Agenda - Advisory Design Panel Source: https://www.langleycity.ca/media/file/adp-agenda-september-11-2024 Archived copy: https://heylangley.ca/records/city-of-langley/committees/advisory-design-panel/2024/2024-09-11-agenda-adp-agenda-september-11-2024.pdf SHA-256 of the PDF: 5b11c92c7c68e4028109d455d456f1f12bbbbbde3279ce38b7007021c904f246 Fetched: 2026-11-10 --- page 1 --- ADVISORY DESIGN PANEL WEDNESDAY, SEPTEMBER 11, 2024 AT 7:00 PM CKF Room Langley City Hall (In-Person Meeting) A G E N D A 1) AGENDA Adoption of the September 11, 2024 agenda. 2) MINUTES Adoption of minutes from the July 18, 2024 meeting. 3) LANGLEY CITY CENTRE SKYTRAIN STATION SkyTrain station at 5710-5740 203 Street & 5673 203A Street. 4) DEVELOPMENT PERMIT APPLICATION DP 09-23 Triplex at 5135 208A Street. 5) NEXT MEETING October 2, 2024 (TBC). 6) ADJOURNMENT --- page 2 --- Document Number: 195930 MINUTES OF THE ADVISORY DESIGN PANEL HELD IN COUNCIL CHAMBERS, LANGLEY CITY HALL THURSDAY, JULY 18, 2024 AT 7:00 PM Present: Councillor Paul Albrecht (Chair) Councillor Mike Solyom (Co-Chair) Mayor Nathan Pachal Blair Arbuthnot Tony Osborn Matt Hassett Leslie Koole Dammy Ogunseitan Ella van Enter Absent: Jaswinder Gabri Ritti Suvilai Staff: C. Johannsen, Director of Development Services P. Kusack, Deputy Corporate Officer A. Metalnikov, Planner Chair Albrecht began by acknowledging that the land on which we gather is on the traditional unceded territory of the Katzie, Kwantlen, Matsqui and Semiahmoo First Nations. 1) AGENDA Adoption of the July 18, 2024 agenda. It was MOVED and SECONDED THAT the agenda for the July 18, 2024 Advisory Design Panel be approved. CARRIED 2) MINUTES Adoption of minutes from the June 27, 2024 meeting. It was MOVED and SECONDED --- page 3 --- ADP Minutes – July 18, 2024 2 THAT the minutes of the June 27, 2024 Advisory Design Panel meeting be approved as circulated. CARRIED 3) ZONING BYLAW AMENDMENT APPLICATION RZ 13-23 Multi-phase apartment & commercial mixed-use master plan at 5501 204 Street & 20300 Douglas Crescent. Carl Johannsen, Director of Development Services introduced the project noting it is a large multiphase site planned to be built out over 20 years. The rezoning amendment phase is a high level overview of the site noting that more detail will be provided at the development permit stage. Anton Metalnikov, Planner, spoke to the staff report dated July 2, 2024 and provided a brief overview of the Zoning Bylaw amendment application noting that it is a large site and is a muti-phase mixed-use plan. He provided some examples of the potential building look and size that could be considered for the site. Panel members provided the following comments about the proposal: • Cohesion between the proposed site master plan and the neighbouring Langley Lions housing site master plan should be considered due to the proximity and function of the sites. o Staff noted that there will be a cohesive pedestrian access from the Lions site to the Langley mall site and ultimately to the Skytrain station. • Northwest corner building – consider an office building instead of a residential building and include a podium style to increase light and air toward the center of the development, between towers. • The amount of commercial space planned for the site is approximately 80%-90% of what is currently there now. o Staff noted that it is a fundamental requirement of the applicant to retain a grocery store. • Generally, the north side of site will be commercial and south of the east-west through road will be residential. • Street parking, bike lanes and sidewalks will increase from current levels. There will be underground and surface parking. o Parking will be provided phase by phase o Staff noted that provincial law prohibits municipalities from regulating levels of residential parking, however the City can set accessible parking requirements. o Staff will review required parking based on use as development applications are submitted. o Commercial tenants have their own minimum parking requirements. o Three levels of underground parking are proposed. The Chair noted that each development phase will come back to the Advisory Design Panel for consideration before it is presented to City Council. --- page 4 --- ADP Minutes – July 18, 2024 3 The Applicant team entered the meeting: Jeremy Paquin, Manager, Development, Orion Construction Tyler Knoepfel, Senior Development Manager, Cedar Coast Mo Ahmed, Landscape Designer, KM Civil Consultants Ltd. Rhys Leitch, Principal, Integra Architecture Inc. On behalf of the applicant, Jeremy Paquin provided opening remarks with respect to this multi-phased project noting that Orion is a leading developer in the area, and they are very active in Langley. He introduced Tyler Knoepfel, Cedar Coast and advised they are active in BC, Washington and Oregon. Rhys Leitch presented the application and provided a high-level overview of the vision for the development including the following: • Site location • Adjacent properties and