Agenda - Advisory Design Panel Source: https://www.langleycity.ca/media/file/adp-agenda-july-18-2024 Archived copy: https://heylangley.ca/records/city-of-langley/committees/advisory-design-panel/2024/2024-07-18-agenda-adp-agenda-july-18-2024.pdf SHA-256 of the PDF: 7e2cdda9f368f819f4365f1e5645efdbdb66119966138044647d989a31fe3a93 Fetched: 2026-11-10 --- page 1 --- ADVISORY DESIGN PANEL THURSDAY, JULY 18, 2024 AT 7:00 PM Council Chambers Langley City Hall (In-Person Meeting) A G E N D A 1) AGENDA Adoption of the July 18, 2024 agenda. 2) MINUTES Adoption of minutes from the June 27, 2024 meeting. 3) ZONING BYLAW AMENDMENT APPLICATION RZ 13-23 Multi-phase apartment & commercial mixed-use master plan at 5501 204 Street & 20300 Douglas Crescent. 4) DEVELOPMENT PERMIT APPLICATION DP 14-23 ZONING BYLAW AMENDMENT APPLICATION RZ 12-23 6-storey, 64-unit apartment building at 20220-20230 Michaud Crescent. 5) NEXT MEETING September 11, 2024. 6) ADJOURNMENT --- page 2 --- Document Number: 195930 MINUTES OF THE ADVISORY DESIGN PANEL HELD IN COUNCIL CHAMBERS, LANGLEY CITY HALL THURSDAY , JUNE 27 , 2024 AT 7:0 3 PM Present: Councillor Paul Albrecht (Chair) Councillor Mike Solyom (Co - Chair) Mayor Nathan Pachal Blair Arbuthnot Jaswinder Gabri Tony Osborn Ritti Suvilai Absent: Cst. Dennis Bell Matt Hassett Leslie Koole Dammy Ogunseitan Ella van Enter Staff: C. Johannsen, Director of Development Services K. Kenney, Corporate Officer A. Metalnikov, Planner Chair Albrecht began by acknowledging that the land on which we gather is on the traditional unceded territory of the Katzie, Kwantlen, Matsqui and Semiahmoo First Nations. Due to ex cept ional circumstances, i n order to permit the meeting to proceed without quorum, It was MOVED and SECONDED THAT the rule under Section 33(4) of the Council Procedure Bylaw regarding quorum requirements for committees be suspended for this meeting. CARRIED With required 2/3rds vote --- page 3 --- ADP Minutes – June 27 , 2024 2 1) AGENDA Adoption of the June 27 , 2024 agenda. It was MOVED and SECONDED THAT the agenda for the June 27 , 2024 Advisory Design Panel be approved. CARRIED 2) MINUTES Adoption of minutes from the May 29 , 2024 meeting. It was MOVED and SECONDED THAT the minutes of the May 29 , 2024 Advisory Design Panel meeting be approved as circulated. CARRIED 3) ZONING BYLAW AMENDMENT APPLICATION RZ 06 - 23 Multi - phase apartment & commercial mixed - use master plan at 20501 Logan Avenue. Carl Johannsen, Director of Development Services introduced the project. Anton Metalnikov, Planner, spoke to the staff report dated June 12 , 2024 and provided a brief overview of the Zoning Bylaw amendment application. Mr. Johannsen spoke further regarding flood construction level requirements in the area which may impact this development. Staff responded to questions from Panel members regarding the following: • Clarification of Panel’s role at this early stage of the application process with only renderings of massing, public spaces and green spaces to review; • Innovation Boulevard development in relation to this application; • Traffic safety considerations with regard to proposed Eastleigh Crescent extension through the site ; • On and off - street parking considerations; • Vehicle and pedestrian access points into the site; • Potential cycling facilities for interior streets; • Mixed Employment and Transit - Oriented Corridor land use designations; --- page 4 --- ADP Minutes – June 27 , 2024 3 The Applicant team entered the meeting: Steven Bartok, Principal, Keystone Architecture & Planning Ltd. Elena Topisirovic, Project Manager, Keystone Architecture & Planning Ltd. Jeff Ardron, Developer, Argus Holdings Ltd. Mark Ardron, Developer, Argus Holdings Ltd. Ryan van Baal, Owner, Ventures on the Ridge Ltd. Peter Fassbender, President, Fassbender Consulting Ltd. Kevin Leyenhorst, Director of Preconstruction, Caliber Projects On behalf of the applicant, Peter Fassbender provided opening remarks with respect to this multi - phased project which is intended to be a legacy development for the property owners that will be kept in the ir family trust; Mr . Bartok and Ms. Topisirovic presented the application, providing a high level overview of the vision for the development , providing information on the following : • Background on the property ; • High level sketch ; • Site C ontext ; • Proximity to SkyTrain S tation ; • Aerial view of concept massing ; • Intent to bring Eastleigh through the site ; • 5 big themes ; • Underground parking massing ; • Public green space massing ; • Commercial storefront massing ; • Massing diagrams of each storey; • Project D ata ; • Master Plan ; • Site Sections ; • Street Section through Eastleigh extension ; • Street Section through Glover Road ; • Exterior Concept ; • Site Plan ; • Landscape precedents ; • Plaza concepts ; • Promenade concept ; • Eastleigh extension concept ; • Hidden p arking concept ; • Ground oriented concept ; • Courtyard concept ; • Glover Road concept ; and • Logan Ave nue concept . --- page 5 --- ADP Minutes – June 27 , 2024 4 Mr. Fassbender provided closing remarks with respect to the first phase of construction and future phasing of the construction, subject to market conditions . Panel members provided feedback on the form and character of the development and discussion took place regarding the following: • Potential for incorporating historic elements , public art into the development to create a unique sense of place; • Concerns with the grade differences throughout the development creating a lack of cohesiveness, hierarchy and sense of place ; • Encouraging tech companies to locate on Innovation Boulevard by identifying tech innovation space on Glover Road in plans; • Importance of creating interesting and inviting view s into the development , especially from the corner of Glover Road and Logan Avenue; and • In terms of accessibility, p otential for less parking, more bike storage throughout the development. The applicant team responded to questions from panel members regarding the following: • Types of commercial spaces envisioned for the development ; • Rationale for the massing; • Rational for courtyard location; • Floodplain elevation; • Timeline to start other phases; • Rationale for choosing 14 storeys for tallest buildings; • Whether any rooftop amenities are being planned; • Landscape considerations in terms of urban design; • Glover Road connection to site; • Location of loading zones , garbage services; • Security considerations for the site; and • Purpose of podium amenity area. The applicant team left the meeting. Staff responded to questions from Panel members and further discussion took place regarding the following: • Preference for more green space in the interior of the development ; • Having m ore gradual transition s between private, semi - private and public green spaces ; • K eeping loading and garbage services off - street from a visual perspective; • M inimizing grade differences and eliminating ramping and stairs as much as possible; --- page 6 --- ADP Minutes – June 27 , 2024 5 • Applicant needs to consider what the character of the development will be; • Interior space should be purposeful, residential or commercial; and • The view of Mount Baker is blocked due to the way the first phase is fronted; • Staff advised they would report back to Council on the Building Code height maximums of buildings incorporating wood - frame construction. Within the subject master plan as currently conceptualized, Phase 1 would use wood - frame construction, Phase 2 may use either wood - frame or concrete construction, and Ph ases 3 and 4 would be concrete. It was MOVED and SECONDED THAT: 1. The ADP receive the staff report dated June 12 , 2024 for information; and 2. The ADP recommends the applicant give further consideration to the following prior to the application proceeding to Council: a. Incorporate Langley City/property heritage in urban design to create a unique sense of place (e.g. public art, interpretative features, etc.) ; b. Minimize grade differences between sidewalks, buildings, and pedestrian open spaces (especially from the corner plaza, through the linear plaza or allee to Eastleigh Crescent and from Eastleigh Crescent to the interior plaza/pocket park), eliminate stairs/ramps as much as possible, and mitigate any unavoidable differences through design; c. Strengthen the sense of hierarchy and place in design and landscaping throughout pedestrian open space areas, including considering terminating vistas (viewing from corner pedestrian space towards a landmark final phase building) and creating greater distinction between the corner pedestrian plaza (more urban, commercial uses) and inte rior space (e.g. more natural, pocket park - setting and residential focused); d. Avoid visual impacts of parkades