Agenda - Advisory Design Panel Source: https://www.langleycity.ca/media/file/adp-agenda-april-3-2024 Archived copy: https://heylangley.ca/records/city-of-langley/committees/advisory-design-panel/2024/2024-04-03-agenda-adp-agenda-april-3-2024.pdf SHA-256 of the PDF: 269dc822355799d8dd98d547a2029b92b80ec794deab3d109a9dda98ec759d61 Fetched: 2026-11-10 --- page 1 --- ADVISORY DESIGN PANEL WEDNESDAY, APRIL 3, 2024 AT 7:00 PM Council Chambers Langley City Hall (In-Person Meeting) A G E N D A 1) AGENDA Adoption of the April 3, 2024 agenda. 2) MINUTES Adoption of minutes from the March 13, 2024 meeting. 3) DEVELOPMENT PERMIT APPLICATION DP 13-23 ZONING BYLAW AMENDMENT APPLICATION RZ 11-23 5-storey, 132-unit apartment building at 20719-20731 Eastleigh Crescent. 4) DEVELOPMENT PERMIT APPLICATION DP 10-23 ZONING BYLAW AMENDMENT APPLICATION RZ 09-23 26-unit townhome complex at 5030-5064 208 Street & 20845 50A Avenue. 5) NEXT MEETING April 24, 2024. 6) ADJOURNMENT --- page 2 --- Document Number: 193610 MINUTES OF THE ADVISORY DESIGN PANEL HELD IN COUNCIL CHAMBERS, LANGLEY CITY HALL WEDNESDAY, MARCH 13, 2024 AT 7:01 PM Present : Councillor Paul Albrecht (Chair) Councillor Mike Solyom (Co-Chair) Mayor Nathan Pachal Blair Arbuthnot Matt Hassett Leslie Koole Dammy Ogunseitan Tony Osborn Ritti Suvilai Ella van Enter Absent: Jaswinder Gabri Cst. Dennis Bell Staff: R. Beddow, Deputy Director of Development Services C. Johannsen, Director of Development Services K. Kenney, Corporate Officer A. Metalnikov, Planner Chair Albrecht began by acknowledging that the land on which we gather is on the traditional unceded territory of the Katzie, Kwantlen, Matsqui and Semiahmoo First Nations. 1) AGENDA Adoption of the March 13, 2024 agenda. It was MOVED and SECONDED THAT the agenda for the March 13, 2024 Advisory Design Panel be approved. CARRIED --- page 3 --- ADP Minutes – March 13, 2024 2 2) MINUTES Adoption of minutes from the November 22, 2023 meeting. It was MOVED and SECONDED THAT the minutes of the November 22, 2023 Advisory Design Panel meeting be approved as circulated. CARRIED 3) ADVISORY DESIGN PANEL INTRODUCTION & ORIENTATION Introductions of Panel members and staff were made. Carl Johannsen, Director of Development Services provided an overview of the meeting process for tonight’s meeting for the benefit of new members. Roy Beddow, Deputy Director of Development Services provided information to the Panel on the following: • Official Community Plan (OCP): o Purpose o Five Key Themes o Land Use Map highlights o Land Use Designations o Urban Design Principles o Development Permit Area Guidelines o DP Guidelines – Form & Character o Appendices to Official Community Plan • Zoning Bylaw; and • Zoning Bylaw Update. Anton Metalnikov, Planner, provided information to the Panel on the following: • New Provincial legislation: • Transit Oriented areas (TOAs); • Small-Scale Multi-Unit Housing (SSMUH); • Master-Planned Sites. Mr. Metalnikov responded to questions from Panel members, advising that: o the new provincial legislation allowing four building units per lot does not preempt the City’s rezoning requirements; and o as part of his presentation he will explain changes to the City’s public hearing processes as a result of the new provincial legislation; Mr. Metalnikov provided further information on the following: • Typical Application Process (Rezoning and DP) and new public input process for residential rezonings, which replaces public hearings; • Recent Projects; and • 2023 ADP Results-Before and After designs. --- page 4 --- ADP Minutes – March 13, 2024 3 Carl Johannsen, Director of Development Services provided information on the Terms of Reference of the Advisory Design Panel. Kelly Kenney, Corporate Officer provided information on meeting procedures, referencing and providing examples from the following guidance documents: • Community Charter; • Council Procedure Bylaw; and • ADP’s Terms of Reference. In response to a question from a Panel member, Mr. Johannsen advised that: • staff will report back to the Panel with the results of two public surveys undertaken as part of the Zoning Bylaw update process; • once the new Zoning Bylaw is drafted it will be made available to the public on the City’s website and staff can provide an update to the Panel at that time and receive feedback from Panel members on the draft bylaw; and • Staff can provide a link to the current Zoning Bylaw update webpage to Panel members. The Chair and staff advised members on various meeting logistics including receipt of their agendas, review of staff reports and the availability of meeting microphones. In response to questions from Panel members; staff advised that: • the development process from submission of the application to breaking ground at the development site takes approximately a year to a year and a half. • only 5 to 10 percent of the ADP’s recommendations are not actioned by developers, and in doing so are required to explain why they are not actioning them. 4) DEVELOPMENT PERMIT APPLICATION DP 12-23 ZONING BYLAW AMENDMENT APPLICATION RZ 10-23 20256-20272 54A Avenue. Anton Metalnikov, Planner, spoke to the staff report dated February 29, 2024 and provided a brief overview of the Development Permit application. In response to a question from a Panel member, Mr. Metalnikov advised that there are no plans to turn 54A Ave. into a one-way street, rather, staff are looking to have the roadway widened as part of the development applications’ frontage upgrades on this block. --- page 5 --- ADP Minutes – March 13, 2024 4 The Applicant team entered the meeting: Harp Saran – President, Development – Scale Projects David Eaton – Senior Architect – ParaMorph Architecture David Stoyko – Landscape Architect – David Stoyko Landscape Architect Manika Grover – Project Manager, Intern Architect – ParaMorph Architecture Aman Jain – Architectural Technician – ParaMorph Architecture Mr. Eaton presented the application, providing an overview of the development with details on the following: • North elevation rendering; • Site and building details (program summary); • Aerial site plan; • Location renderings; • Building renderings; • Detailed site plan showing amenity areas/garbage, and parking areas; • Rooftop site plan; and • Elevation renderings. Mr. Stoyko provided an overview of the landscape plan, with details on the following: • Street frontage; • Courtyard amenities; • Roof plan amenity spaces; and • Types of plantings. Panel members provided feedback on the form and character of the development and discussion took place regarding the following: • ensure doors are auto closing throughout the development; • Consider widening the canopies over sixth floor balconies to make them as wide as the balconies; • the main façade in centre of the building lacks personality, consider stronger features, a colour other than grey for centre square on building, and extend features on the first floor exterior vertically; • ensure there is adequate lighting in lane for intercom, accessible visitor parking area, and at entrance and exit to parkade ramp; • make windows bigger in the centre units to bring in more light; • determine whether there is a way to extend the accessible ramp and reduce its grade; • update renderings to show mirrored panel that you intend on patio guardrails for accuracy to see the effect; they may possibly reflect light in the courtyard in a negative way; • as every unit in the courtyard will be able to see the garbage enclosure in the rear courtyard, should make it a design feature; • solar shading on south side is a missed opportunity; • it is rather a circuitous route to get from the units to the amenities in the courtyard; • the rooftop area seems rather plain; --- page 6 --- ADP Minutes – March 13, 2024 5 • could see people parking in lane for pick-ups and drop offs as its easier to get to the door; will need to discourage this; and • programming a children’s play area within the outdoor amenity space. In response to questions from Panel members, the applicant team advised that: • There will be air conditioning for every unit; • There are two types of lock ups; • The planters with trellis will have vines in planters that will grow up the trellis; • There will be soft surfacing for the rooftop amenity areas; • None of the outdoor amenity spaces were specifically programmed for a children’s play area as the amenity areas were intended to be flexible multi-use spaces; • The firepit cannot be relocated from the courtyard to the rooftop given the roof’s soft surfacing; fencing around the courtyard will prevent access to the courtyard from the street; • the large indoor amenity space will have a fitness room on one side and a lounge with full