uses • Design rationale o The site has been broken down into sections enabling the development of a vibrant site in downtown Langley o Connections to the major streets in the north, east and west o Over 200,000 square feet of commercial space o Residential density has considered neighbouring properties and introduced significant greenspace on the site • Building massing o Overall density of the site o Adding trees and greenbelts o Generous pedestrian realm with restaurants, walkways, vibrant environment • Site data, commercial / residential mix • Aerial view of the master plan including access roads, building placement, plaza location • Ground floor plan – commercial activity, loading access, parkade access • Overview of floor plans levels 1 – 14 • Three levels of underground parking • Towers are 83 feet apart to allow for good visibility • Overall landscape plan includes 230 trees on the site • Focus on pedestrian friendly spaces, a park, public plaza, courtyards, and outdoor seating • CPTED principles The panel members offered the following comments and responses were provided as noted: • Consideration should be given to pedestrian only access from the north and south of the site, instead of including vehicular access at those points. • Consider a variation in podium sizes, not just two on each building. • Increase commercial space. • Not determined if strata or rental at this point. • Podium design has upper amenity space, community garden --- page 5 --- ADP Minutes – July 18, 2024 4 • It is a central location, a hub in the community. Consider enhancing the pedestrian corridor to connect Park Ave, Douglas Park and City Hall, consider a gateway feature. • Use the buildings at the north, coming from the future Skytrain and running along Douglas Crescent to highlight public art and pull the flow of people to the site. • Utilize open patios and flexible indoor/outdoor spaces that spill people into pedestrian corridors. • Differentiate buildings with use of materials, colour, and style. o The applicant noted that the intention is to have different features but with links that connect the buildings visually. • Space is intended to have seating areas and connections to the outdoors from the restaurants to engage people walking through. This is an important part of the central spine design concept. • Quadrants would take close to twenty years to build out and development would be staggered. The starting point being considered is the southwest quadrant, which is residential. o The applicant noted that the intention is to retain existing commercial spaces for tenants while building the new space. • Be informed by adjacencies to make improvements. Consider logical alignments to serve adjacencies. • Park Avenue has interesting character, consider using east/west street to make a full connection to Douglas Park. • Take connection to the Lions housing site more seriously. Termination is a wall and it could be a park instead. o The applicant noted that the lane between the sites is challenging and the City requires a full intersection. o Challenge to provide connections between two private properties with public access. The intention was that the park was the terminus. o Staff noted because it is a multi-phase development the lane must be maintained for 10+ years to service the commercial tenants. As the development permit phases occur it will determine what is built out and what happens around the space. o Staff further noted the lane is required for fire access and it will also distribute traffic. • Consider adjusting some placements to make the two sites look more intentional. • Consider the opportunity to provide solar access to make sure people use those spaces most of the year. • The intention is to provide opportunities for people to move through the site both east/west and north/south. • Put a greater focus on the pedestrian perspective. o Consider a peek-a-boo view from the northwest corner along Douglas Crescent to invite interest in visiting the site, not just building massing along Douglas Crescent. o Consider pedestrian only laneways through the space. o Expand impression (not footprint) of the south end park space, spill out into town center area and bring more interest to the rest of the space. o Encourage treatments all the way through the north half of the pedestrian space. There is more opportunity to spill out into the town center. Puch north to more public facing elements. • South lane will be expanded from 6m to 8m and will have residential patios. • Planting will define the park space, possibly a gate. • Consider shade study and how plantings grow. --- page 6 --- ADP Minutes – July 18, 2024 5 o The applicant noted that shadow studies were done and the way the buildings shade each other, and the public realm was considered in the design and building placement. • Consider separation of upper amenity space from commercial areas, ensure for the resident use only. • Ensure adequate parking is provided. o The applicant noted