and service uses to sidewalks and plazas ; and e. Incorporate intentional articulation to blocks to emphasize pedestrian scale CARRIED --- page 7 --- ADP Minutes – June 27 , 2024 6 4) DEVELOPMENT PERMIT APPLICATION DP 04 - 23 ZONING BYLAW AMENDMENT APPLICATION RZ 04 - 23 4 - unit rowhouse development at 20139 53A Avenue. Carl Johannsen, Director of Development Services introduced the project. Anton Metalnikov, Planner, spoke to the staff report dated June 1 7 , 2024 and provided a brief overview of the Development Permit application. The Applicant team entered the meeting: Darren Hall, Architect, D&D Design Ltd. Clark Kavolinas, Landscape Architect, C. Kavolinas & Associates Inc. The property owners were also in attendance. Mr. Hall provided information on the following: • Development location • Proximity to transit and schools • Proposed development site layout • Unit layouts • Form and character • Landscaping • Fencing • CPTED Panel members provided feedback on the form and character of the development and discussion took place regarding the following: • Questioned how to identify units fronting lane as addressing will only be on the end of one unit fronting 53A Ave. ; and • Whether the exterior colours fit in with neighbouring developments; wo uld like to see rendering of the development with neighbouring properties . The applicant team responded to questions from panel members regarding the following: • Why no coniferous trees were included in landscape plan; • How to distinguish the unit with two front doors; and • Whether there is the ability to have suites. The applicant team left the meeting. --- page 8 --- ADP Minutes – June 27 , 2024 7 Further discussion took place regarding the following: • Potential to have a pet relief area behind the visitor parking space; and • How postal service and garbage pick - up will work as there could be potential challenges with both given the configuration of the development . It was MOVED and SECONDED THAT: 1. The ADP receive the staff report dated June 17, 2024 for information; and 2. The ADP recommends the applicant give further consideration to the following prior to the application proceeding to Council: a. Review usability of second door on south unit ; b. Incorporate wayfinding on street frontage ; c. Provide more context detail in architectural package ; and d. Consider pet relief area in space behind visitor parking space . CARRIED Staff note: Provide more information on mail delivery and waste pick - up 5) NEXT MEETING Ju ly 18 , 2024 6) ADJOURNMENT It was MOVED and SECONDED THAT the meeting adjourn at 9:09 pm. CARRIED --- page 9 --- ADP Minutes – June 27 , 2024 8 __________________________________ ADVISORY DESIGN PANEL CHAIR __________________________________ CORPORATE OFFICER --- page 10 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject: Rezoning Application RZ 13 - 2 3 ( 5501 204 St & 20300 Douglas Cres ) File #: 6620.00 From: Anton Metalnikov, RPP, MCIP Planner Bylaw #: 3290 Doc #: Date: July 2, 2024 RECOMMENDATION: THAT this report be received for information. PURPOSE OF REPORT: To consider a Zoning Bylaw amendment application by Orion Construction for a multi-phase mixed-use master plan at 5501 204 St and 20300 Douglas Cres. POLICY: The subject property is currently zoned C1 Downtown Commercial Zone in Zoning Bylaw No. 2100 and designated “Transit -Oriented Core” in the Official Community Plan Land Use map. OCP Policy 1.13. (Master Planning) requires all proposed developments on sites greater than 2 acres involving multiple phases to prepare a master plan. The subject site is 9 acres in size and is intended to be developed in phases . Accordingly, a rezoning application has been submitted to align the site’s zoning with its OCP designation and enable Development Permit applications for individual buildings to be made in the future and adopt a master plan site layout these buildings will generally conform to. Specific policies guiding the redevelopment of the Langley Mall are contained in OCP Appendix B. A Comprehensive Development (CD) Zone is proposed to implement the site- specific master plan. --- page 11 --- To: Advisory Design Panel Date: July 2, 2024 Subject: Rezoning Application RZ 13-23 Page 2 COMMENTS/ANALYSIS: Background Information: Discussion: 1. Context The applicant is proposing a multi-phase mixed-use development intended to be built out, in four phases, over 10 to 20 or more years on a large outdoor commercial centre site composed of two properties: theLangley Mall and its parking lot at 5501 204 Street and the Tim Hortons at 20300 Douglas Crescent. The site is strategically located on Douglas Crescent and between 203 Street and 204 Street, with frontages on all of these streets, and south of City Hall and Timms Community Centre. As a key ‘hinge point’ between the adjacent Historic Downtown, commercial areas on Fraser Highway and 56 Avenue and residential neighbourhoods to the west and south, the site has the potential to add significant residential density and enhanced commercial activity, and new public open spaces and amenities that will benefit both residents and businesses. This site is well-served by existing arterial road connectionsand a high concentration of shops and services, including those provided by the existing commercial centre itself. A mix of both commercial and low -rise apartment buildings sit across from the site to both the east, north, and west. To the south, the site is neighboured by the Langley Lions senior housing complex, which itself had a site-wide master plan rezoning approved in 2019 with building heights of up to 15 storeys. Applicant: Orion Construction Owner: 0622215 B.C. LTD. Civic Address es : 5501 204 Street & 20300 Douglas Crescent Legal Description: Lot 375, District Lot 36, Group 2, New Westminster District, Plan 46221; Parcel A, District Lots 305 and 36, Group 2, New Westminster District, Plan BCP35185 Number of Units Approximately 1,900 (subject to change) Site Area: 3.6 hectares (9.0 acres) Floor Area Ratio: Maximum 5.5 OCP Designation: Transit-Oriented Core Existing Zoning: C1 Downtown Commercial Proposed Zoning: CD100 Comprehensive Development Zone Development Cost Charges: To be calculated at Building Permit stage Community Amenity Contributions (CACs): To be calculated at Building Permit stage --- page 12 --- To: Advisory Design Panel Date: July 2, 2024 Subject: Rezoning Application RZ 13-23 Page 3 Site context The site is well positioned with connections to retail and service areas given its location at a major Downtown intersection. It also benefits from proximity to key neighbourhood amenities, including: • Timms Community Centre (across the street); • Douglas Park (5-minute walk); and • Douglas Park Elementary School (5-to-10-minute walk). The site is also located near major transportation services, including: • Seven bus routes (directly adjacent); • The Langley Centre transit exchange and the fifteen bus routes it serves, including the frequent 503 Fraser Highway Express (5-to-10-minute walk); and • The planned Langley City Centre SkyTrain station and its associated transit exchange (5-to-7-minute walk). Subject Site Langley Lions Douglas Park City Hall/ Timms Historic Downtown --- page 13 --- To: Advisory Design Panel Date: July 2, 2024 Subject: Rezoning Application RZ 13-23 Page 4 2. Proposed Rezoning and the Official Community Plan (OCP) The site is designated Transit-Oriented Core in the City’s OCP, which allows for residential and commercial development of up to 15 storeys in height (subject to the federal Airport Zoning Regulation) and a Floor Area Ratio (FAR) of up to 5.5. Within the OCP’s Appendix B: District Policies, the Langley Mall has a dedicated set of policies on its redevelopment. These include requirements for a master- planned two- property assembly, high-rise apartment buildings, commercial frontage and public open space on Douglas Crescent, pedestrian access both north-south and east -west through site, adding on- street parking to Douglas Crescent, and maintaining three vehicle accesses near their existing locations. The site is also located within the Transit-Oriented Areas (TOAs) of the Langley City Centre SkyTrain station and Langley Centre bus exchange, as identified in the City’s Zoning Bylaw. These TOAs are required by Provincial legislation (namely the Local Government Act , as amended by Bill 47 passed in November 2023) which introduced TOAs to set specific heights and densities (based on distance from transit) which must be allowed by local governments, along with a prohibition on residential parking requirements except for accessible parking. The City’s OCP allows for greater height and density (15 storeys and 5.5 FAR) than would be permitted by the site’s TOA tier (12 storeys and 4 FAR). In accordance with the TOA, future Development