more information on the building’s lighting program, including providing a night rendering --- page 7 --- ADP Minutes – November 22, 2023 6 m. Review height of signage and update height and placement as necessary to provide visibility CARRIED Staff made notation to: a. Review storm pipe routing from detention pond; and b. Review safety and intent of detention pond. 4) NEXT MEETING January 2024 5) ADJOURNMENT It was MOVED and SECONDED THAT the meeting adjourn at 8:26 pm. CARRIED __________________________________ ADVISORY DESIGN PANEL CHAIR __________________________________ CORPORATE OFFICER --- page 8 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject: Development Permit Application DP 12 - 23 Rezoning Application RZ 10-23 (20256-20272 54A Avenue) File #: 6620.00 From: Anton Metalnikov, RPP, MCIP Planner Bylaw #: 3272 Doc #: Date: February 29 , 2024 RECOMMENDATION: THAT this report be received for information. PURPOSE OF REPORT: To consider Development Permit and Zoning Bylaw amendment applications by Paramorph Architecture Inc. for a 6-storey, 114-unit apartment development at 20256-20272 54A Avenue. POLICY: The subject properties are currently zoned RS1 Single Family Residential and RM1 Multiple Residential Low Density Zone in Zoning Bylaw No. 2100 and designated “Mid Rise Residential” in the Official Community Plan Land Use map. All lands designated for multi-unit residential use are subject to a Development Permit (DP) to address building form and character. The density of the proposed development complies with the Official Community Plan but exceeds the parameters in the current Zoning Bylaw. As such, a Comprehensive Development Zone is proposed to accommodate it. --- page 9 --- To: Advisory Design Panel Date: February 29, 2024 Subject: Development Permit Application DP 12-23 & Rezoning Application RZ 10-23 Page 2 COMMENTS/ANALYSIS: Background Information: Applicant: Paramorph Architecture Inc. Owner: SP (Linwood 2) Holdings Inc. Civic Address es : 20256-20272 54A Avenue Legal Description: Strata Lots 1 & 2, District Lot 305, Group 2, New Westminster District, Strata Plan NW1661; Lots 14 & 15, District Lot 305, Group 2, New Westminster District, Plan 8109 Site Area: 2,756 m 2 (0.68 acres) Number of Units: 114 apartments Gross Floor Area: 7,437 m 2 (80,051 ft 2 ) Floor Area Ratio: 2.698 Lot Coverage: 47% Total Parking Required: 163 spaces (including 8 h/c spaces) *RM3 requirement Parking Provided: Resident Visitor Total 121 spaces 17 spaces 138 spaces (including 7 h/c spaces) OCP Designation: Mid Rise Residential Existing Zoning: RS1 Single Family Residential RM1 Multiple Residential Low Density Proposed Zoning: CD94 Comprehensive Development Variances Requested: Combined storage and bike parking (required to be separate) 2.4 m wide small car spaces (2.5 m required) 17 visitor parking spaces (23 required) Note a resident parking variance is not required due to the use of CD Zone – see staff commentary in Variances section of this report for further details and rationale Development Cost Charges: $ 2,176,222.00 (City - $ 1,014,950.00 , GVS&DD - $461,650.00, GVWD - $458,986.00, SD35 - $64,400.00, TransLink - $176,236.00) Community Amenity Contributions (CACs): $464,000.00 --- page 10 --- To: Advisory Design Panel Date: February 29, 2024 Subject: Development Permit Application DP 12-23 & Rezoning Application RZ 10-23 Page 3 Discussion: 1. Context The applicant is proposing to develop a 6-storey, 114-unit apartment building on a site consisting of one duplex and two single-detached homes. The site is located in an established higher-density residential area hosting townhomes and apartment buildings of various sizes and ages, along with several new developments recently completed and other sites under active applications. The site’s primary frontage is formed on the north by 54A Avenue, a short local road across from which stands Manoah Manor, a 3-storey non-profit seniors apartment building completed in 1990. City lanes to the south and east provide additional access and separate the site from Oxford Court, a 4-storey apartment building completed in 1993, and a few single-family homes respectively. The site is flanked to the west by the 3-storey Arbutus Court apartment building (1994). Site context Subject Site Arbutus Court 6 - storey apartment buildings in application Oxford Court Manoah Manor 6-storey apartment building U/C 8-storey apartment building U/C 5-storey apartment application --- page 11 --- To: Advisory Design Panel Date: February 29, 2024 Subject: Development Permit Application DP 12-23 & Rezoning Application RZ 10-23 Page 4 The site is well positioned with connections to retail and service areas, with Downtown located within a few minutes’ walk. It also benefits from proximity to key neighbourhood amenities, including: • Linwood Park (few minutes’ walk); • Timms Community Centre (5-to-10-minute walk); and • Nicomekl Elementary School (10-minute walk). The site is also located near several transportation services, including: • Six local and regional bus lines within a 5-minute walk; • The frequent 503 Fraser Highway Express bus (5 to 10-minute walk); and • The planned 203 Street SkyTrain station and its associated transit exchange (5 to 10-minute walk). 