that commercial and residential visitor parking will be overlapped as they are used at different times of day. o Staff noted that the City will be diligent about how growth is shaped. The applicant has an optimal design grid for this site. o As phases develop parking needs will diminish. o It was noted that the provincial government regulates residential parking requirements. • Consider east/west connection to Michaud Crescent as it is a major connection point for pedestrians and cyclists. • Retain some historical feel to the space. o Consider a road treatment to acknowledge the heritage of the original interurban rail route. o Originally the site of a greenhouse operation, consider ways to bring back the history of the site, perhaps a design element that hints to the past. • The northwest intersection will be viewable from the new Skytrain station. That is a key viewpoint for the City. o Ensure the public realm is interesting at that location. • Consider improvements to the lane between the Langley Lions site and this site. There will be 1000 residents when the Lions project is complete and it is an active access point. • The play area could be better utilized. Perhaps focus on seniors and the need for passive space for them. • Consider providing / enhancing public bike parking space. • Improve the look of the loading zone. o The applicant noted that there is one entry point and then commercial trucks will be hidden behind the commercial area. • Consider the opportunity to have the sidewalk continue through, and not let down for the road. This provides a clear message it is intended for pedestrians. • Staff noted that a public access agreement will ensure the public can use the onsite park. The applicant team left the meeting. It was MOVED and SECONDED THAT: 1. The ADP receive the staff report for information; and 2. The ADP recommends the applicant give further consideration to the following prior to the application proceeding to Council: a. Add a drawing of the site’s context with the Langley Lions complex, look for opportunities to strengthen the relationship and connection between the subject and Langley Lions sites, improve connections between the southern park and the Langley Lions lane, and incorporate a unique surface treatment in the lane --- page 7 --- ADP Minutes – July 18, 2024 6 b. Consider more variation in height of podium levels c. Give consideration to prominent gateway features related to surrounding context (e.g. Douglas Park, SkyTrain station, etc.) d. Design commercial frontages to effectively activate and engage with the adjacent pedestrian realm (uses spilling out, garage doors, etc.) e. Ensure there is variation in façade design and material use and colours between different building phases, with consideration to existing and historical context (e.g. street grid and interurban alignment, greenhouse, etc.) f. Consider solar access in building articulation and provide shadow diagrams, including in the articulation diagrams g. Look for opportunities to greater enhance the street ground scape, including with further emphasis on pedestrians h. Enhance and provide more pedestrian view points around and through the site i. Allow design features within the park (water features, furniture, etc.) to be less compartmentalized and blend through each other more (and extend features further north into public realm), and consider more seniors-friendly programming j. Emphasize an engaging and visually interesting frontage at the northwest corner adjacent to the intersection of Douglas Crescent and 203 Street k. Incorporate enhanced bicycle parking facilities as part of development applications l. Mitigate the visual and pedestrian impacts of the loading and parkade entrances m. Incorporate level sidewalk heights across carriageway intersections wherever possible n. Include a diverse residential unit mix Staff note: Provide more information on the future design of the 203 Street & Michaud Crescent intersection. BEFORE QUESTION WAS CALLED there was discussion about solar access / shadow studies and loss of parking in the mall parking lot. It was noted that on-street parking will be improved. The City will be conducting a parking strategy, and looking at parking in relation to the development of SkyTrain. THE QUESTION WAS CALLED and same was CARRIED 4) DEVELOPMENT PERMIT APPLICATION DP 14-23 ZONING BYLAW AMENDMENT APPLICATION RZ 12-23 6-storey, 64-unit apartment building at 20220-20230 Michaud Crescent Anton Metalnikov, Planner introduced the project and provided context to the application. He further spoke to the staff report dated July 3, 2024 and provided a brief overview of the Development Permit application. The Applicant team entered the meeting: Matthew Cheng, Architect, Matthew Cheng Architect Inc. --- page 8 --- ADP Minutes – July 18, 2024 7 Ali Tahmoresi, Intern Architec, Matthew Cheng Architect Inc. Caelan Griffiths, Landscape Architect, PMG Landscape Architects Ltd. Namanmeet Singh, Developer, Elegant Glass