kitchen, tv, and couch on the other side; some outdoor amenities include an off leash dog area and pet wash area and a compartment for communal tools and appliances; • the building design is considered precedent setting by the applicant because of the following elements: o its extensive use of simulated wood features; o its modern style; o its use of colours that are the current trend (white, grey, and black); o its L-shape; o its use of aluminum reflective element at the entry; • all entrances are accessible, there is accessible parking in the parkade and in the lane, and wide passages in the building; • they have tried to keep the accessible parking stalls as close as possible to building entrances; • there is an 8 percent grade on the accessible ramp; • the balcony covers are intended as sun shades not as rain protection; • the gates between the courtyard and public property will be 6ft. high; • the roof top amenity space on the roof is the size it is in order to set it back so it won’t be visible from the street; currently the development has more amenity space than what is required under City bylaws and policies; • Evergreen Magnolia will be used in the landscaping; • the main entrance will have smaller modules to differentiate it from the rest of the building patterns; • it would not be practical to use a more decorative, textured surface on the accessible ramp as the surface needs to be smooth for wheelchair access; --- page 7 --- ADP Minutes – March 13, 2024 6 • under the new Building Code, the developer is limited as to the amount of glazing that can be used, but they will look at it as part of their mandate; • the centre units are south facing, which will bring light into these units; • the current placement of the stairs was to accommodate a parking stall beneath; however, the design team can look at repositioning the stairs to allow for larger windows in the adjacent units; • are amenable to improving the look of the garbage enclosure by surrounding it with trellised fencing; • although the developer acknowledges the six units in the centre of the development won’t get as much light as other units in the development, the rationale for having these six smaller units was to provide an additional level of affordability in the development; • each of the six centre units have privacy screens to ensure privacy and the outside amenity is private to those units; • the six smaller units will have a murphy bed or futon; • in order to make a more direct route from units to amenities in the courtyard, the can explore taking the edge off the corner of the building; • typically the accessible ramp does not have a heated surface;s • mechanical doors will be put in wherever they are required; • they will be making sure slope is stable; have completed review of the trees with arborist, some trees will be retained; • in order to reduce the heat island effect, a heat resistant coating will be applied to the roof top surface; they have been advised by the vendor that this coating lasts between five to seven years before needing maintenance; and • some features include e-bike charging stations and e-bike maintenance space; as well as a pet wash area and common tool storage area. The applicant team left the meeting. In response to questions from Panel members, Mr. Johannsen advised that: • staff can report back with information on adaptable unit requirements; • staff will review scalability of the gate enclosing the courtyard; Panel members provided further feedback as follows: • would like to know what size bed could fit into den space; • ensure there is adequate sound-proofing between rooftop amenity area and units below, as well as between units with living room-to-bedroom interfaces; • have lighting on recessed north east corner plaza; • determine if there is enough room for scooters to navigate corner of accessible ramp; • extend covering over more of the accessibility ramp on north side. The Panel compiled a list of recommendations for the applicant. --- page 8 --- ADP Minutes – March 13, 2024 7 It was MOVED and SECONDED THAT: 1. The ADP receive the staff report for information; and 2. The ADP recommends the applicant give further consideration to the following prior to the application proceeding to Council: a. Ensure accessible entrances and hardware are provided on accesses to the building, amenity areas, storage lockers, and other shared spaces; b. Consider widening 6 th floor balcony covers to ensure they, at a minimum, match the width of balconies; c. Review opportunities to provide more design interest to the central top on the north elevation (e.g. extending/adding balcony covers, adding a cornice, etc.); d. Review the height and design of the fence between the courtyard and the rear lane for security; e. Review location of the intercom at the rear lane to ensure the courtyard is fully secure; f. Confirm lighting along the rear lane, visitor parking stalls, and accessible ramp, add lighting along the parkade ramp walls, and consider possible pedestrian safety enhancements along the rear and side lanes; g. Consider potential of reducing the slope of the accessible ramp, expanding its turning radius, and providing coverage to prevent snow & ice build-up; h. Review opportunities to bring more light into smaller, centrally-located units; i. Update renderings to more accurately show mirrored panel balcony guardrails, and review potential of light glare and other negative impacts j. Add garbage enclosure, fencing, and dog run to massing models and renderings, and give the garbage enclosure greater consideration as a design feature (e.g. “pavilion in a park”, trellised area, green roof, etc.); k. Consider rotating the southeast exit stair or repositioning it to provide adjacent units more exterior wall and window area; l. Incorporate more detail on indoor amenity programming in drawings m. Add solar shading to south-side windows; n. Review opportunities to improve circulation between the building and the various activity areas in the courtyard, with consideration to desire lines; o. Consider interventions to discourage vehicle drop-off on the lane; p. Consider a children’s play area within the outdoor amenity space; q. Provide information on the minimum bed size which would fit within unit dens; and r. Review noise transfer mitigation measures, including between the rooftop patio and the units below, and between units with living room-to- bedroom interfaces. CARRIED --- page 9 --- ADP Minutes – March 13, 2024 8 Staff note: Provide more information on adaptable unit requirements. 5) NEXT MEETING April 3, 2024 April 24, 2024 (to be confirmed) 6) ADJOURNMENT It was MOVED and SECONDED THAT the meeting adjourn at 9:27 pm. CARRIED __________________________________ ADVISORY DESIGN PANEL CHAIR __________________________________ CORPORATE OFFICER --- page 10 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject: Development Permit Application DP 1 3 - 23 Rezoning Application RZ 11-23 (20719-20731 Eastleigh Crescent) File #: 6620.00 From: Anton Metalnikov, RPP, MCIP Planner Bylaw #: 3277 Doc #: Date: March 22, 2024 RECOMMENDATION: THAT this report be received for information. PURPOSE OF REPORT: To consider Development Permit and Zoning Bylaw amendment applications by Whitetail Homes Ltd. for a 5-storey, 132-unit apartment development at 20719- 20731 Eastleigh Crescent. POLICY: The subject properties are currently zoned RM1 Multiple Residential Low Density Zone in Zoning Bylaw No. 2100 and designated “Low Rise Residential” in the Official Community Plan Land Use map. All lands designated for multi-unit residential use are subject to a Development Permit (DP) to address building form and character. The density of the proposed development complies with the Official Community Plan but exceeds the parameters in the current Zoning Bylaw. As such, a Comprehensive Development Zone is proposed to accommodate it. --- page 11 --- To: Advisory Design Panel Date: March 22, 2024 Subject: Development Permit Application DP 13-23 & Rezoning Application RZ 11-23 Page 2 COMMENTS/ANALYSIS: Background Information: Applicant: Whitetail Homes Ltd. Owners: 1098010 BC Ltd.; Aime Groleau & Claudette Clouatre Civic Addresses: 20719 - 20731 Eastleigh Crescent Legal Description: Strata Lots 1 & 2, District Lot 37, Group 2, New Westminster District, Strata Plan NW2601; Strata Lots 1 & 2, District Lot 37, Group 2, New Westminster District, Strata Plan NW2602 Site Area: 3,806.6 m 2 (0.94 acres) Number of Units: 132 apartments Gross Floor Area: 7,632.6 m 2 (82,157 ft 2 ) Floor Area Ratio: 2.005 Lot Coverage: 51.7% Total Parking Required: 188 spaces (including 9 h/c spaces) *RM3 requirement Parking Provided: Resident Visitor Total 136 spaces 20 spaces 