2. Proposed Rezoning and the Official Community Plan (OCP) The site is designated Mid Rise Residential in the City’s OCP, which allows for apartment development of up to 12 storeys in height and a Floor Area Ratio (FAR) of up to 3.5. The subject properties are proposed to be rezoned to a site-specific Comprehensive Development (CD) Zone as no existing zones adequately accommodate the Mid Rise Residential designation. A new Zoning Bylaw is currently in development and the project was designed to conform to the preliminary draft zoning regulations associated with this designation. Should the CD rezoning be adopted it is anticipated that, as part of adopting the new Zoning Bylaw, the City will rezone this site from its CD Zone to the new zone created to implement the Mid Rise Residential designation. 3. Design The applicant is proposing a wood-frame building with its frontage oriented to 54A Avenue to the north and the lane to the east in an L-shape, which wraps a ground-level courtyard to the southwest. The building sits atop an underground parkade raised slightly above ground, with this raised portion tiered with a step, painted, and topped with landscaping. The parkade is set back from the west property line to enable the retention of all the neighbouring property’s trees, with the additional setback of the building itself allowing for additional trees and landscaping to be planted on the subject site’s side of the boundary. A parkade ramp off the south lane provides access to the two-level underground parkade reserved for residents, while visitor parking is provided off the lanes at grade. The building’s base emphasizes the entrance on the corner and makes use of white fibre-cement panelling and wood-tone aluminum features rising from floor level to above the second storey along the rest of the street frontage to emulate --- page 12 --- To: Advisory Design Panel Date: February 29, 2024 Subject: Development Permit Application DP 12-23 & Rezoning Application RZ 10-23 Page 5 a townhome expression. These materials are complemented with grey fibre- cement panelling to ground the building “base” while making way for a lighter building “top” and wood-tone accents, particularly on the balcony insets and soffits. Extruded frame features serve to delineate the different façade sections and highlight elements like the building entrance and courtyard. The development’s landscaping wraps the outside edge of the site with various shrub species and trees, with a larger planting area capitalizing on the building’s west setback. A ground-floor courtyard provides an additional large, landscaped area, with seating and dining areas included among plantings and trees. A total of 46 trees are proposed on-site, with additional street trees to be provided as part of required frontage upgrades. A second outdoor amenity area on the roof adds a cooking facility and 17 garden plots, along with additional planting beds. This rooftop area is set back from the roof edges for safety and privacy. The unit type distribution of the building includes 18 studios, 69 one-bedroom units, and 27 two-bedroom units. 24 (21%) of the units are adaptable. Resident storage facilities are provided in storage rooms in both underground parkade levels as well as within in-unit storage rooms. 772 m 2 (8,304 ft 2 ) of total amenity space is provided in the building, including 204 m 2 (2,192 ft 2 ) of indoor amenity space and 568 m 2 (6,112 ft 2 ) of outdoor amenity space split between the ground- level courtyard and the rooftop deck. A two-elevator core services the building. 4. Sustainability The proposal incorporates several sustainable development features, including: • Using construction techniques that minimize site disturbance and protect air quality; • Using lighting systems meeting ground-level and dark skies light pollution reduction principles; • Incorporating a construction recycling plan; • Achieving an energy performance over 25% above the current Model National Energy Code; • Reducing the heat island effect by use of landscaping and a rooftop amenity area; • Using non-water dependent and drought-tolerant materials in the landscape design served by an irrigation system with central control and rain sensors; • Providing resident garden plots; • Using water-conserving toilets; • Providing outlets for e-bike charging in all bike/storage lockers; and • Providing 12 resident parking stalls with Level II electric vehicle (EV) chargers, with the remaining resident spaces pre-wired and visitor spaces pre-ducted for future installation. --- page 13 --- To: Advisory Design Panel Date: February 29, 2024 Subject: Development Permit Application DP 12-23 & Rezoning Application RZ 10-23 Page 6 5. CPTED The applicant’s proposal benefited from a comprehensive Crime Prevention Through Environmental Design (CPTED) review by a qualified consultant whose recommendations were incorporated into the plans. 