Holdings Matthew Cheng provided information on the following: • Development location • Underground parking • Vehicular access and parking details • Indoor / outdoor amenities • Form and character • Elevations and finishings • CPTED • Landscape design and outdoor amenity space The applicant team responded to questions from panel members regarding the following: • Visitor parking stalls would be reduced by 3 stalls if a gate is installed to separate it from the resident parking. • Consider better visitor access to the building and resident areas, there are no sidewalks or lane. It is not clear how one enters the building from there. • Consider improvements to the entry lobby. o A unique condition exists where it is possible to combine the stair and ramp area and change the entry point to enable everyone to use the same space equally, instead of separating. o Change the orientation of the entry to improve access and attain a better view of the landscape areas. • Consider limiting the number of colours used on the exterior, increase use of woodgrain colour, or use brick. • Orange highlights don’t match from left side to right side of building. Needs more consistency. Possibly include colour on the inside as well. • Consider replacing the ‘spinner’ play unit with something more usable for multiple children at once, ie: swing set. • Provide a rendering of what size bed can fit in the bedrooms. • Plug ins for ebikes will be included. • Consider moving bike parking from the street to the lobby, perhaps the existing ‘office’ space. • Air conditioning provided is for one room, not the whole suite. The co-chair left the meeting at 9:32pm. • Consider warmer tones in the back of the building. Back to front feel disconnected visibly. • Improve aesthetics in the lane for residents that are facing it. • Consider improvements to parkade bike stall access to the building. There are a lot of doors. Can the number of doors you need to pass through be reduced. Mechanical doors are ideal if you must pass through them with bikes. • Install Canada Post grade mail hardware as it is more theft resistant. • Utilize fob access for building doors. --- page 9 --- ADP Minutes – July 18, 2024 8 • Parking ramp - ensure clear visibility east/west as the lane will have traffic in both directions. o The applicant noted that there will be a 6m flat area at the top of the ramp. The applicant team left the meeting. Further discussion took place about parking and the new provincial laws. It was MOVED and SECONDED THAT: 1. The ADP receive the staff report for information; and 2. The ADP recommends the applicant give further consideration to the following prior to the application proceeding to Council: a. Consider redesigning the lobby entrance to integrate the stairs and ramp, including by shifting the location of the entry door, face the northeast landscape island, and move bicycle rack (preferably with two-point locking racks) closer to lobby entrance b. Consider design enhancements and variation to the roof line c. Consider colour palette adjustments (e.g. replacing tan material with greater use of wood grain siding, review extent of tan material along extruded frames for harmony, consider incorporating it more on the rear elevations, etc.) d. Consider an alternative play feature that could be used by more children at a time e. Clarify the size of beds that could fit into bedrooms f. Incorporate Canada Post mailbox standards for security g. Look for potential improvements to walking bicycles through the building (e.g. reconfiguring locations, automatic doors, etc.) h. Review use of enterphones at parkade entrances i. Ensure adequate sightlines are provided at intersection of south lane and parkade accesses j. Review the interface of the west lane and its fronting units k. Clarify the intent of the office space BEFORE THE QUESTION WAS CALLED it was noted that the City’s tenant relocation policy will apply to this development. Staff will review the land use with regard to the proposed residential office space in the lobby and will inquire further as to the intended use. THE QUESTION WAS CALLED and same was CARRIED 5) NEXT MEETING September 11, 2024 --- page 10 --- ADP Minutes – July 18, 2024 9 6) ADJOURNMENT It was MOVED and SECONDED THAT the meeting adjourn at 9:50 pm. CARRIED __________________________________ ADVISORY DESIGN PANEL CHAIR __________________________________ DEPUTY CORPORATE OFFICER --- page 11 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject: Langley City Centre SkyTrain Station ( 5710 - 5740 203 Street & 5673 203A Street ) File #: 6620.00 From: Anton Metalnikov, RPP, MCIP Planner Bylaw #: Doc #: Date: September 5, 2024 RECOMMENDATION: THAT this report be received for information. PURPOSE OF REPORT: To consider the form and character of the Langley City Centre (‘LCC’) SkyTrain station, proposed as part of the Surrey Langley SkyTrain (SLS) project being led by Transportation Investment Corporation (TIC) of the Province of British Columbia, and