Permit applications will not be subject to minimum residential parking requirements but will be subject to minimum accessible residential and commercial parking requirements. The site is also currently zoned C1 Downtown Commercial which permits high density mixed-use development and a height limit of 46 metres or about 150 ft , which typically equates to 15 residential floors or storeys. The 150 foot building height limit has been in the C1 zone since 1996. The site has been envisioned to accommodate buildings up to 15 storeys in height since 2009, when a site concept for the future redevelopment of the Langley Mall was included in the Downtown Master Plan showing 14 storey residential buildings situated on top of a commercial podium (total of 15 storeys). The subject property is proposed to be rezoned to a site- specific Comprehensive Development (CD) Zone to allow higher densities in future Development Permit applications that are anticipated to behigher than the density permitted by its existing C1 zoning, but still involving a maximum height of 15 storeys. The CD zone will also include a master plan layout to guide the future phased development of the site . Noting that the site is to be built out over multiple phases, this CD Zone -based approach provides flexibility for future individual buildings to respond to different market and policy contexts over time, while maintaining certainty as to the general street and block pattern, building location --- page 14 --- To: Advisory Design Panel Date: July 2, 2024 Subject: Rezoning Application RZ 13-23 Page 5 and pedestrian open space layout of this future development. The primary effect of the site’s CD100 Comprehensive Development zoning will be to allow a mix of uses and higher densities and identify the general street alignments, open space configurations, and building footprints. Within these parameters, the CD100 Zone will allow for different heights, densities and uses, and individual Development Permits will be required prior to any redevelopment occurring, and these Development Permits will include more detail on building integration with the master plan, individual building design and form and character, pedestrian open space design and landscaping. As such, the unit count and density as shown in the proposal’s conceptual massing and in this report are approximate. 2. Design The proposed master plan was designed with the goal of urbanizing the subject site and developingit as an extension of the Downtown area, by way of expanding the adjacent and existing street grid, emphasizing a pedestrian- friendly environment with slow streets and vibrant public spaces, and maint aining of a significant commercial floor area supported by high residential densities, which in turn will support the Downtown’s existing offerings and future transit improvements. It is important to note that while relatively detailed assumptions about the ultimate development have been made in the attached drawing package, including on building heights and uses, the master plan is intended to be flexible in response to market and policy conditions as may exist in the future. Though subject to change, the site is intended to be developed in at least four phases or quadrants over the next 10 to 20 or more years, with the possibility of subphases. The order of these phases is expected to start with the southwest quadrant (5 years to completion), followed by the northwest (5 to 10 years), then the southeast (10- 15 years), and finishing with the northeast quadrant (15- 20 years). This phasing plan is largely based on the lease obligations with the site’s existing tenants, including t he No Frills grocery store. The applicant has indicated that a grocery store use will be maintained as a part of the redevelopment of the site (although likely relocated to a phase fronting Douglas Crescent) and the existing mall commercial space will be largely replaced within new phases on Douglas Cresent. Another tenancy of note is the Tim Hortons located on the northwest corner, which has a multi-decade lease in place. The proposed master plan shows an overall FAR of 4.43 and about 1,900 residential units, although this is subject to change and will be confirmed through future Development Permit applications. As noted above, the maximum FAR for this site in the OCP is 5.5. --- page 15 --- To: Advisory Design Panel Date: July 2, 2024 Subject: Rezoning Application RZ 13-23 Page 6 Overall Site Concept: Walkable Blocks, High-quality Pedestrian Experience The master plan site layout and phasing is based on an urban street and block pattern that divides the 9 acre site into four smaller blocks or quadrants/phases, and follows the existing street and block pattern of the surrounding Downtown area. This street and block pattern is organized around a new internal east -west street between 203 Street and 204 Street and a new north- south street that connects Douglas Crescent to th e new east-west street. These streets will make the site much more walkable by enabling direct pedestrian and cycle access through the site and to/from adjacent properties, and will distribute vehicle traffic evenly through and into and out of the site, and enable easy access for current and future parking and commercial operations, loading and waste management. This new street and block pattern is also centred on an interconnected plaza and pocket park promenade or ‘spine’ that will create a vibrant, attractive and high- quality pedestrian experience and distinct sense of place, following the policies in OCP Appendix B. This plaza-to-pocket park journey begins at the intersection of Douglas Crescent and the new north- south street, where an urban plaza is envisioned to be located and lined with ground floor retail, restaurants, cafes, and street trees, and including outdoor seating, landscaping and public art, and then progressing southward along a wide sidewalk space with an outdoor seating corridor on the east side of the north- south street, and culminating in a pocket park ‘anchor’ at the south end of the site. This pocket park, accessible to the public, is envisioned to act as the ‘green heart’ of the site, complete with grassed/landscaped areas, trees and outdoor play features. This park will also create a pedestrian connection between the site and the Langley Lions site. The proposed new street frontages along 203 Street, 204 Street and Douglas Crescent will feature a high- quality public realm design that is consistent with adjacent Downtown areas, including wide sidewalks, bike lanes, street trees and landscaping pockets and on-street parking to support new street-fronting ground floor commercial spaces along Douglas Crescent and 204 Street. New Street Grid Details At build-out the master plan proposes a new east-west street that will upgrade and realign the existing east-west drive aisle on the existing Mall site, and act as an extension of Park Avenue through the site to 203 Street. This east-west street will also enable commercial parking, loading and waste management access for the phases fronting Douglas Crescent. The Douglas Crescent intersection with the new north-south street will be shifted slightly to improve safety at the intersection, and the existing rear lane will be maintained but widened, both to support Fire Rescue access and its potential to provide residential parkade access, and maintain delivery access to the No Frills grocery store. --- page 16 --- To: Advisory Design Panel Date: July 2, 2024 Subject: Rezoning Application RZ 13-23 Page 7 All streets and lanes on- site are proposed to be privatewith statutory right of ways to permit public passage. As self -contained throughways with limited connections beyond this site, this approach is feasible and allows for the streets to be owned and maintained by the site owner, including allowing the space under these streets to be used for parking. All internal streets will have on- street parking bays. Dedications will be required from all three fronting streets (Douglas, 203 and 204)to accommodate upgrades including lane reconfigurations, sidewalk and bike lane upgrades, new treed boulevards, and on- street parking. Building accesses shown in the master plan are conceptual.Actual locations and detailed designs are to be confirmed as part of Development Permit applications to be made for individual building phases in the future and based on the results of Traffic Impact Assessments (TIAs). Conceptual buildings and uses The buildings in the two northern phases, located between the east -west street and Douglas Crescent, are envisioned to take on a more commercial character, including ground-floor commercial spaces and the potential for an office building on the northwest corner (subject to market conditions). Total commercial floor space at this time is