6. Variances As noted above, the applicant’s proposed development is generally consistent with the draft 6-12 storey apartment building zoning regulations that are being considered for the new Zoning Bylaw to implement the Official Community Plan’s Mid Rise Residential land use designation. However, given the proponent has applied to redevelop the site prior to the adoption of the new Zoning Bylaw, a site-specific Comprehensive Development (CD) Zone is proposed to be created to accommodate the redevelopment. Despite the use of a CD Zone, the proposal requires variances from general Zoning Bylaw provisions to provide bicycle parking within storage lockers, reducing the width of small car parking spaces, and reducing the number of visitor parking spaces. Staff support these variances per the rationales below. The accommodation of bicycle parking spaces within storage lockers, rather than in separate bicycle parking rooms, is supported as the applicant has enlarged their storage lockers beyond the Zoning Bylaw requirement (5.67 m 3 or 200 ft 3 ) to a minimum of 9 m 3 (318 ft 3 ), which is an increase of 59%. Staff note that shared bicycle parking and storage lockers are being considered in the new Zoning Bylaw to allow for more flexibility and efficiency in their configuration. The applicant is also requesting a variance to reduce the width of the small car spaces to 2.4 metres from the 2.5 metres required in the Zoning Bylaw. This adjustment was made to ensure this application meets the 138-space target that aligns with the residential rates being considered for the new Zoning Bylaw (additional discussion below). Reducing the width of small car spaces to 2.4 metres is under consideration for the new Zoning Bylaw to accommodate additional parking spaces in all development projects. This width is also similar to other municipalities in the region, such as Burnaby, which has a minimum small car space width of 2.4 metres, and Richmond, which has a minimum small car space width of 2.3 metres. Staff are not considering changes to the required drive aisle widths in the Zoning Bylaw to ensure safe and easy vehicle movements in parking areas are maintained. Proposed Parking If the current Zoning Bylaw requirement for a similar type of building (i.e. RM3 Zone) was applied to this application, the applicant’s proposed overall parking --- page 14 --- To: Advisory Design Panel Date: February 29, 2024 Subject: Development Permit Application DP 12-23 & Rezoning Application RZ 10-23 Page 7 amount is 15.4% less than what would be required. Given that a CD zone is being proposed for this development, technically a variance is only required for visitor parking, along with those previously outlined. However, it is important to note that staff support the applicant’s overall parking approach, as the proposal (less 25 spaces or 15.4%) meets the rates under preliminary consideration for the new Zoning Bylaw. These rates are being contemplated based on research work conducted by the City’s Zoning Bylaw update consultant and staff to date, which has included a review of the Metro Vancouver Parking Study as well as of parking rate requirements in other municipalities within the Lower Mainland. The project site is within the “Shoulder” of the OCP, which generally refers to properties within a 5-to-10-minute walk of the future SkyTrain station. If the preliminary “Shoulder” area rates being considered for the new Zoning Bylaw were applied to this application, 138 parking spaces would be required, based on rates of 1.0 spaces per studio and 1-bedroom unit, 1.25 spaces per 2- bedroom unit (=121 resident spaces), and 0.15 visitor spaces per unit (=17 visitor spaces). This total is equal to the applicant’s proposed parking amount of 138 spaces and is 15.4% less than the current RM3 Zone requirement of 163 spaces, which is based on rates of 1.2 spaces per studio and 1-bedroom units, 1.3 spaces per 2-bedroom unit (=140 resident spaces), and 0.2 visitor spaces per unit (=23 visitor spaces). Similar variances have recently been approved by Council in the nearby area at 20191 53A Avenue (13% reduction), 20142 53A Avenue (14.5% reduction), and 20230 56 Avenue (15% reduction). Staff also note that this site is located within 800 metres of the future Langley City Centre SkyTrain station at 203 Street. Under Bill 47, adopted by the Province of British Columbia in November 2023 to amend the Local Government Act , this places the site within the future Langley City Centre Station “Transit-Oriented Area” (TOA) which the City of Langley is required to adopt by June 30, 2024. Under this new legislation, once the TOA is adopted, the City would not have the authority to set or enforce minimum residential parking requirements for this site. Based on the above commentary and analysis, staff support these variances. 