as designed by the Station contractor South Fraser Station Partners (SFSP) and project architect Francl Architecture Inc. POLICY: The LCC SkyTrain station is the sole SkyTrain station within the City of Langley, and is not subject to rezoning and/or a Development Permit. As part of the Development Advisory Process (DAP) agreed to between the City of Langley and TIC, the City has the right to provide non-binding input to TIC and SFSP on the design of the SkyTrain station and its site. As part of exercising this right, the City has elected to bring the project to the Advisory Design Panel (ADP) for its review, with the input received to be provided to TIC and SFSP along with previously compiled staff comments. --- page 12 --- To: Advisory Design Panel Date: September 5, 2024 Subject: Langley City Centre SkyTrain Station Page 2 Discussion: 1. Context The SLS project consists of a 16-kilometre extension of the Expo Line, from its current terminus of King George Station in downtown Surrey to a new terminus in Downtown Langley City, with a total of 8 new stations. This new terminus station, which had previously been known as the “203 Street station” but since has been renamed Langley City Centre (LCC) Station, is projected to be one of the most well-used stations on the extension, as the ‘gateway’ into the regional rapid rail system and a catalyst for significant pedestrian activity & Transit- Oriented Development (TOD). With the SkyTrain line running down Industrial Avenue in Langley City, the LCC station will be located on a large vacant site just east of its intersection with 203 Street. Langley City Centre SkyTrain Station & site context The City’s Official Community Plan (OCP), adopted in 2021, supports the SkyTrain extension, both at a higher level to align the surrounding land uses with the significant access improvements and demand for homes, job spaces, and services created by the SkyTrain, and at a finer grain to ensure the station and guideway were designed in harmony with the expected buildings and public spaces nearby. The OCP’s Policy 2.32.1 on SkyTrain stations and guideway design stated the City’s intent to collaborate with TransLink and the Province to ensure station entrances and surrounding areas are designed to maximize TOD opportunities, be safe, accessible, easy to use and inviting for SkyTrain users --- page 13 --- To: Advisory Design Panel Date: September 5, 2024 Subject: Langley City Centre SkyTrain Station Page 3 and include innovative art, lighting, landscaping, and public space elements to integrate the station into the urban fabric. Also, given the area south of the Station currently consists of an empty lot, a lane and the ‘back of house’ of single storey buildings along Fraser Highway (which ‘hide’ the future Station from the high-profile Fraser Highway/203 Street intersection), the attached OCP Appendix B: District Policies, and as illustrated below, sets out a vision for significant TOD that connects the Station to Fraser Highway and seamlessly integrates SkyTrain into the City’s highly walkable Downtown. Key features of the OCP vision for the LCC Station include: • Relocating the existing transit exchange to the north side of LCC Station; • Extending Industrial Avenue and 203A Street to ‘complete the grid’; • Designating the area immediately south of the Station, including the lane and properties fronting Fraser Highway, for future TOD that is directly adjacent to the Station and includes active and safe pedestrian connections between Station entrances and Fraser Highway, 203 Street, and 203A Street. This is intended to create a vibrant and safe experience for SkyTrain users, and create an attractive landmark destination, anchored by major plaza at Fraser Highway, that ties the Station to one of the City’s most visible and important intersections and is representative of the Station’s ‘gateway’ role. In order to facilitate this, the OCP requires all areas/properties south of the Station, including those on Fraser Highway, to be assembled into one comprehensively-planned TOD parcel; • Ensuring that ground floor retail, with housing and offices above, is located adjacent to pedestrian areas and plazas, to provide the ‘eyes on the street’ and activity that supports a comfortable transit user experience; and • Locating a community and/or transit police office on the Station site, to further enhance site and area safety. --- page 14 --- To: Advisory Design Panel Date: September 5, 2024 Subject: Langley City Centre SkyTrain Station Page 4 On the strength of the City’s OCP policies staff worked closely with TIC during the Reference Concept Design (RCD) stage to ensure the basic Station design, that was eventually used in the process to retain a design-build contractor, included a transit exchange on the north side of the Station and enabled future TOD between the Station footprint and Fraser Highway. The successful contractor, SFSP, has developed an LCC Station design that is consistent with the RCD. As shown in the attached drawing package (described in detail in the following section), the SFSP design includes a ‘temporary’ south plaza area that provides an open and landscaped public realm that will be in place for likely 5 to 10 years (between opening day of SkyTrain service and eventual TOD redevelopment of the area as envisioned in the OCP), and the design of the station south facade won’t prevent future adjacent development. 