expected to total approximately 11,360 m 2 (122,000 ft 2 ) if the northwest corner is developed with an apartment building or 22,060 m 2 (237,000 ft 2 ) if it is developed with an office building, compared to the site’s existing commercial floor area of approximately 13,000 m 2 (140,000 ft 2 ). Above the commercial ground floors, six residential high-rises are proposed, including two longer buildings flanking a plaza on the southeast corner of the Douglas Crescent intersection and the north- south street. These longer buildings are proposed be angled or ‘canted’ to reduce their apparent massing and floorplate when viewed from the street and to ensure more light access at street level. This approach is based on OCP Development Permit Area Guidelines for high-rises. On the south side of the east-west street, in the two southern phases, four high- rise buildings are proposed with residential uses only. While height and massing will be finalized at the associated Development Permit stages, these buildings will be required to step down in height (from 14 to 10 storeys) toward the south to create a more sensitive transition to the shorter buildings on the neighbouring Langley Lions site and existing buildings on properties to the east and west. The top of the stepped down portion of these high- rises are also envisioned to include roof-top amenity areas and landscaping/trees. All of the proposed high- rise buildings on the site are based on best design practice and generally follow the OCP Development Permit Area guidelines for high-rises, with a particular focus on ensuring the high-rise building faces above 10 storeys are located at least 25 metresor 82 feet apart from each other, to reduce shadowing and massing impacts at street level, allow more light access and a comfortable sense of enclosure at street level , and to help maintain privacy --- page 17 --- To: Advisory Design Panel Date: July 2, 2024 Subject: Rezoning Application RZ 13-23 Page 8 for occupants of these buildings. The spaces between these buildings also enables large outdoor amenity courtyard areas to be placed between towers, for use by the residents of the high- rise residential buildings and complete with landscaping, outdoor play areas, community garden plots and trees. 3. Sustainability Sustainability has been considered in the site design by way of prioritizingeasy pedestrian movement through the site, accommodating new and upgraded bike lanes and boulevards along the fronting streets, and incorporating large green spaces at grade level and asraised courtyards on top of buildings’ parkades. More detailed building -level sustainability features will be identified as part of future individual Development Permit applications. Overall, the site is designed to be a model transit -oriented development, in close proximity to the SkyTrain station, with high densities and a mix of uses that support increased transit ridership and the use of active transportation options, and will reduce automobile dependence and emissions over time. The redevelopment concept also shows the potential for over 210 trees at full build-out, which is almost three times more trees than the existing amount of trees (75) on the site. Efforts will be made throughout build- out, by way of implementing existing and future urban forest management plan policy, to maximize the number of potential trees on site. The total landscaped area proposed in the redeveloped site is almost 5 times more than the current site. These green features, along with high albedo roof c overs, will greatly assist in reducing the significant heat island effect that the Langley Mall creates in the Downtown area during hot weather, and provide a greener and more pleasant pedestrian and urban experience compared to the present site condition. CPTED CPTED (Crime Prevention Through Environmental Design) is addressed by the master plan through its high density and mix of uses, which will encourage the area to be well -used and keep eyes on the street. design principles will be considered through individual phases and their Development Permit applications, which will require CPTED reports with design assessments and recommendations for improvement to be completed by a qualified consultant . All of the public open spaces on the site will be bounded by active commercial and residential uses to ensure there are eyes of the street throughout a 24 hour day. 4. Variances As a master plan implemented through a site- specific Comprehensive Development (CD) Zone, no variances are requested or required. --- page 18 --- To: Advisory Design Panel Date: July 2, 2024 Subject: Rezoning Application RZ 13-23 Page 9 5. Summary The proposed development is consistent with the City’s OCP and District Policies and would convert a large low -density commercial site into a transit -oriented development expanding Downtown. Engineering Requirements: As part of the proposed rezoning the applicant is required to fulfil multiple engineering requirements and conditions to ensure the final expected buildout meets City standards on servicing, transportation, and environmental protection. More detailed building -level engineering requirements will apply at the time of individual Development Permit application s. In recognition of the flexibility incorporated into the master plan, engineering studies at this stage will assume a highest infrastructure demand scenario. Engineering requirements applicable to the subject master plan are as follows , with the Developer responsible for the work which shall be designed by a Professional Engineer: I. All work to be done to the City of Langley’s Design Criteria Manual (DCM) and the City’s Subdivision and Development Servicing Bylaw (SDSB). II. Per the City’s DCM requirement, the Developer and their consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Commitment by Owner and Consulting Engineer) prior to starting their design works. III. At the Developer’s expense, the capacity of the existing water and sanitary sewer systems shall be assessed through hydraulic modeling performed by the City’s standing hydraulic modeling consultant perthe DCM, Sections 3.8 & 6.5. a. Any upgrade requirement for either sanitary or water mains not covered under the City’s DCC bylaw shall be designed and installed by the Developer at the Developer’s expense. b. At the Developer’s expense, the City’s standing hydraulic modeling consultant shall conduct a fire hydrant flow test to be used in the City’s water modeling to determine if the existing water network is adequate for fire flows (based on architectural datasupplied by the Developer’s Architect). Upgrading of existing watermains may be necessary to achieve the necessary pressure and flows to conform to Fire Underwriters Survey (FUS) “Water Supply for a Public Fire Protection, a Guide to Recommended Practice, 1995.” IV. Land dedications and rights -of-way shall be granted to the City based on the design produced by staff and provided to the Developer via email on April 8, 2024. --- page 19 --- To: Advisory Design Panel Date: July 2, 2024 Subject: Rezoning Application RZ 13-23 Page 10 V. At the Developer's expense, a Traffic Impact Assessment (TIA) will be completed per DCM Section 8.21. The proposed development plan and statistics, once ready, should be forwarded to the City Engineer to develop the scope of this traffic study. TIA reports must be approved by the City Engineer prior to taking the application to Council. The TIA completion timing must be: a. For OCP Amendment / Rezoning Applications: Prior to Council’s first and second readings; and b. For Development Permits (DP): Prior to Council consideration of the application. VI. The scope and extent of the off -site works shall be determined in part from the TIA. All road frontages will be upgraded in accordance with the City’s DCM including new sidewalk s, curbs, streetlighting, street trees, landscape strip and cycling facilities.The new road frontages shall tie into existing sidewalks, curb & gutters and cycling network at each end. VII. The condition of the existing pavement along all the proposed project’s frontages shall be assessed by a geotechnical engineer. Pavements shall be adequate for an expected road life of 20 years under the expected traffic conditions for the class of road. Road construction and asphalt overlay designs shall be based on the analysis of the results of Benkelman Beam tests and test holes carried out on the existing road which is to be upgraded. If the pavements are inadequate, they shall be remediated by the Developer, at the Developer’s expense. VIII. Existing street lighting along the entire project frontages shall be analyzed (excluding any BC Hydro lease lights) by a qualified electrical consultant to ensure street lighting and lighting levels meet the criteria