7. Summary The proposed development is consistent with the City’s OCP and Development Permit Area guidelines for the area and presents a transit-supportive and efficient design providing housing in close proximity to parks, transit, and Downtown. --- page 15 --- To: Advisory Design Panel Date: February 29, 2024 Subject: Development Permit Application DP 12-23 & Rezoning Application RZ 10-23 Page 8 Engineering Requirements: Additional design changes may be required upon further investigation, site inspections and receipt of other supporting reports and documents. All work to be done to the City of Langley’s Design Criteria Manual (DCM). Per the City’s DCM requirement, the developer and their consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Commitment by Owner and Consulting Engineer) prior to starting their design works. Per the City’s Watercourse Protection Bylaw No. 3152, the developer’s consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Confirmation of Commitment by Qualified Environmental Professional - QEP) prior to starting their site monitoring works. These requirements have been issued to reflect the application for development for a proposed 114 Unit Multi-Family Development located at 20256-20272 54A Ave . These requirements may be subject to change upon receipt of a development application . The City’s Zoning Bylaw, 1996, #2100 has requirements concerning landscaping for buffer zonings, parking and loading areas, and garbage and recycling containers, all of which applies to this design. A) The developer is responsible for the following work which shall be designed by a Professional Engineer: I. A Qualified Environmental Professional (QEP) must be engaged to implement erosion and sediment control in accordance with the City of Langley Watercourse Protection Bylaw #3152, as amended. II. A storm water management plan for the site is required. Rainwater management measures used on site shall limit the release rate to pre- development levels to mitigate flooding and environmental impacts as detailed in the City’s DCM. All calculations shall be based on the updated IDF data for Surrey Kwantlen Park (1962-2013) with 20% added to the calculated results to account for climate change. A safety factor of 10% shall be added to the calculated storage volume. Pre-development release rates shall not include climate change effect. III. All existing services shall be capped at the main by the City, at the Developer’s expense prior to applying for a Demolition permit. --- page 16 --- To: Advisory Design Panel Date: February 29, 2024 Subject: Development Permit Application DP 12-23 & Rezoning Application RZ 10-23 Page 9 IV. New water, sanitary and storm sewer service connections are required. All pertinent pipe design calculations shall be submitted in spreadsheet format and shall include all formulas for review by the City. The Developer’s engineer will determine the appropriate main tie-in locations and size the connections for the necessary capacity. V. The capacity of the existing water and sanitary sewer mains shall be assessed through hydraulic modeling performed by the City’s hydraulic modeling consultant at the Developer’s expense. a. Any upgrade requirement for either sanitary or water mains not covered under the City’s DCC bylaw shall be designed and installed by the Developer at the Developer’s expense. b. At the Developer’s expense, the City’s hydraulic modeling consultant shall conduct a fire hydrant flow test to be used in the City’s water modeling to determine if the existing water network is adequate for fire flows (based on architectural data supplied by the Developer’s Architect). Upgrading of the existing watermain(s) may be necessary to achieve the necessary pressure and flows to conform to Fire Underwriters Survey (FUS) “Water Supply for a Public Fire Protection, a Guide to Recommended Practice, 1995.” VI. Additional C71P fire hydrants may be required to meet bylaw and firefighting requirements. Hydrant locations must be approved by the City of Langley Fire Rescue Service. VII. A property dedication of 1m (+/-) will be required along the Lane frontages of the proposed development to provide a new ROW width of 7m - to be determined by a legal surveyor. 