156 spaces (including 8 h/c spaces) OCP Designation: Low Rise Residential Existing Zoning: RM1 Multiple Residential Low Density Proposed Zoning: CD95 Comprehensive Development Variances Requested: 5.5 m accessible stall length (5.8 m required) 20 visitor parking spaces (27 required) Note a resident parking variance is not required due to the use of CD Zone – see staff commentary in Variances section of this report for further details and rationale Development Cost Charges: $ 2, 542,288 .00 (City - $ 1, 186,832 .00 , GVS&DD - $538,492.00, GVWD - $535,684.00, SD35 - $75,200.00, TransLink - $206,080.00) Community Amenity Contributions (CACs): $528,000.00 --- page 12 --- To: Advisory Design Panel Date: March 22, 2024 Subject: Development Permit Application DP 13-23 & Rezoning Application RZ 11-23 Page 3 Discussion: 1. Context The applicant is proposing to develop a 5-storey, 132-unit apartment building on a site consisting of two duplexes. The site is located in an established higher- density residential area which has seen significant recent development interest resulting in an ongoing transition in line with the City’s Official Community Plan (OCP), with several developments recently completed, under construction, or in the application stage nearby, among other townhomes and apartment buildings. Located at the intersection of two separate grid patterns, the site has frontages on three streets, two of which are classified as local (Eastleigh Crescent and 208 Street) and one of which is an arterial (56 Avenue). These streets separate the site from two 5-storey apartment buildings to the west, a 3-storey apartment complex to the south, 3-storey townhomes kitty corner to the southeast, and a 2- storey apartment complex and a vacant convenience store to the east. The site is also directly abutted by the Ivy Lea apartment building to the north and an older townhome complex to the west, which has a recently completed apartment building (the Eastleigh) on its other side. This neighbouring townhome property meets both the minimum area (1,850 m 2 or 19,913 ft 2 ) and width (30 m or 98 ft) requirements of the City’s standard zone for the Low Rise Residential OCP designation, and would remain a viable redevelopment site on its own. Site context Subject Site 3 - storey apartments 6 - storey apartment buildings in application 3-storey townhomes Ivy Lea 2-storey apartments 5-storey apartments Convenience store 6-storey apartment building 2-storey townhomes Dumais Park Rotary Centennial Park --- page 13 --- To: Advisory Design Panel Date: March 22, 2024 Subject: Development Permit Application DP 13-23 & Rezoning Application RZ 11-23 Page 4 The site is well positioned with connections to retail and service areas given its Downtown location. It also benefits from proximity to key neighbourhood amenities, including: • Dumais and Rotary Centennial Parks (few minutes’ walk); • Douglas Park Elementary School (10-minute walk); and • Timms Community Centre (10-to-15-minute walk). The site is also located near several transportation services, including: • Two local and regional bus lines, including the frequent 503 Fraser Highway Express (immediately adjacent); • The Langley Centre transit exchange and the fifteen bus routes it serves (5-to-10-minute walk); and • The planned Langley City Centre SkyTrain station and its associated transit exchange (10-to-15-minute walk). 2. Proposed Rezoning and the Official Community Plan (OCP) The site is designated Low Rise Residential in the City’s OCP, which allows for apartment development of up to 6 storeys in height and a Floor Area Ratio (FAR) of up to 2.1. The subject properties are proposed to be rezoned to a site-specific Comprehensive Development (CD) Zone as no existing zones adequately accommodate the Low Rise Residential designation. A new Zoning Bylaw is currently in development and the project was designed to conform to the preliminary draft zoning regulations associated with this designation. Should the CD rezoning be adopted it is anticipated that, as part of adopting the new Zoning Bylaw, the City will rezone this site from its CD Zone to the new zone created to implement the Low Rise Residential designation. 3. Design The applicant is proposing a wood-frame building which responds to its three- frontage site with a U-shape. This configuration allows the building to set an active face along each of its adjoining streets and wrap an internal surface-level parking area, which is screened from its neighbouring properties to the rear by a wood-tone metal fence. The underground parking level is raised slightly above ground and buffered with shrubs and trees, with these raised portions painted where lower and clad with brick where higher near the main entrance. This entrance is located along 56 Avenue, while vehicle access is provided off Eastleigh Crescent with a single ramp splitting on-site to the two levels. An outdoor amenity deck covers most of the surface parking level up to the minimum required setbacks and features an indoor amenity pavilion. The 5-storey building steps down to 4 storeys at its north interface with the adjacent apartment building --- page 14 --- To: Advisory Design Panel Date: March 22, 2024 Subject: Development Permit Application DP 13-23 & Rezoning Application RZ 11-23 Page 5 to meet City OCP policy on sensitive transitions in height between new development along Eastleigh Crescent and the existing buildings to their rear. The building’s exterior takes a “base-middle-top” design approach with a brick ground floor, grey cement board panelling on the next three storeys, and a white cement board panel top floor finished with a cornice. Additional design details including extruded metal fins and frames break up these base materials, add colour and texture to the façade, and highlight the building’s entrances. The development’s landscaping wraps the outside edge of the site primarily with Hill’s Yews, Trident Maples, and Chinese Dogwoods, with other varieties incorporated where planting areas are larger. The raised courtyard features additional species among several planter boxes, which also host Snowball trees. A total of 20 trees are proposed on-site, with additional street trees to be provided as part of required frontage upgrades. Eight resident garden plots provide further greenery to the courtyard, which provides outdoor amenity space to the building through cooking, dining, and lounge facilities, along with a children’s play area floored with recycled rubber tiles. The unit type distribution of the building includes 115 one-bedroom units, and 17 two-bedroom units. 28 (21%) of the units are adaptable. Resident storage facilities are provided in common storage rooms located on all residential floors. 796 m 2 (8,568 ft 2 ) of total amenity space is provided in the building, including 137 m 2 (1,472 ft 2 ) of indoor amenity space and 659 m 2 (7,096 ft 2 ) of outdoor amenity space. A two-elevator core services the building. 4. Sustainability The proposal incorporates several sustainable development features, including: • Using construction techniques that minimize site disturbance and protect air quality; • Using lighting systems meeting ground-level and dark skies light pollution reduction principles; • Reducing the heat island effect by use of a landscaped courtyard covering the surface parking area; • Using drought-tolerant materials in the landscape design served by an irrigation system with central control and rain sensors; • Providing resident garden plots; • Using water-conserving toilets; and • Providing 14 resident parking stalls with Level II electric vehicle (EV) chargers, with the remaining resident spaces pre-wired and visitor spaces pre-ducted for future installation. --- page 15 --- To: Advisory Design Panel Date: March 22, 2024 Subject: Development Permit Application DP 13-23 & Rezoning Application RZ 11-23 Page 6 5. CPTED The applicant’s proposal benefited from a comprehensive Crime Prevention Through Environmental Design (CPTED) review by a qualified consultant whose recommendations were incorporated into the plans. 