2. Design As noted above the contractor’s design is closely aligned with the RCD and incorporates a number of driving factors including City policy and the operational requirements of the BC Rapid Transit Company (BCRTC, which operates the SkyTrain system) and the Coast Mountain Bus Company (CMBC, which operates the bus system). These factors include the extension of Industrial Avenue and 203A Street, the inclusion of a bus exchange and layover area, and the accommodation of parking for staff of various associated agencies. The station is aligned diagonally through the site, with the station plaza (noted as ‘South Plaza’ on above site context map) surrounding it and expanding out to --- page 15 --- To: Advisory Design Panel Date: September 5, 2024 Subject: Langley City Centre SkyTrain Station Page 5 the southwest. This plaza is designed with a number of different treatments, including a saw-cut concrete pattern as the primary hardscape, a cast-in-place concrete mosaic highlighting the station entrances, and unit pavers in the larger open plaza area and beside the at-grade commercial retail unit (CRU) located at the east end of the Station. This CRU is intended to provide on site retail service for transit users and pedestrian activity/‘eyes on the street’ for the east end of the Station and transit exchange prior to the redevelopment of the South Plaza area. Additionally, a ‘wave’ paving pattern is used on the north side of the Station (between the Station wall and transit exchange bays), which carries through a similar paving pattern along the south side of Industrial Avenue to the west, which was designed as part of a separate public realm plan associated with the road, multi-use pathway and sidewalk surface under the SkyTrain guideway (see image below for an example of the wave pattern boulevard along the south side of Industrial Avenue). The wave pattern is intended to evoke the Nicomekl River and its journey through the City, and the significant role it has played in shaping the geographical and historical context of the Langley City area. This paving pattern is a part of a broader public realm enhancement concept that supports future TOD development along Industrial Avenue; this concept will include public art and interpretive feature installations spaced along the corridor, as well as decorative uplighting of the SkyTrain guideway columns in the future. Surface parking spaces are provided along the lane south of the Station, for use by staff of operating agencies including SkyTrain staff and Transit Police (these spaces will be integrated into the parkades of future buildings as redevelopment occurs). Trees are incorporated in planting areas of different sizes throughout the site. Furnishings include benches and a large outdoor bicycle rack. --- page 16 --- To: Advisory Design Panel Date: September 5, 2024 Subject: Langley City Centre SkyTrain Station Page 6 The space to the northeast of the station is oriented toward bus operations and includes five bus bays and a layover area. The layover area has been designed to support electric bus charging capability in the future and leaves a smaller area adjacent to the planned intersection of Industrial Avenue and 203A Street to host the required infrastructure. Additional trees are proposed on the perimeter. The station has four entrances, with one on the north and south sides of each end. Both sets of entrances have up and down escalators and an elevator for access to the centre platform above. A bike parkade (a Compass-card secured room with two-level racks) is included near the northwest entrance. Much of the middle of the station ground floor, below the platform, is occupied by interior non-public service rooms that are only accessible for SkyTrain and transit support staff (ie. BCRTC and CMBC). TIC and SFSP have also indicated that this interior service space will also accommodate Transit Police staff on-site. Intercom kiosks are also planned to be provided in the Station area, including at ground level (outside of fare paid zone/gates) and platform level, to enable transit users to call and communicate with Transit Police and BCRTC staff. Additional information is expected to be provided by TIC and SFSP as the LCC Station design progresses to its final iteration and construction. The Station and public realm materials are consistent with those intended to be used for all stations along the SkyTrain extension, and will be similar to other newer stations such as those along the Millennium Line “Evergreen Extension” in the Tri-Cities. Key station materials include heavy timber soffits and ceilings, stone panel walls, large glazed areas, and metal accents. 