outlined in the DCM. Any required street lighting upgrades, relocation, and/or replacement shall be done by the Developer at the Developer’s expense. IX. The site layout shall be reviewed by a qualified Professional Engineer to ensure that the parking layout, vehicle circulation, turning paths and access design meet applicable standards and sightline requirements, including setbacks from property lines. Appropriate turning templates should be used to prove parking stalls, loading areas and drive aisles are accessible by service vehicles. Refer to DCM Section 8.0. The design shall be adequate for MSU trucks as the design vehicle. X. The Developer is required to deposit all requisite bonding and fees as outlined in the Subdivision and Development Servicing Bylaw. Fire Department Comments: The department has reviewed the overall Master Plan for this property. The department’s main concern is aroundaccess to all buildings on the site. The primary access concern is fromthe south along the laneway as well ensuring --- page 20 --- To: Advisory Design Panel Date: July 2, 2024 Subject: Rezoning Application RZ 13-23 Page 11 minimum 8 metre wide unobstructed internal roads throughout the property. The department will continue to work with each individual building development to ensure adequate access for fire apparatus and personnel to each building on site. Advisory Design Panel: In accordance with Development Application Procedures Bylaw No. 2488, the subject Zoning Bylaw amendment application will be reviewed by the Advisory Design Panel (ADP) at the July 18, 2024 meeting. According to the Council -approved ADP Terms of Reference, the ADP is to provide form and character and urban design- related advice and recommendations for Council’s consideration. In the absence of an associated Development Permit application, the ADP’s role is to provide input on public realm and building interfaces to be considered in the detailed design of future phases. Presentation of this master plan to the ADP will also provide the necessary context for future evaluation of Development Permitapplications by the ADP (i .e. how does the subject building relate to the rest of the master - planned site). ADP recommendations will be presented to Council through the ADP meeting minutes and, if applicable, through an additional City staff report, prior to Council consideration of the proposed Zoning Bylaw amendment. A copy of the ADP minutes will be presented to Langley City Council at a future Regular Council meeting. BUDGET IMPLICATIONS: Development Cost Charges (DCCs) and Community Amenity Contributions (CACs) are payable to the City at time of Building Permit issuance, which are preceded by Development Permit applications. As this application is solely for a rezoning, no DCCs or CACs will be provided with this application. Prepared by: _______________________ Anton Metalnikov, RPP, MCIP Planner --- page 21 --- To: Advisory Design Panel Date: July 2, 2024 Subject: Rezoning Application RZ 13-23 Page 12 Concurrence: __________________________ Roy M. Beddow, RPP, MCIP Deputy Director of Development Services Concurrence: _____________________ Carl Johannsen, RPP, MCIP Director of Development Services Concurrence: Concurrence: __________________________ __________________________ David Pollock, P.Eng. Scott Kennedy Director of Engineering, Parks, Fire Chief & Environment Attachments --- page 22 --- To: Advisory Design Panel Date: July 2, 2024 Subject: Rezoning Application RZ 13-23 Page 13 REZONING APPLICATION RZ 13-23 Civic Address: 5501 204 Street & 20300 Douglas Crescent Legal Description: Lot 375, District Lot 36, Group 2, New Westminster District, Plan 46221; Parcel A, District Lots 305 and 36, Group 2, New Westminster District, Plan BCP35185 Applicant: Orion Construction Owner: 0622215 B.C. LTD. --- page 23 --- --- page 24 --- --- page 25 --- --- page 26 --- --- page 27 --- --- page 28 --- --- page 29 --- --- page 30 --- --- page 31 --- --- page 32 --- --- page 33 --- --- page 34 --- --- page 35 --- --- page 36 --- --- page 37 --- --- page 38 --- --- page 39 --- --- page 40 --- --- page 41 --- --- page 42 --- --- page 43 --- --- page 44 --- --- page 45 --- --- page 46 --- --- page 47 --- --- page 48 --- --- page 49 --- --- page 50 --- --- page 51 --- --- page 52 --- --- page 53 --- --- page 54 --- --- page 55 --- --- page 56 --- --- page 57 --- --- page 58 --- --- page 59 --- --- page 60 --- --- page 61 --- --- page 62 --- --- page 63 --- --- page 64 --- --- page 65 --- --- page 66 --- --- page 67 --- --- page 68 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject: Development Permit Application DP 1 4 - 23 Rezoning Application RZ 12-23 (20220-20230 Michaud Crescent) File #: 6620.00 From: Anton Metalnikov, RPP, MCIP Planner Bylaw #: 32 91 Doc #: Date: July 3 , 2024 RECOMMENDATION: THAT this report be received for information. PURPOSE OF REPORT: To consider Development Permit and Zoning Bylaw amendment applications by Matthew Cheng Architect Inc. for a 6-storey, 64-unit apartment development at 20220-20230 Michaud Crescent. POLICY: The subject propert ies are currently zoned RM1 Multiple Residential Low Density Zone in Zoning Bylaw No. 2100 and designated “ Transit-Oriented Residential” in the Official Community Plan Land Use map. All lands designated for multi -unit residential use are subject to a Development Permit (DP) to address building form and character. The density of the proposed development complies with the Official Community Plan but exceeds the parameters in the current Zoning Bylaw. As such, a Comprehensive Development Zone is proposed to accommodate it. --- page 69 --- To: Advisory Design Panel Date: July 3, 2024 Subject: Development Permit Application DP 14-23 & Rezoning Application RZ 12-23 Page 2 COMMENTS/ANALYSIS: Background Information: Applicant: Matthew Cheng Architect Inc. Owner: Elegant Glass Holdings Ltd. Civic Addresses: 20220 - 20230 Michaud Crescent Legal Description: Parcel “A” (Reference Plan 7403), Lot 1, District Lot 305, Group 2, New Westminster District, Plan 1614; Strata Lots 1 & 2, District Lot 305, Group 2, New Westminster District, Strata Plan NW1538 Site Area: 2,027.68 m 2 (0.50 acres) Number of Units: 64 apartments Gross Floor Area: 5,494.93 m 2 (59,147 ft 2 ) Floor Area Ratio: 2.710 Lot Coverage: 37% Total Parking Required: 3 h/c spaces (Provincial Transit-Oriented Area; no minimum required residential parking, other than accessible spaces) Parking Provided: Resident Visitor Total 63 spaces 1 spaces 64 spaces (including 3 h/c spaces) OCP Designation: Transit-Oriented Residential Existing Zoning: RM1 Multiple Residential Low Density Proposed Zoning: CD101 Comprehensive Development Variances Requested: 2.4 m small car width (2.5 m required) 59% small car spaces (40% max.) Distance of 0.3 m between parking spaces and walls (0.6 m required) Development Cost Charges: $1,159,372.00 (City - $537,500.00, GVS&DD - $248,200.00, GVWD - $245,936.00, SD35 - $34,400.00, TransLink - $93,336.00) Community Amenity Contributions (CACs): $260,000.00 --- page 70 --- To: Advisory Design Panel Date: July 3, 2024 Subject: Development Permit Application DP 14-23 & Rezoning Application RZ 12-23 Page 3 Discussion: 1. Context The applicant is proposing to develop a 6- storey, 64-unit apartment building on a site consisting of two duplex properties. The site is located in an established higher-density residential area which consists of apartment buildings and townhome-style buildings of various sizes and ages and has seen a higher recent level of development interest, with several developments recently completed, under construction, or in the application stage nearby. The site’s primary frontage is formed on the north by Michaud Crescent, a collector road with a greenway character which currently has pedestrian and cycling-oriented improvements under construction. Michaud Community Gardens sits across this street and will be expanded upon the completion of the Capstone, a 6- storey apartment building under construction immediately adjacent to the north. Unconstructed lane rights-of-way flank the site to the west and east, which separate it from Michaud Manor Apartments (3- storey building completed in 1984) and the Suede (4- storey apartment building completed in 2011) respectively. Chelsea Terrace (3-storey apartment building completed in 1988) neighbours the site to the east. Site context Subject Site 5 - storey apartment application Michaud Manor Apartments Linwood Park Suede Chelsea Terrace The Capstone 6-storey apartment approved 6-storey apartment applications 8-storey apartment u/c Mixed-use master plan application Michaud Community Gardens --- page 71 --- To: Advisory Design Panel Date: July 3, 2024 Subject: Development Permit Application DP 14-23 & Rezoning Application RZ 12-23 Page 4 The site is well positioned with connections to retail and service areasgiven its Downtown location. It also benefits from proximity to key neighbourhood amenities, including: • Michaud Community Gardens and Linwood Park (few minutes’ walk); • Timms Community Centre (5-to-10-minute walk); and • Nicomekl Elementary School (10-minute walk). The site is also located near several transportation services, including: • Six bus lines within a 5-minute walk; • The frequent 503 Fraser Highway Express bus (10-minute walk); and • The 203 Street SkyTrain station and its associated transit exchange ( 5-to- 7 minute walk, about 450 metres). 