4m corner truncation dedications will also be required on the site’s northeast and southeast corners. There will be no dedication requirement for 54A Ave. VIII. New sidewalk, barrier curb, and gutter will be required along the entire project frontage, complete with boulevard trees and a planting strip based on the City’s DCM Cross-Section SS-R07, using the existing centreline. As a result, the existing curb alignment will be widened by 0.7m (+/-) along the project frontage. The Developer shall contact Engineering Services to obtain City’s Landscaping standards prior to hiring a professional to prepare boulevard trees and a planting strip plan. IX. A traffic impact assessment will be required as per the City’s DCM. X. The condition of the existing pavement along the proposed project’s frontages shall be assessed by a geotechnical engineer. Pavements shall be adequate for an expected road life of 20 years under the expected traffic conditions for the class of road. Road construction and asphalt overlay designs shall be based on the analysis of the results of Benkelman Beam tests and test holes carried out on the existing road which is to be upgraded. If the pavement is inadequate, it shall be remediated at the Developer’s cost. --- page 17 --- To: Advisory Design Panel Date: February 29, 2024 Subject: Development Permit Application DP 12-23 & Rezoning Application RZ 10-23 Page 10 XI. The site layout shall be designed by a civil engineer to ensure that the parking and access layout meets minimum design standards, including setbacks from property lines. Appropriate turning templates should be used to prove parking stalls and drive-aisles are accessible by the design vehicle. XII. Existing and proposed street lighting along the entire project frontage shall be reviewed by a qualified lighting consultant to ensure street lighting and lighting levels meet the City’s DCM standards. XIII. A dedicated on-site loading zone shall be provided by the developer. B) The Developer is required to deposit the following bonding and fees: I. The City will require a Security Deposit based on the estimated construction costs of installing civil works, as approved by the City Engineer. II. The City will require inspection and administration fees in accordance to the Subdivision Bylaw based on a percentage of the estimated construction costs. (See Schedule A – General Requirement - GR5.1 for details). III. A deposit for a storm, sanitary and water services is required, which will be determined by City staff after detailed civil engineering drawings are submitted, sealed by a Professional Engineer. IV. The City will require a $40,000 bond for the installation of a water meter to current standards. V. A signed and sealed pavement cut form (Form F-2 of the City’s DCM) shall be completed by the developer’s consulting engineer. Upon the review and approval of the City Engineer of the submitted form, the corresponding Permanent pavement cut reinstatement and degradation fees shall be paid by the Developer. NOTE: Deposits for utility services or connections are estimates only. The actual cost incurred for the work will be charged. The City will provide the developer with an estimate of connections costs, and the Developer will declare in writing that the estimate is acceptable. C) The Developer is required to adhere to the following conditions: I. Unless otherwise specified, all engineering works shall be designed based on the City’s DCM specifications in accordance with the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 II. Undergrounding of hydro, telecommunication to the development site is required, complete with underground or at-grade transformer III. Transformers servicing developments are to be located on private property with maintenance access located on private property. All transformers to be wrapped upon installation by the Developer. IV. All survey costs and registration of documents with the Land Titles Office are the responsibility of the developer/owner. Please refer to the City’s --- page 18 --- To: Advisory Design Panel Date: February 29, 2024 Subject: Development Permit Application DP 12-23 & Rezoning Application RZ 10-23 Page 11 Subdivision and Development Servicing Bylaw 2021, No. 3126 for more details. V. A water meter is required to be installed on private property, preferably in the mechanical room, in accordance to the City's DCM standards at the Developer's cost. VI. An approved backflow prevention assembly must be installed on the domestic water connection immediately upon entering the building to provide premise isolation. VII. A Stormceptor or equivalent oil separator is required to treat site surface drainage. VIII. A complete set of record drawings (as-constructed), service record cards, a completed tangible capital asset form (TCA) all sealed by a Professional Engineer shall be submitted to the City within 60 days of the substantial completion date. Digital drawing files in .pdf and .dwg formats shall also be submitted. All the drawing submissions shall: a. Use City’s General Note Sheet and Title Block; and b. Closely follow the format and sequence outlined in the City’s DCM that will be provided to the Developer’s Consulting Engineer. IX. The selection, location and spacing of street trees and landscaping are subject to the approval of the City Engineer. Please refer to the City’s DCM for more details. X. Stormwater run-off generated