6. Variances As noted above, the applicant’s proposed development is generally consistent with the draft 6-storey apartment building zoning regulations that are being considered for the new Zoning Bylaw to implement the Official Community Plan’s Low Rise Residential land use designation. However, given the proponent has applied to redevelop the site prior to the adoption of the new Zoning Bylaw, a site-specific Comprehensive Development (CD) Zone is proposed to be created to accommodate the redevelopment. Despite the use of a CD Zone, the proposal requires variances from general Zoning Bylaw provisions to reduce the length of accessible parking spaces and reduce the number of visitor parking spaces. Staff support these variances per the rationales below. The accessible parking space variance requested is to reduce their length from 5.8 metres to 5.5 metres. The 5.5 metre length is consistent with the City’s standard parking stall dimension requirements and a review of nearby municipalities (Langley Township, Surrey, Maple Ridge, and Abbotsford) found that all used the same stall length for both standard and accessible parking spaces. Staff are also considering making standard and accessible parking stall lengths consistent in the City’s upcoming new Zoning Bylaw. Proposed Parking If the current Zoning Bylaw requirement for a similar type of building (i.e. RM3 Zone) was applied to this application, the applicant’s proposed overall parking amount is 17.0% less than what would be required. Given that a CD zone is being proposed for this development, technically a variance is only required for visitor parking, along with that previously outlined. However, it is important to note that staff support the applicant’s overall parking approach, as the proposal (less 32 spaces or 17.0%) meets the rates under preliminary consideration for the new Zoning Bylaw. These rates are being contemplated based on research work conducted by the City’s Zoning Bylaw update consultant and staff to date, which has included a review of the Metro Vancouver Parking Study as well as of parking rate requirements in other municipalities within the Lower Mainland. The project site is within the “Shoulder” of the OCP, which generally refers to properties within a 5-to-10-minute walk of the future SkyTrain station. If the --- page 16 --- To: Advisory Design Panel Date: March 22, 2024 Subject: Development Permit Application DP 13-23 & Rezoning Application RZ 11-23 Page 7 preliminary “Shoulder” rates being considered for the new Zoning Bylaw were applied to this application, 156 parking spaces would be required, based on rates of 1.0 spaces per 1-bedroom unit, 1.25 spaces per 2-bedroom unit (=136 resident spaces), and 0.15 visitor spaces per unit (=20 visitor spaces). This total is equal to the applicant’s proposed parking amount of 156 spaces and is 17.0% less than the current RM3 Zone requirement of 188 spaces, which is based on rates of 1.2 spaces per 1-bedroom unit, 1.3 spaces per 2-bedroom unit (=161 resident spaces), and 0.2 visitor spaces per unit (=27 visitor spaces). Similar variances have recently been approved by Council at 20191 53A Avenue (13% reduction), 20142 53A Avenue (14.5% reduction), and 20230 56 Avenue (15% reduction). Based on the above commentary and analysis, staff support these variances. 7. Summary The proposed development is consistent with the City’s OCP and Development Permit Area guidelines for the area and presents a transit-supportive and efficient design providing housing in close proximity to parks, transit, and Downtown. Engineering Requirements: Additional design changes may be required upon further investigation, site inspections and receipt of other supporting reports and documents. All work to be done to the City of Langley’s Design Criteria Manual (DCM), and the City’s Subdivision and Development Servicing Bylaw (SDSB). Per the City’s DCM requirement, the developer and their consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Commitment by Owner and Consulting Engineer) prior to starting their design works. Per the City’s Watercourse Protection Bylaw No. 3152, the developer’s consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Confirmation of Commitment by Qualified Environmental Professional - QEP) prior to starting their site monitoring works. These requirements have been issued to reflect the application for development for a proposed 136 Unit Apartment Development located at 20619-29 Eastleigh Cres. These requirements may be subject to change upon receipt of a development application. --- page 17 --- To: Advisory Design Panel Date: March 22, 2024 Subject: Development Permit Application DP 13-23 & Rezoning Application RZ 11-23 Page 8 The City’s Zoning Bylaw, 1996, #2100 has requirements concerning landscaping for buffer zonings, parking and loading areas, and garbage and recycling containers, all of which applies to this design. A) The developer is responsible for the following work which shall be designed by a Professional Engineer: I. A Qualified Environmental Professional (QEP) must be engaged to implement erosion and sediment control in accordance with the City of Langley Watercourse Protection Bylaw #3152, as amended. II. A storm water management plan for the site is required. Rainwater management measures used on site shall limit the release rate to pre- development levels to mitigate flooding and environmental impacts as detailed in the City’s DCM. All calculations shall be based the City’ DCM with 20% added to the calculated results to account for climate change. A safety factor of 20% shall be added to the calculated storage volume. Pre- development release rates shall not include climate change effect. III. All existing services shall be capped at the main by the City, at the Developer’s expense prior to applying for a demolition permit. IV. New water, sanitary and storm sewer service connections are required. All pertinent pipe design calculations shall be submitted in spreadsheet format and shall include all formulas for review by the City. The Developer’s engineer will determine the appropriate main tie-in locations and size the connections for the necessary capacity. V. At the Developer’s expense, the capacity of the existing water and sanitary sewer mains shall be assessed through hydraulic modeling a. Any upgrade requirement for either sanitary or water mains not covered under the City’s DCC bylaw shall be designed and installed by the Developer at the Developer’s expense. b. At the Developer’s expense, the City’s standing hydraulic modeling consultant shall conduct a fire hydrant flow test to be used in the City’s water modeling to determine if the existing water network is adequate for fire flows (based on architectural data supplied by the Developer’s Architect). Upgrading of the existing watermain(s) may be necessary to achieve the necessary pressure and flows to conform to Fire Underwriters Survey (FUS) “Water Supply for a Public Fire Protection, a Guide to Recommended Practice, 1995.” VI. Additional C71P fire hydrants may be required to meet bylaw and firefighting requirements. Hydrant locations must be per DCM Section 3.10 and approved by the City Engineer and the City of Langley Fire Rescue Service. VII. A corner truncation of 4m will be required at the corner of Eastleigh Cres. and the lane n/w of the proposed project. VIII. At the Developer's expense, a Traffic Impact Assessment (TIA) will be completed per DCM Section 8.21. The proposed development plan and --- page 18 --- To: Advisory Design Panel Date: March 22, 2024 Subject: Development Permit Application DP 13-23 & Rezoning Application RZ 11-23 Page 9 statistics, once ready, should be forwarded to the City Engineer to develop the scope of this traffic study. TIA reports must be approved by the City Engineer prior to taking the application to Council. The TIA completion timing must be: a. For OCP Amendment / Rezoning Applications: Prior to Council’s first and second readings; and b. For Development Permits (DP): Prior to Council consideration of the application. IX. The scope and extent of the off-site works shall be determined in part from the TIA. New sidewalk, barrier curb, gutter will be required along the entire Eastleigh Cres. frontage, complete with boulevard trees and a planting strip as per DCM cross-section SS-R07 and Section 11.0. X. The condition of the existing pavement along all the proposed project’s frontages shall be assessed by a geotechnical engineer. Pavements shall be adequate for an expected road life of 20 years under the expected traffic conditions for the class of road. Road construction and asphalt overlay designs shall be based on the analysis of the results of Benkelman Beam tests and test holes carried out on the existing road which is to be upgraded. If the pavement is inadequate, it shall be remediated by the Developer, at the Developer’s expense. XI. The site layout shall be reviewed by a qualified Professional Engineer to ensure that the parking layout, vehicle circulation, turning paths and access design meet applicable standards and sightline requirements, including setbacks from property lines. Appropriate turning templates should be used to prove parking stalls, loading areas and drive aisles are accessible by service vehicles. Refer to DCM Section 8.0. The design shall be adequate for MSU trucks as