2. Proposed Rezoning and the Official Community Plan (OCP) The site is designatedTransit-Oriented Residential in the City’s OCP, which allows for apartment development of up to 15 storeys in height and a Floor Area Ratio (FAR) of up to 4.5. The subject properties are proposed to be rezoned to a site-specific Comprehensive Development (CD) Zone as no existing zones adequately accommodate the Transit-Oriented Residential designation. A new Zoning Bylaw is currently in development and the project was designed to conform to the preliminary draft zoning regulations associated with this designation. Should the CD rezoning be adopted it is anticipated that, as part of adopting the new Zoning Bylaw, the City will rezone this site from its CD Zone to the new zone created to implement the Low Rise Residential designation. The site is also located within the Transit-Oriented Areas (TOAs) of the Langley City Centre SkyTrain station and Langley Centre bus exchange, as identified in the City’s Zoning Bylaw. These TOAs were identified recently as required by changes to Provincial legislation (namely the Local Government Act , as amended by Bill 47 passed in November 2023) which introduced TOAs to set specific heights and densities (based on distance from transit) which must be allowed by local governments, along with a prohibition on residential parking requirements except for accessible parking. The City’s OCP allows for greater height and density (15 storeys and 4.5 FAR) than would be permitted by the site’s TOA tier (8 storeys and 3 FAR). In accordance with the TOA, this application will not be subject to minimum residential parking requirements but will be subject to minimum accessible residential parking requirements. The site consists of two duplex properties (one rental and one strata) which appear to both have been illegally split into fourplexes at some point in the past. This means there are two purpose-built rental units, but eight total units currently --- page 72 --- To: Advisory Design Panel Date: July 3, 2024 Subject: Development Permit Application DP 14-23 & Rezoning Application RZ 12-23 Page 5 being rented out. Under Policy 1.16.1 of the City’s OCP, the proposed new development must replace any existing purpose- built rental units at a one- to-one ratio, with these replacement units secured by a Housing Agreement. The applicant has proposed to meet this requirement by including two rental units in the new development, with the Housing Agreement to secure the replacement units to be executed prior to the application proceeding to consideration of Final Reading by Council. The other 62 units will be sold as condominiums. This approach supports OCP Policy 1.16.2., which encourages mixed- tenure (rental and strata) developments. 3. Tenant Relocation Plan Council Policy CO-81 ( Tenant Relocation Plans) applies to the redevelopment of purpose-built rental buildings, with duplex buildings exempted from the Policy . However, given that the current buildings function as rental fourplexes , and despite the requirement to replace only two purpose- built rental units,the applicant is undertaking a Tenant Relocation Plan, as required by Policy 1.18 ( Tenant Relocation Plans) of the City’s OCP and Council Policy CO -81 to meet the intent of these policies. A separate explanatory memo detailing the applicant’s efforts and communications with existing tenants to date will be provided when the application is considered by Council. The Provincial Residential Tenancy Act legislation also applies. 4. Design The application is for a wood-frame building oriented in an obtuse L-shape with direct frontage along Michaud Crescent to the north and the west lane. This configuration allows the building to maximize density in its low -rise form and screen an internal parking area which is served by a ramp off the south lane due to its slight elevation above grade. This parking area is enclosed with concrete walls on its other two sides, including a zero lot line condition on the east and a roof which acts as a common courtyard. An additional underground parking level is served by a dedicated ramp off the rear lane. The primary pedestrian entrance is located on the building’s northeast corner, with ground- floor units having individual front doors and walk-out patios along Michaud Crescent and the west lane. On the ground floor, a single-loaded building design allows for more space at the rear for the surfaced parking area. On the floors above, the building transitions to a double-loaded configuration and sits above this parking area on columns. The building rises to a height of six storeys, with the top floor raised on the north and west sides of the interior corridor. The building’s exterior takes a “base- middle-top” design approach. The ground level features a painted grey raised concrete patio level and brick cladding on the first two floors , which are interspersed withstrips of grey fiber cement siding. --- page 73 --- To: Advisory Design Panel Date: July 3, 2024 Subject: Development Permit Application DP 14-23 & Rezoning Application RZ 12-23 Page 6 These strips continue up the building where they break up a predominantly white fiber cement siding façade, which is further decorated by warmer extruded frame features. The top floor is more muted in shade, stepped back, and finished with a prominent cornice. Balconies of alternating lengths from floor to floor decorate the building’s northwest corner. The development’s landscaping softens its outside edge with a variety of shrubs and grasses. Additional plantings are incorporated where planting areas are larger, including columnar Japanese maple trees dotted between the unit patios and a pink flowering dogwood and bruns Serbian spruce near the main entrance. The raised courtyard features additional species spread among a number of raised planters of various sizes which are used to delineate different outdoor amenity spaces, private unit patios, and the edge of the courtyard. A pink flowering dogwood is provided on this level too, totalling ten trees across the development, with additional street trees to be provided as part of required frontage upgrades. The courtyard amenity space is programmed with a children’s play area, barbecue area, lounge area, and seven resident garden plots. The unit type distribution of the building includes 14 one-bedroom units, 43 two- bedroom units, and 7 three-bedroom units. 14 (21%) of the units are adaptable. Resident storage facilities are provided in storage rooms located in common areas as well as within individual units. 476 m 2 (5,124 ft 2 ) of total amenity space is provided, including 74 m 2 (797 ft 2 ) of indoor amenity space and 402 m 2 (4,327 ft 2 ) of outdoor amenity space. A two-elevator core services the building. 5. Sustainability The proposal incorporates several sustainable development features, including: • Using construction techniques that minimize site disturbance and protect air quality; • Using lighting systems meeting ground-level and dark skies light pollution reduction principles; • Achieving an energy performance of 25% above the current Model National Energy Code for multi-unit residential buildings; • Reducing the heat island effect by use of a landscaped courtyard covering the surface parking area; • Using drought-tolerant and non- water dependent materials in the landscape design served by an irrigation system with central control and rain sensors; • Using water-conserving toilets; • Providing 10 resident parking stalls with Level II electric vehicle (EV) chargers, with the remaining resident spaces pre-wired and visitor spaces pre-ducted for future installation; and • Providing resident garden plots. --- page 74 --- To: Advisory Design Panel Date: July 3, 2024 Subject: Development Permit Application DP 14-23 & Rezoning Application RZ 12-23 Page 7 6. CPTED The applicant’s proposal benefited from a comprehensive Crime Prevention Through Environmental Design (CPTED) review by a qualified consultant whose recommendations were incorporated into the plans. 