on the site shall not impact adjacent properties, or roadways. XI. Garbage and recycling enclosures shall accommodate on the site and be designed to meet Metro Vancouver’s “Technical Specifications for Recycling and Garbage Amenities in Multi-family and Commercial Developments - June 2015 Update.” Please refer to the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 for more details. Fire Department Comments: Fire department access for the whole project was reviewed to ensure adequate access was in place for apparatus and firefighters. A construction fire safety plan shall be completed, complete with crane inspection records. A progressive standpipe installation will be required as construction rises. Standpipes will be required on exterior of both rooftop stairways. Standpipes will be required at the parkade entrance, and in both elevator lobby refuge areas. All garbage/recycling containers must be stored in a fire rated, sprinklered room, and must be of adequate size to prevent spillover into adjacent area. Stairwells must be constructed to accommodate shelter in place applications. Marked Exits must not be on a fob. A radio amplification bylaw is currently in development and will need to he adhered to. Consideration will be given to the installation of power banks in the storage room lockers for e-bikes charging. A Fire Safety plan and FD lock box (knox box) will be required before occupancy. The 4” FDC will be located on --- page 19 --- To: Advisory Design Panel Date: February 29, 2024 Subject: Development Permit Application DP 12-23 & Rezoning Application RZ 10-23 Page 12 a pedestal at the front of the building, exact location to be discussed with the Fire Department at a later date. Advisory Design Panel: In accordance with Development Application Procedures Bylaw No. 2488, the subject Zoning Bylaw amendment and Development Permit application will be reviewed by the Advisory Design Panel (ADP) at the March 13, 2024 meeting. According to the Council-approved ADP Terms of Reference, the ADP is to provide form and character and urban design-related advice and recommendations for Council’s consideration. ADP recommendations will be presented to Council through the ADP meeting minutes and, if applicable, through an additional City staff report, prior to Council consideration of the proposed Zoning Bylaw amendment and Development Permit Applications. A copy of the ADP minutes will be presented to Langley City Council at a future Regular Council meeting. BUDGET IMPLICATIONS: In accordance with Bylaw No. 2482, the proposed development would contribute $1,014,950.00 to City Development Cost Charge accounts and $464,000.00 in Community Amenity Contributions. Prepared by: _______________________ Anton Metalnikov, RPP, MCIP Planner Concurrence: __________________________ Roy M. Beddow, RPP, MCIP Deputy Director of Development Services --- page 20 --- To: Advisory Design Panel Date: February 29, 2024 Subject: Development Permit Application DP 12-23 & Rezoning Application RZ 10-23 Page 13 Concurrence: _______________________ Carl Johannsen, RPP, MCIP Director of Development Services Concurrence: Concurrence: __________________________ __________________________ David Pollock, P.Eng. Scott Kennedy, Fire Chief Director of Engineering, Parks, & Environment Attachments --- page 21 --- To: Advisory Design Panel Date: February 29, 2024 Subject: Development Permit Application DP 12-23 & Rezoning Application RZ 10-23 Page 14 DEVELOPMENT PERMIT APPLICATION DP 12-23 REZONING APPLICATION RZ 10-23 Civic Addresses: 20256-20272 54A Avenue Legal Description: Strata Lots 1 & 2, District Lot 305, Group 2, New Westminster District, Strata Plan NW1661; Lots 14 & 15, District Lot 305, Group 2, New Westminster District, Plan 8109 Applicant: Paramorph Architecture Inc. Owner: SP (Linwood 2) Holdings Inc. --- page 22 --- --- page 23 --- --- page 24 --- --- page 25 --- --- page 26 --- --- page 27 --- --- page 28 --- --- page 29 --- --- page 30 --- --- page 31 --- --- page 32 --- --- page 33 --- --- page 34 --- --- page 35 --- --- page 36 --- --- page 37 --- --- page 38 --- --- page 39 --- --- page 40 --- --- page 41 --- --- page 42 --- --- page 43 --- --- page 44 --- --- page 45 --- --- page 46 --- --- page 47 --- --- page 48 --- --- page 49 --- --- page 50 --- --- page 51 --- --- page 52 --- --- page 53 --- --- page 54 --- --- page 55 --- --- page 56 --- --- page 57 --- --- page 58 --- --- page 59 --- --- page 60 --- --- page 61 --- --- page 62 --- --- page 63 --- --- page 64 --- --- page 65 --- --- page 66 --- --- page 67 --- --- page 68 --- --- page 69 --- --- page 70 --- --- page 71 --- --- page 72 --- --- page 73 --- --- page 74 --- --- page 75 --- --- page 76 --- --- page 77 --- --- page 78 --- --- page 79 --- --- page 80 --- --- page 81 --- --- page 82 --- --- page 83 --- --- page 84 --- --- page 85 --- --- page 86 --- --- page 87 --- --- page 88 --- --- page 89 --- --- page 90 ---