the design vehicle. XII. Existing street lighting along the entire project frontage shall be analyzed (excluding any BC Hydro lease lights) by a qualified electrical consultant to ensure street lighting and lighting levels meet the criteria outlined in DCM 9.0. Any required street lighting upgrades, relocation, and/or replacement shall be done by the Developer at the Developer’s expense. Any existing BC Hydro lease-lights to be removed and disposed of off-site. XIII. Eliminate the existing overhead BC Hydro/telecommunication infrastructure along the development’s Eastleigh Cres. project frontage by replacing with underground infrastructure. XIV. A dedicated on-site loading zone shall be provided by the developer. The design shall be adequate for MSU trucks as the design vehicle. B) The Developer is required to deposit the following bonding and fees: I. The City will require a Security Deposit based on the estimated construction costs of installing civil works, as approved by the City Engineer. --- page 19 --- To: Advisory Design Panel Date: March 22, 2024 Subject: Development Permit Application DP 13-23 & Rezoning Application RZ 11-23 Page 10 II. The City will require inspection and administration fees in accordance to the Subdivision Bylaw based on a percentage of the estimated construction costs, as per the City’s Subdivision and Development Servicing Bylaw 2021 #3126. III. A deposit for a storm, sanitary and water services is required, which will be determined by City staff after detailed civil engineering drawings are submitted, sealed by a Professional Engineer. IV. The City will require a $40,000 bond for the installation of a water meter to current City standards as per the DCM. V. A signed and sealed pavement cut form (Form F-2 of the City’s DCM) shall be completed by the developer’s consulting engineer. Upon the review and approval of the City Engineer of the submitted form, the corresponding Permanent pavement cut reinstatement and degradation fees shall be paid by the Developer. NOTE: Deposits for utility services or connections are estimates only. The actual cost incurred for the work will be charged. The City will provide the developer with an estimate of connections costs, and the Developer will declare in writing that the estimate is acceptable. C) The Developer is required to adhere to the following conditions: I. The Developer’s Consulting Engineer shall perform their periodic Field Reviews, As required by EGBC, and send a copy of the Review to the City Engineer within a week of completion of each Review II. Unless otherwise specified by the City Engineer, all engineering works shall be designed based on the City’s DCM specifications in accordance with the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 III. Undergrounding of hydro, telecommunication to the development site is required, complete with underground or at-grade transformer. IV. Transformers servicing developments are to be located on private property with maintenance access located on private property. All transformers to be wrapped upon installation by the Developer. V. All survey costs and registration of documents with the Land Titles Office are the responsibility of the developer/owner. Please refer to the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 for more details. VI. A water meter is required to be installed on private property, preferably in the mechanical room, in accordance to the City's DCM standards at the Developer's cost. VII. An approved backflow prevention assembly must be installed on the domestic water connection immediately upon entering the building to provide premise isolation. --- page 20 --- To: Advisory Design Panel Date: March 22, 2024 Subject: Development Permit Application DP 13-23 & Rezoning Application RZ 11-23 Page 11 VIII. A Stormceptor or equivalent oil separator is required to treat site surface drainage. IX. A complete set of record drawings (as-built) of off-site works, service record cards and a completed tangible capital asset form (TCA) all sealed by a Professional Engineer shall be submitted to the City within 60 days of the substantial completion date. Digital drawing files in .pdf and .dwg formats shall also be submitted. All the drawing submissions shall: a. Use City’s General Note Sheet and Title Block; and b. Closely follow the format and sequence outlined in the City’s DCM that will be provided to the Developer’s Consulting Engineer. X. The selection, location and spacing of street trees and landscaping are subject to the approval of the City Engineer. Please refer to the City’s DCM for more details. XI. Stormwater run-off generated on the site shall not impact adjacent properties, or roadways. XII. Garbage and recycling enclosures shall accommodate on the site and be designed to meet Metro Vancouver’s “Technical Specifications for Recycling and Garbage Amenities in Multi-family and Commercial Developments - June 2015 Update.” Please refer to the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 for more details. Fire Department Comments: Fire department access for the whole project was reviewed to ensure adequate access was in place for apparatus and firefighters. A construction fire safety plan shall be completed, complete with crane inspection records. A progressive standpipe installation will be required as construction rises. Standpipes will be required on exterior of both rooftop stairways. Standpipes will be required at the parkade entrance, and in both elevator lobby refuge areas. All garbage/recycling containers must be stored in a fire rated, sprinklered room, and must be of adequate size to prevent spillover into adjacent area. Stairwells must be constructed to accommodate shelter in place applications. Marked Exits must not be on a fob. A radio amplification bylaw is currently in development and will need to he adhered to. Consideration will be given to the installation of power banks in the storage room lockers for e-bikes charging. A Fire Safety plan and FD lock box (knox box) will be required before occupancy. The 4” FDC will be located on a pedestal at the front of the building, exact location to be discussed with the Fire Department at a later date. --- page 21 --- To: Advisory Design Panel Date: March 22, 2024 Subject: Development Permit Application DP 13-23 & Rezoning Application RZ 11-23 Page 12 Advisory Design Panel: In accordance with Development Application Procedures Bylaw No. 2488, the subject Zoning Bylaw amendment and Development Permit application will be reviewed by the Advisory Design Panel (ADP) at the April 3, 2024 meeting. According to the Council-approved ADP Terms of Reference, the ADP is to provide form and character and urban design-related advice and recommendations for Council’s consideration. ADP recommendations will be presented to Council through the ADP meeting minutes and, if applicable, through an additional City staff report, prior to Council consideration of the proposed Zoning Bylaw amendment and Development Permit Applications. A copy of the ADP minutes will be presented to Langley City Council at a future Regular Council meeting. BUDGET IMPLICATIONS: In accordance with Bylaw No. 2482, the proposed development would contribute $1,186,832.00 to City Development Cost Charge accounts and $528,000.00 in Community Amenity Contributions. Prepared by: _______________________ Anton Metalnikov, RPP, MCIP Planner Concurrence: __________________________ Roy M. Beddow, RPP, MCIP Deputy Director of Development Services --- page 22 --- To: Advisory Design Panel Date: March 22, 2024 Subject: Development Permit Application DP 13-23 & Rezoning Application RZ 11-23 Page 13 Concurrence: _______________________ Carl Johannsen, RPP, MCIP Director of Development Services Concurrence: Concurrence: per Fire Chief Kennedy __________________________ __________________________ David Pollock, P.Eng. Bob Perry Director of Engineering, Parks, Captain of Fire Prevention & Environment Attachments --- page 23 --- To: Advisory Design Panel Date: March 22, 2024 Subject: Development Permit Application DP 13-23 & Rezoning Application RZ 11-23 Page 14 DEVELOPMENT PERMIT APPLICATION DP 13-23 REZONING APPLICATION RZ 11-23 Civic Addresses: 20719-20731 Eastleigh Crescent Legal Description: Strata Lots 1 & 2, District Lot 37, Group 2, New Westminster District, Strata Plan NW2601; Strata Lots 1 & 2, District Lot 37, Group 2, New Westminster District, Strata Plan NW2602 Applicant: Whitetail Homes Ltd. Owners: 1098010 BC Ltd.; Aime Groleau & Claudette Clouatre --- page 24 --- --- page 25 --- --- page 26 --- --- page 27 --- --- page 28 --- --- page 29 --- --- page 30 --- --- page 31 --- --- page 32 --- --- page 33 --- --- page 34 --- --- page 35 --- --- page 