7. Variances The applicant’s proposed development is generally consistent with the draft 6-12 storey apartment building zoning regulations that are being considered for the new Zoning Bylaw and which may be used to regulate relatively lower -density developments under the Official Community Plan’s Transit-Oriented Residential land use designation. However, given the proponent has applied to redevelop the site prior to the adoption of the new Zoning Bylaw, a site-specific Comprehensive Development (CD) Zone is proposed to be created to accommodate the redevelopment. Despite the use of a CD Zone, the proposal requires variances from general Zoning Bylaw provisions to reduce the width of small car parking spaces to 2.4 metres (from 2.5 metres), increase the share of small car parking spaces to 59%, compared to a maximum of 40% , and reduce the space between parking spaces and walls to 0.3 metres (from 0.6 metres) . These adjustments were made to help accommodate a greater number of parking space on a site which is not subject to minimum parking requirements, other than for accessible stalls, due to its location within the Langley City CentreSkyTrain station Transit-Oriented Area (TOA) . Specifically, this approach allows for 64 parking spaces to be provided, which is equivalent to one parking space per unit. Reducing the width of small car spaces to 2.4 metres is under consideration for the new Zoning Bylaw to accommodate additional parking spaces in all developments. This width is also similar to other municipalities in the region, such as Burnaby, which has a minimum small car space width of 2.4 metres, and Richmond, which has a minimum small car space width of 2.3 metres. Staff are not considering changes to the required drive aisle widths in the Zoning Bylaw to ensure safe and convenient vehicle movements i n parking areas are maintained. Staff are considering increasing the maximum small car share in the Zoning Bylaw to 60% for properties within the “Core” and “Shoulder” in the Official Community Plan, which this site is located within. This approach can significantly improve parkade space efficiency, as the use of slightly smaller individual spaces often results in the creation of additional stalls on the same amount of land. Staff note the Township of Langley, Coquitlam, Richmond and Surrey permit the distance between parking spaces and parkade walls to be as low as 0.3 metres . --- page 75 --- To: Advisory Design Panel Date: July 3, 2024 Subject: Development Permit Application DP 14-23 & Rezoning Application RZ 12-23 Page 8 This proposed variance is considered to be minor and is under consideration for inclusion in the upcoming new Zoning Bylaw. Based on the above commentary and analysis, staff support these variances. 8. Summary The proposed development is consistent with the City’s OCP and Development Permit Area guidelines for th e area and presents a transit-supportive and efficient design providing housing in close proximity to parks, transit, and Downtown. Engineering Requirements: Additional design changes may be required upon further investigation, site inspections and receipt of other supporting reports and documents. All work to be done to the City of Langley’s Design Criteria Manual (DCM), and the City’s Subdivision and Development Servicing Bylaw (SDSB). Per the City’s DCM requirement, the developer and their consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Commitment by Owner and Consulting Engineer) prior to starting their design works. Per the City’s Watercourse Protection Bylaw No. 3152, the developer’s consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Confirmation of Commitment by Qualified Environmental Professional - QEP) prior to starting their site monitoring works. These requirements have been issued to reflect the application for development for a proposed 64-Unit Apartment Development located at 20220-20230 Michaud Crescent. These requirements may be subject to change upon receipt of a development application. The City’s Zoning Bylaw, 1996, #2100 has requirements concerning landscaping for buffer zonings, parking and loading areas, and garbage and recycling containers, all of which applies to this design. A) The developer is responsible for the following work which shall be designed by a Professional Engineer: --- page 76 --- To: Advisory Design Panel Date: July 3, 2024 Subject: Development Permit Application DP 14-23 & Rezoning Application RZ 12-23 Page 9 I. A Qualified Environmental Professional (QEP) must be engaged to implement erosion and sediment control in accordance with the City of Langley Watercourse Protection Bylaw #3152, as amended. II. A storm water management plan for the site is required. Rainwater management measures used on site shall limit the release rate to pre- development levels to mitigate flooding and environmental impacts as detailed in the City’s DCM with 20% added to the calculated results to account for climate change. A safety factor of 20% shall be added to the calculated storage volume. Pre-development release rates shall not include climate change effect. III. All existing services shall be capped at the main by the City, at the Developer’s expense prior to applying for a demolition permit. IV. New water, sanitary and storm sewer service connections are required. All pertinent pipe design calculations shall be submitted in spreadsheet format and shall include all formulas for review by the City. The Developer’s engineer will determine the appropriate main tie-in locations and size the connections for the necessary capacity. V. At the Developer’s expense, the capacity of the existing water and sanitary sewer mains shall be assessed through hydraulic modeling performed by the City’s standing hydraulic modeling consultant per DCM 3.8 and 6.5. a. Any upgrade requirement for either sanitary or water mains not covered under the City’s DCC bylaw shall be designed and installed by the Developer at the Developer’s expense. b. At the Developer’s expense, the City’s standing hydraulic modeling consultant shall conduct a fire hydrant flow test to be used in the City’s water modeling to determine if the existing water network is adequate for fire flows (based on architectural data supplied by the Developer’s Architect). Upgrading of the existing watermain(s) may be necessary to achieve the necessary pressure and flows to conform to Fire Underwriters Survey (FUS) “Water Supply for a Public Fire Protection, a Guide to Recommended Practice, 1995.” VI. Additional C71P fire hydrants may be required to meet bylaw and firefighting requirements. Hydrant locations must be per DCM Section 3.10 and approved by the City Engineer and the City of Langley Fire Rescue Service. VII. A property dedication of 1m will be required along the lane west of the project frontage of the proposed development to provide a new lane width of 7m – to be determined by a legal surveyor. A 4m corner truncation will be required at the intersection of the 2 fronting lanes. VIII. At the Developer's expense, a Traffic Impact Assessment (TIA) will be completed per DCM Section 8.21. The proposed development plan and statistics, once ready, should be forwarded to the City Engineer to develop the scope of this traffic study. TIA reports must be approved by the City Engineer prior to taking the application to Council. The TIA completion timing must be: --- page 77 --- To: Advisory Design Panel Date: July 3, 2024 Subject: Development Permit Application DP 14-23 & Rezoning Application RZ 12-23 Page 10 a. For OCP Amendment / Rezoning Applications: Prior to Council’s first and second readings; and b. For Development Permits (DP): Prior to Council consideration of the application. IX. The scope and extent of the off-site works shall be determined in part from the TIA. New sidewalk, barrier curb, gutter will be required along the project’s Michaud frontage, complete with boulevard trees and a planting strip. The Michaud frontage shall tie into existing sidewalk, curb & gutter and cycling network at each end. X. The condition of the existing pavement along all the proposed project’s frontages shall be assessed by a geotechnical engineer. Pavements shall be adequate for an expected road life of 20 years under the expected traffic conditions for the class of road. R oad construction and asphalt overlay designs shall be based on the analysis of the results of Benkelman Beam tests and test holes carried out on the existing road which is to be upgraded. If the pavement is inadequate, it shall be remediated by the Developer, at the Developer’s expense. XI. The site layout shall be reviewed by a qualified Professional Engineer to ensure that the parking layout, vehicle circulation, turning paths and access design meet applicable standards and sightline requirements, including setbacks from property lines. Appropriate turning templates should be used to prove parking stalls, loading areas and drive aisles are accessible by service vehicles. Refer to DCM Section 8.0. The design shall be adequate for MSU trucks as the design vehicle. XII. Existing street lighting along the entire project frontage shall be analyzed (excluding any BC Hydro lease lights) by a qualified electrical consultant to ensure street lighting and lighting levels meet the criteria outlined in DCM 9.0. Any required street lighting upgrades, relocation, and/or replacement shall be done by the Developer at the Developer’s expense. XIII. Eliminate the existing overhead BC Hydro/telecommunication infrastructure along the development’sMichaud project frontage by replacing with underground infrastructure. XIV. Pre-ducting shall be a minimum requirement. XV. A dedicated on-site loading zone shall be provided by the developer. The design shall be adequate for MSU trucks as the design vehicle. B) The Developer is required to deposit the following bonding and fees: I. The City will require a Security Deposit based on the estimated construction costs of installing civil works, as approved by the City Engineer. II. The City will require inspection and administration fees in accordance to the Subdivision Bylaw based on a percentage of the estimated construction costs, as per the City’s Subdivision and Development Servicing Bylaw 2021 #3126. --- page 78 --- To: Advisory Design Panel Date: July 3, 2024 Subject: Development Permit Application DP 14-23 & Rezoning Application RZ 12-23 Page 11 III. A deposit for a storm, sanitary and water services is required, which will be determined by City staff after detailed civil engineering drawings are submitted, sealed by a Professional Engineer. IV. The City will require a $40,000 bond for the installation of a water meter to current City standards as per the DCM. V. A signed and sealed pavement cut form (Form F-2 of the City’s DCM) shall be completed by the developer’s consulting engineer. Upon the review and approval of the City Engineer of the submitted form, the corresponding Permanent pavement cut reinstatement and degradation fees shall be paid by the Developer. NOTE: Deposits for utility services or connections are estimates only. The actual cost incurred for the work will be charged. The City will provide the developer with an estimate of connections costs, and the Developer will declare in writing that the estimate is acceptable. C) The Developer is required to adhere to the following conditions: I. The Developer’s Consulting Engineer shall perform their periodic Field Reviews, as required by EGBC, and send a copy of the Review to the City Engineer within a week of completion of each Review II. Unless otherwise specified by the City Engineer, all engineering works shall be designed based on the City’s DCM specifications in accordance with the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 III. Undergrounding of hydro, telecommunication to the development site is required, complete with underground or at-grade transformer. IV. Transformers servicing developments are to be located on private property with maintenance access located on private property. All transformers to be wrapped upon installation by the Developer. V. All survey costs and registration of documents with the Land Titles Office are the responsibility of the developer/owner. Please refer to the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 for more details. VI. A water meter is required to be installed on private property, preferably in the mechanical room, in accordance to the City's DCM standards at the Developer's cost. VII. An approved backflow prevention assembly must be installed on the domestic water connection immediately upon entering the building to provide premise isolation. VIII. A Stormceptor or equivalent oil separator is required to treat site surface drainage. IX. A complete set of record drawings (as -built) of off-site works, service record cards and a completed tangible capital asset form (TCA) all sealed by a Professional Engineer shall be submitted to the City within 60 days of the --- page 79 --- To: Advisory Design Panel Date: July 3, 2024 Subject: Development Permit Application DP 14-23 & Rezoning Application RZ 12-23 Page 12 substantial completion date. Digital drawing files in .pdf and .dwg formats shall also be submitted. All the drawing submissions shall: a. Use City’s General Note Sheet and Title Block; and b. Closely follow the format and sequence outlined in the City’s DCM that will be provided to the Developer’s Consulting Engineer. X. The selection, location and spacing of street trees and landscaping are subject to the approval of the City Engineer. Please refer to the City’s DCM for more details. XI. Stormwater run -off generated on the site shall not impact adjacent properties, or roadways. XII. Garbage and recycling enclosures shall accommodate on the site and be designed to meet Metro Vancouver’s “Technical Specifications for Recycling and Garbage Amenities in Multi -family and Commercial Developments - June 2015 Update.” Please refer to the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 for more details. Fire Department Comments: Fire department access for the whole project was reviewed to ensure adequate access was in place for apparatus and firefighters. A construction fire safety plan shall be completed, complete with crane inspection records. A progressive standpipe installation will be required as construction rises. Standpipes will be required at the parkade entrance, and in elevator lobby refuge area. All garbage/recycling containers must be stored in a fire rated, sprinklered room, and must be of adequate size to prevent spillover into adjacent area. Stairwells must be constructed to accommodate shelter in place applications. Marked Exits must not be on a fob. A radio amplification bylaw is currently in development and will need to he adhered to. Consideration will be given to the installation of power banks in the storage room lockers for e- bikes charging. A Fire Safety plan and FD lock box (knox box) will be required before occupancy. The 4” FDC will be located on a pedestal at the front of the building, exact location to be discussed with the Fire Department at a later date. Advisory Design Panel: In accordance with Development Application Procedures Bylaw No. 2488, the subject Zoning Bylaw amendment and Development Permit application will be reviewed by the Advisory Design Panel (ADP) at the July 18, 2024 meeting. According to the Council -approved ADP Terms of Reference, the ADP is to provide form and character and urban design- related advice and recommendations for Council’s consideration. ADP recommendations will be presented to Council through the ADP meeting minutes and, if applicable, --- page 80 --- To: Advisory Design Panel Date: July 3, 2024 Subject: Development Permit Application DP 14-23 & Rezoning Application RZ 12-23 Page 13 through an additional City staff report, prior to Council consideration of the proposed Zoning Bylaw amendment and Development Permit Applications. A copy of the ADP minutes will be presented to Langley City Council at a future Regular Council meeting. BUDGET IMPLICATIONS: In accordance with Bylaw No. 2482, the proposed development would contribute $537,500.00 to City Development Cost Charge accounts and $260,000.00 in Community Amenity Contributions. Prepared by: _______________________ Anton Metalnikov, RPP, MCIP Planner Concurrence: __________________________ Roy M. Beddow, RPP, MCIP Deputy Director of Development Services Concurrence: _______________________ Carl Johannsen, RPP, MCIP Director of Development Services --- page 81 --- To: Advisory Design Panel Date: July 3, 2024 Subject: Development Permit Application DP 14-23 & Rezoning Application RZ 12-23 Page 14 Concurrence: Concurrence: __________________________ __________________________ David Pollock, P.Eng. Scott Kennedy Director of Engineering, Parks, Fire Chief & Environment Attachments --- page 82 --- To: Advisory Design Panel Date: July 3, 2024 Subject: Development Permit Application DP 14-23 & Rezoning Application RZ 12-23 Page 15 DEVELOPMENT PERMIT APPLICATION DP 14-23 REZONING APPLICATION RZ 12-23 Civic Addresses: 20220-20230 Michaud Crescent Legal Description: Parcel “A” (Reference Plan 7403), Lot 1, District Lot 305, Group 2, New Westminster District, Plan 1614; Strata Lots 1 & 2, District Lot 305, Group 2, New Westminster District, Strata Plan NW1538 Applicant: Matthew Cheng Architect Inc. Owner: Elegant Glass Holdings Ltd. --- page 83 --- --- page 84 --- --- page 85 --- --- page 86 --- --- page 87 --- --- page 88 --- --- page 89 --- --- page 90 --- --- page 91 --- --- page 92 --- --- page 93 --- --- page 94 --- --- page 95 --- --- page 96 --- --- page 97 --- --- page 98 --- --- page 99 --- --- page 100 --- --- page 101 --- --- page 102 --- --- page 103 --- --- page 104 --- --- page 105 --- --- page 106 ---