36 --- --- page 37 --- --- page 38 --- --- page 39 --- --- page 40 --- --- page 41 --- --- page 42 --- --- page 43 --- --- page 44 --- --- page 45 --- --- page 46 --- --- page 47 --- --- page 48 --- --- page 49 --- --- page 50 --- --- page 51 --- --- page 52 --- --- page 53 --- --- page 54 --- --- page 55 --- --- page 56 --- --- page 57 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject: Development Permit Application DP 10 - 23 Rezoning Application RZ 09-23 (5030-5064 208 Street & 20845 50A Avenue) File #: 6620.00 From: Anton Metalnikov, RPP, MCIP Planner Bylaw #: 32 71 Doc #: Date: March 2 1 , 2024 RECOMMENDATION: THAT this report be received for information. PURPOSE OF REPORT: To consider Development Permit and Zoning Bylaw amendment applications by Rajinder Warraich for a 26-unit townhome development at 5030-5064 208 Street & 20845 50A Avenue. POLICY: The subject properties are currently zoned RS1 Single Family Residential in Zoning Bylaw No. 2100 and designated “Ground Oriented Residential” in the Official Community Plan Land Use map. All lands designated for multi-unit residential use are subject to a Development Permit (DP) to address building form and character. --- page 58 --- To: Advisory Design Panel Date: March 21, 2024 Subject: Development Permit Application DP 10-23 & Rezoning Application RZ 09-23 Page 2 COMMENTS/ANALYSIS: Background Information: Applicant: Rajinder Warraich Owner s : Florence Burton, James Okeymow, John Hyzka, Ellen Young, & Richard & Terry Seymour Civic Address es : 5030-5064 208 Street & 20845 50A Avenue Legal Description: Lots 242 & 243, District Lot 312, Group 2, New Westminster District, Plan 57547; Lots 1 (Except: Parcel L [Bylaw Plan 68226]), 2 (Except: Parcel K [Bylaw Plan 68226]), & 3 (Except: Parcel J [Bylaw Plan 68226]), District Lot 312, Group 2, New Westminster District, Plan 10032 Site Area: 3,603 m 2 (0.89 acres) Number of Units: 26 townhomes Gross Floor Area: 3,795 m 2 (40,853 ft 2 ) Floor Area Ratio: 1.053 Lot Coverage: 45% Total Parking Required: 57 spaces (including 1 h/c space) Parking Provided: Resident Visitor Total 52 spaces 5 spaces 57 spaces (including 1 h/c space) OCP Designation: Ground Oriented Residential Existing Zoning: RS1 Single Family Residential Proposed Zoning: CD93 Comprehensive Development Zone Development Cost Charges: $579,921.00 (City - $285,033.00, GVS&DD - $108,870.00, GVWD - $114,636.00, SD35 - $18,400.00, TransLink - $52,982.00) Community Amenity Contributions (CACs): $104,000.00 --- page 59 --- To: Advisory Design Panel Date: March 21, 2024 Subject: Development Permit Application DP 10-23 & Rezoning Application RZ 09-23 Page 3 Discussion: 1. Context The applicant is proposing to develop a 26-unit townhome complex on the site of 5-single-detached lots. This site is located in an area of single-detached homes where the properties generally along 208 Street, including the subject site, have been designated as Ground Oriented Residential in the City’s Official Community Plan (OCP). This designation allows for townhome and plex-home development of up to 3 storeys in height and a Floor Area Ratio (FAR) density of 1.2, and is further guided by the City’s Townhome & Plex-Home Best Practices Guide. The Ground Oriented Residential designation was introduced through the OCP to provide a broader range of family-oriented housing options in the neighbourhood and near Blacklock Elementary School, support future frequent transit service, provide an upgraded streetscape along 208 Street, and improve traffic safety by removing driveways from 208 Street. The subject site is located on the northeast corner of 208 Street and 50A Avenue and extends approximately midway toward 51 Avenue to the north. 208 Street and 50A Avenue front the site on the west and south respectively. The properties across from these streets, along with those adjacent to the north, share the same Ground Oriented Residential OCP designation. To the east, the site is neighboured along 50A Avenue by a row of single-detached homes designated Suburban in the OCP, which maintains these properties’ existing single-detached home densities and lot patterns. However, most of the site’s rear property lines are shared with Nicholas Park. Site context Subject Site Nicholas Park Triplex application --- page 60 --- To: Advisory Design Panel Date: March 21, 2024 Subject: Development Permit Application DP 10-23 & Rezoning Application RZ 09-23 Page 4 The site is located in a distinctly residential area but has convenient walking connections to key amenities including: • Nicholas Park (directly adjacent); • 560 bus line (few-minutes’ walk); and • Blacklock Fine Arts Elementary School (10-minutes walk). 2. Proposed Rezoning and the Official Community Plan (OCP) The site is designated Ground Oriented Residential in the City’s OCP, which allows for townhome and plex-home development of up to 3 storeys in height and a Floor Area Ratio (FAR) density of up to 1.2. The subject properties are proposed to be rezoned to a site-specific Comprehensive Development (CD) Zone as no existing zones adequately accommodate the Ground Oriented Residential designation. A new Zoning Bylaw is currently in development and the project was designed to conform to the preliminary draft zoning regulations associated with this designation. Should the CD rezoning be adopted it is anticipated that, as part of adopting the new Zoning Bylaw, the City will rezone this site from its CD Zone to the new zone created to implement the Ground Oriented Residential designation. The application is generally consistent with the City’s Townhome & Plex-Home Best Practices Guide, including by incorporating the following guidelines: • No balconies facing neighbouring Suburban properties; • Using peaked roofs; • Upgrading the street frontage; • Incorporating a vehicle turnaround pad which can be converted to an extra visitor parking space in the future; • Providing new, durable (non-wood) fencing for shared property lines; • Including a new public walkway from 50A Avenue to Nicholas Park; • Planting more than one new tree per unit; • Setting 3-storey townhomes back over 8 metres from adjacent Suburban properties and stepping down to a 2-storey height where closer; and • Providing an outdoor amenity area. 3. Design The applicant is proposing a 7-block townhome complex primarily oriented around a central lane running parallel to 208 Street. A short lane stub comes off the primary lane to provide access to the southeast corner. This configuration maximizes the number of townhomes engaging with the fronting streets, as well as the park. The site’s shallow dimensions result in shallower blocks and all units having side-by-side double garages. The central lane runs to the northern edge of the site to enable its extension as part of future development of the --- page 61 --- To: Advisory Design Panel Date: March 21, 2024 Subject: Development Permit Application DP 10-23 & Rezoning Application RZ 09-23 Page 5 neighbouring properties and provide a through-connection between 50A and 51 Avenues. In the interim, this dead-end will be managed through a turnaround pad, which will ultimately be replaced with an additional visitor parking space when the lane is extended northward into a future development. The site’s east interface makes use of the separation requirements in the Townhome & Plex- Home Best Practices Guide to site the PMT, an outdoor amenity area, visitor parking, and a new walkway to the park. This walkway will be accessible to the public, and will improve walkability to Nicholas Park from 50A Avenue and homes to the south. The park currently has a single access on its east side (209 St.). The proposed design emphasizes off-white tones, with visual interest provided primarily through texture. Maroon doors and brick bases highlight the townhome entrances on the street frontages while horizontal cement fibre board plank siding serve as the primary façade treatment. On the upper floors, fibre cement board and batten highlights extruded masses. Window awnings, balcony posts, and picket railings decorate the façades. The townhome blocks are proposed at a three-storey height, with a varied peaked roof line. On the site’s southeast corner, the end unit of Block 7 steps down to a 2-storey height to transition to the neighbouring single-detached home as required by the Best Practices Guide. Block 6, which is adjacent to the neighbouring Suburban property’s backyard, is set back 8.6 metres (above the Best Practices Guide requirement) to emphasize privacy and shadow prevention at this interface. The project’s landscaping uses a variety of shrubs, grasses, and perennials to soften the site’s corners and edges and separate the individual units’ outdoor areas. Several different tree species are also provided in these landscaped areas to provide a total of 28 new trees on-site. Staff is also currently working with the applicant to determine if the off-site frontage design can accommodate the retention of four large City-owned trees along 208 Street. All proposed fencing is metal, including taller fencing on the boundaries shared with adjacent properties for privacy and shorter fencing along the 208 Street and park interfaces to better engage with these public spaces. For the street-fronting units, pedestrian access is provided through walkout connections to the public sidewalk while, for the park-side units, pedestrian access is provided from within the internal lane. Vehicle parking meets Zoning Bylaw requirements, including 2.0 resident spaces per unit (total of 52 spaces) and 0.2 visitor spaces per unit (total of 5 spaces). Additionally, a vehicle turnaround pad has been provided on the northwest corner of the site, which will allow drivers to turn around at the dead end in the interim and can be converted to an additional visitor parking space once the lane is extended through future development. All garages are provided in a side-by-side configuration. The development consists of 1 two-bedroom unit, 23 three-bedroom units, and 2 five- bedroom units, and all units have ground-level patios and balconies. --- page 62 --- To: Advisory Design Panel Date: March 21, 2024 Subject: Development Permit Application DP 10-23 & Rezoning Application RZ 09-23 Page 6 4. Sustainability The proposal incorporates the following sustainable development features: • Using lighting systems meeting ground-level and dark skies light pollution reduction principles; • Incorporating climate-resilient and drought-tolerant plantings served by a smart-controlled drip irrigation system; and • Providing five garages with Level II electric vehicle (EV) chargers. 5. CPTED The applicant’s proposal benefited from a comprehensive Crime Prevention Through Environmental Design (CPTED) review by a qualified consultant whose recommendations were incorporated into the plans. 6. Summary The proposed development is consistent with the City’s OCP, Development Permit Area guidelines, and Townhome & Plex-Home Best Practices Guide and provides family-oriented homes near transit, parks, and an elementary school. Engineering Requirements: PRELIMINARY ONLY Additional design changes may be required upon further investigation, site inspections and receipt of other supporting reports and documents. All work to be done to the City of Langley’s Design Criteria Manual (DCM), and the City’s Subdivision and Development Servicing Bylaw (SDSB). Per the City’s DCM requirement, the developer and their consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Commitment by Owner and Consulting Engineer) prior to starting their design works. Per the City’s Watercourse Protection Bylaw No. 3152, the developer’s consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Confirmation of Commitment by Qualified Environmental Professional - QEP) prior to starting their site monitoring works. These requirements have been issued to reflect the application for development for a proposed 26-Unit Townhome Development located at 5030-5064 208 St; 20845 50A. --- page 63 --- To: Advisory Design Panel Date: March 21, 2024 Subject: Development Permit Application DP 10-23 & Rezoning Application RZ 09-23 Page 7 These requirements may be subject to change upon receipt of a development application . The City’s Zoning Bylaw, 1996, #2100 has requirements concerning landscaping for buffer zonings, parking and loading areas, and garbage and recycling containers, all of which applies to this design. A) The Developer is responsible for the following work which shall be designed by a Professional Engineer: I. A Qualified Environmental Professional (QEP) must be engaged to implement erosion and sediment control in accordance with the City of Langley Watercourse Protection Bylaw #3152, as amended. II. A storm water management plan for the site is required. Rainwater management measures used on site shall limit the release rate to pre- development levels to mitigate flooding and environmental impacts as detailed in the City’s DCM. All calculations shall be based the City’ DCM with 20% added to the calculated results to account for climate change. A safety factor of 20% shall be added to the calculated storage volume. Pre- development release rates shall not include climate change effect. III. All existing services shall be capped at the main by the City, at the Developer’s expense prior to applying for a demolition permit. IV. New water, sanitary and storm sewer service connections are required. All pertinent pipe design calculations shall be submitted in spreadsheet format and shall include all formulas for review by the City. The Developer’s engineer will determine the appropriate main tie-in locations and size the connections for the necessary capacity. V. At the Developer’s expense, the capacity of the existing water and sanitary sewer mains shall be assessed through hydraulic modeling performed by the City’s standing hydraulic modeling consultant per DCM 3.8 and 6.5. I. Any upgrade requirement for either sanitary or water mains not covered under the City’s DCC bylaw shall be designed and installed by the Developer at the Developer’s expense. II. At the Developer’s expense, the City’s standing hydraulic modeling consultant shall conduct a fire hydrant flow test to be used in the City’s water modeling to determine if the existing water network is adequate for fire flows (based on architectural data supplied by the Developer’s Architect). Upgrading of the existing watermain(s) may be necessary to achieve the necessary pressure and flows to conform to Fire Underwriters Survey (FUS) “Water Supply for a Public Fire Protection, a Guide to Recommended Practice, 1995.” VI. Additional C71P fire hydrants may be required to meet bylaw and firefighting requirements. Hydrant locations must be per DCM Section --- page 64 --- To: Advisory Design Panel Date: March 21, 2024 Subject: Development Permit Application DP 10-23 & Rezoning Application RZ 09-23 Page 8 3.10 and approved by the City Engineer and the City of Langley Fire Rescue Service. VII. A 4m corner truncation will be required at the south-west property corner. VIII. At the Developer's expense, a Traffic Impact Assessment (TIA) will be completed per the DCM Section 8.21. The proposed development plan and statistics, once ready, should be forwarded to the City Engineer to develop the scope of this traffic study. TIA reports must be approved by the City Engineer prior to taking the application to Council. The TIA completion timing must be: a. For OCP Amendment / Rezoning Applications: Prior to Council’s first and second readings; and b. For Development Permits (DP): Prior to Council consideration of the application. IX. The scope and extent of the off-site works be determined in part from the TIA. New sidewalk, barrier curb, gutter will be required along the entire 208 St. and 50A Ave. frontages, complete with boulevard trees and a planting strip as per the City DCM cross-section SS-R01 and SS-R07 respectively, as well as Section 11.0 - Specifications and Standards for Landscaping. The new curb alignment fronting the proposed project on 208 St. shall be in the approximate existing FOG line location (1.5m +/-). Any sidewalk transitions to be made with back-to-back long radius curves. X. Vehicles egressing from 50A Ave. onto 208 St. shall be limited to right-out movement only by means of extending the existing median on 208 St. XI. The condition of the existing pavement along the proposed project’s frontages shall be assessed by a geotechnical engineer. Pavements shall be adequate for an expected road life of 20 years under the expected traffic conditions for the class of road. Road construction and asphalt overlay designs shall be based on the analysis of the results of Benkelman Beam tests and test holes carried out on the existing road which is to be upgraded. If the pavement is inadequate, it shall be remediated by the Developer, at the Developer’s expense. XII. The site layout shall be reviewed by a qualified Professional Engineer to ensure that the parking layout, vehicle circulation, turning paths and access design meet applicable standards and sightline requirements, including setbacks from property lines. Appropriate turning templates should be used to prove parking stalls, loading areas and drive aisles are accessible by service vehicles. Refer to DCM Section 8. The design shall be adequate for MSU trucks as the design vehicle. XIII. Existing street lighting along the entire project frontage shall be analyzed (excluding any BC Hydro lease lights) by a qualified electrical consultant to ensure street lighting and lighting levels meet the criteria outlined in DCM 9.0. Any required street lighting upgrades, relocation, and/or replacement shall be done by the Developer at the Developer’s expense. --- page 65 --- To: Advisory Design Panel Date: March 21, 2024 Subject: Development Permit Application DP 10-23 & Rezoning Application RZ 09-23 Page 9 Any existing BC Hydro lease-lights to be removed and disposed of off- site. XIV. An analysis of the existing crosswalks on 208 St. both north and south of the project for upgrading requirements will be required. The developer will submit a portion of the upgrade cost based on the number of future development who will benefit from the upgrades; amount TBD. XV. Eliminate the existing overhead BC Hydro/telecommunication infrastructure along the development’s 208 St. project frontage by replacing with underground infrastructure. If third party utilities are unwilling to underground (in writing), then preducting for future undergrounding is a minimum requirement with a C-I-L contribution for future undergrounding of cable & pole removal. B) The Developer is required to deposit the following bonding and fees: I. The City will require a Security Deposit based on the estimated construction costs of installing civil works, as approved by the City Engineer. II. The City will require inspection and administration fees in accordance to the Subdivision Bylaw based on a percentage of the estimated construction costs, as per the City’s Subdivision and Development Servicing Bylaw 2021 #3126. III. A deposit for a storm, sanitary and water services is required, which will be determined by City staff after detailed civil engineering drawings are submitted, sealed by a Professional Engineer. IV. The City will require a $40,000 bond for the installation of a water meter to current City standards as per the DCM. V. A signed and sealed pavement cut form (Form F-2 of the City’s DCM) shall be completed by the developer’s consulting engineer. Upon the review and approval of the City Engineer of the submitted form, the corresponding Permanent pavement cut reinstatement and degradation fees shall be paid by the Developer. NOTE: Deposits for utility services or connections are estimates only. The actual cost incurred for the work will be charged. The City will provide the developer with an estimate of connections costs, and the Developer will declare in writing that the estimate is acceptable. C) The Developer is required to adhere to the following conditions: I. The Developer’s Consulting Engineer shall perform their periodic Field Reviews, As required by EGBC, and send a copy of the Review to the City Engineer within a week of completion of each Review --- page 66 --- To: Advisory Design Panel Date: March 21, 2024 Subject: Development Permit Application DP 10-23 & Rezoning Application RZ 09-23 Page 10 II. Unless otherwise specified by the City Engineer, all engineering works shall be designed based on the City’s DCM specifications in accordance with the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 III. Undergrounding of hydro, telecommunication to the development site is required, complete with underground or at-grade transformer IV. Transformers servicing developments are to be located on private property with maintenance access located on private property. All transformers to be wrapped upon installation by the Developer. V. All survey costs and registration of documents with the Land Titles Office are the responsibility of the developer/owner. Please refer to the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 for more details. VI. A water meter is required to be installed on private property, preferably in the mechanical room, in accordance to the City's DCM standards at the Developer's cost. VII. An approved backflow prevention assembly must be installed on the domestic water connection immediately upon entering the building to provide premise isolation. VIII. A Stormceptor or equivalent oil separator is required to treat site surface drainage. IX. A complete set of record drawings (as-built) of off-site works, service record cards and a completed tangible capital asset form (TCA) all sealed by a Professional Engineer shall be submitted to the City within 60 days of the substantial completion date. Digital drawing files in .pdf and .dwg formats shall also be submitted. All the drawing submissions shall: a. Use City’s General Note Sheet and Title Block; and b. Closely follow the format and sequence outlined in the City’s DCM that will be provided to the Developer’s Consulting Engineer. X. The selection, location and spacing of street trees and landscaping are subject to the approval of the City Engineer. Please refer to the City’s DCM for more details. XI. Stormwater run-off generated on the site shall not impact adjacent properties, or roadways. XII. Garbage and recycling enclosures shall accommodate on the site and be designed to meet Metro Vancouver’s “Technical Specifications for Recycling and Garbage Amenities in Multi-family and Commercial Developments - June 2015 Update.” Please refer to the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 for more details. Fire Department Comments: Fire department access for the whole project was reviewed to ensure adequate access was in place. An 8-metre laneway will need to be provided for access on --- page 67 --- To: Advisory Design Panel Date: March 21, 2024 Subject: Development Permit Application DP 10-23 & Rezoning Application RZ 09-23 Page 11 the west side of the property. A construction fire safety plan shall be completed. A lockbox will need to be provided, location to be determined at a later date. Advisory Design Panel: In accordance with Development Application Procedures Bylaw No. 2488, the subject Zoning Bylaw amendment and Development Permit application will be reviewed by the Advisory Design Panel (ADP) at the April 3, 2024 meeting. According to the Council-approved ADP Terms of Reference, the ADP is to provide form and character and urban design-related advice and recommendations for Council’s consideration. ADP recommendations will be presented to Council through the ADP meeting minutes and, if applicable, through an additional City staff report, prior to Council consideration of the proposed Zoning Bylaw amendment and Development Permit Applications. A copy of the ADP minutes will be presented to Langley City Council at a future Regular Council meeting. BUDGET IMPLICATIONS: In accordance with Bylaw No. 2482, the proposed development would contribute $285,033.00 to City Development Cost Charge accounts and $104,000.00 in Community Amenity Contributions. Prepared by: _______________________ Anton Metalnikov, RPP, MCIP Planner Concurrence: __________________________ Roy M. Beddow, RPP, MCIP Deputy Director of Development Services --- page 68 --- To: Advisory Design Panel Date: March 21, 2024 Subject: Development Permit Application DP 10-23 & Rezoning Application RZ 09-23 Page 12 Concurrence: _______________________ Carl Johannsen, RPP, MCIP Director of Development Services Concurrence: Concurrence: __________________________ __________________________ David Pollock, P.Eng. Scott Kennedy Director of Engineering, Parks, Fire Chief & Environment Attachments --- page 69 --- To: Advisory Design Panel Date: March 21, 2024 Subject: Development Permit Application DP 10-23 & Rezoning Application RZ 09-23 Page 13 DEVELOPMENT PERMIT APPLICATION DP 10-23 REZONING APPLICATION RZ 09-23 Civic Addresses: 5030-5064 208 Street & 20845 50A Avenue Legal Description: Lots 242 & 243, District Lot 312, Group 2, New Westminster District, Plan 57547; Lots 1 (Except: Parcel L [Bylaw Plan 68226]), 2 (Except: Parcel K [Bylaw Plan 68226]), & 3 (Except: Parcel J [Bylaw Plan 68226]), District Lot 312, Group 2, New Westminster District, Plan 10032 Applicant: Rajinder Warraich Owner: Florence Burton, James Okeymow, John Hyzka, Ellen Young, & Richard & Terry Seymour --- page 70 --- --- page 71 --- --- page 72 --- --- page 73 --- --- page 74 --- --- page 75 --- --- page 76 --- --- page 77 --- --- page 78 --- --- page 79 --- --- page 80 --- --- page 81 --- --- page 82 --- --- page 83 --- --- page 84 --- --- page 85 --- --- page 86 --- --- page 87 --- --- page 88 --- --- page 89 --- --- page 90 --- --- page 91 --- --- page 92 --- --- page 93 --- --- page 94 --- --- page 95 --- --- page 96 --- --- page 97 --- --- page 98 --- --- page 99 --- --- page 100 --- --- page 101 --- --- page 102 --- --- page 103 --- --- page 104 --- --- page 105 --- --- page 106 --- --- page 107 --- --- page 108 --- --- page 109 --- --- page 110 --- --- page 111 ---