3. Propulsion Power Substation (PPS) Propulsion Power Substations (PPS) are buildings supplying electrical power to the SkyTrain system that are generally associated with stations. One PPS is planned in Langley City along Industrial Avenue near its intersection with 201A Street, approximately 225 metres to the west of the station. This PPS is sited nearly abutting the east property line, with the remainder of the property used for associated infrastructure, vehicular access, and two staff parking spaces. The PPS will present a height of approximately two storeys, and will be primarily finished in stone/concrete panels, with doors and a decorative fin in steel. The PPS façade design is driven by the need to house high voltage electrical equipment, which precludes windows or other openings. This being said, the location of the PPS along the east side of the site (including access), as well as the blank façade nature of the building, does permit future buildings to be --- page 17 --- To: Advisory Design Panel Date: September 5, 2024 Subject: Langley City Centre SkyTrain Station Page 7 constructed adjacent to the PPS (and possibly over top of the PPS, as seen in other communities with similar facilities). 4. Sustainability The project’s sustainability approach prioritizes natural light and uses energy- efficient systems and durable materials, including cross-laminated timber. 5. Summary The planned Langley City Centre station has been a primary consideration within the City’s long-range planning, including both transportation and land use. In turn, the City has set expectations for the Province and its contractor to align the station’s design with the City’s vision for the immediate area and Downtown. Fire Department Comments: Fire department access for the whole project was reviewed to ensure adequate access was in place for apparatus and firefighters. A construction fire safety plan shall be completed and updated on a regular basis. A Fire Safety plan and FD lock box (knox box) will be required before occupancy, location to be discussed at a later date. The 4” FDC location will be determined later in the project schedule in discussions with the Fire Department. Advisory Design Panel: As a Provincial project, the SkyTrain extension and Langley City Centre station is not subject to formal municipal permitting or approvals. However, the City has worked closely with BC TIC over the course of the project to shape its design and reached an agreement to provide non-binding recommendations through an adjusted process similar to those used for development applications. Accordingly, the station design will be reviewed by the Advisory Design Panel (ADP) at the September 11, 2024 meeting. The ADP is to provide form and character and urban design-related advice which will be provided to BC TIC and their contractor SFSP for their consideration. Prepared by: _______________________ Anton Metalnikov, RPP, MCIP Planner --- page 18 --- To: Advisory Design Panel Date: September 5, 2024 Subject: Langley City Centre SkyTrain Station Page 8 Concurrence: __________________________ Roy M. Beddow, RPP, MCIP Deputy Director of Development Services Concurrence: _______________________ Carl Johannsen, RPP, MCIP Director of Development Services Concurrence: Concurrence: __________________________ __________________________ David Pollock, P.Eng. Scott Kennedy, Fire Chief Director of Engineering, Parks, & Environment Attachments --- page 19 --- --- page 20 --- --- page 21 --- --- page 22 --- --- page 23 --- --- page 24 --- --- page 25 --- --- page 26 --- --- page 27 --- --- page 28 --- --- page 29 --- --- page 30 --- --- page 31 --- --- page 32 --- --- page 33 --- --- page 34 --- --- page 35 --- --- page 36 --- --- page 37 --- --- page 38 --- --- page 39 --- --- page 40 --- --- page 41 --- --- page 42 --- --- page 43 --- --- page 44 --- --- page 45 --- --- page 46 --- --- page 47 --- --- page 48 --- --- page 49 --- --- page 50 --- --- page 51 --- --- page 52 --- --- page 53 --- --- page 54 --- --- page 55 --- --- page 56 --- --- page 57 --- --- page 58 --- --- page 59 --- --- page 60 --- --- page 61 --- Appendix B - 12 04. 203 STREET STATION AREA The future SkyTrain Station at 203 Street will be a powerful catalyst for significant redevelopment. Located in proximity to the Civic Centre and the Downtown Langley core, the area is in a prime location with many underused properties with low density commercial and car-oriented uses. A new planned transit exchange at this important terminus to the SkyTrain line will require careful urban design considerations and the surrounding area’s land uses and connections will require strong integration with the station and exchange to encourage people to use this important infrastructure. VISION A high density, mixed use, transit-oriented hub which supports key destinations such as the Civic Centre and Downtown Langley core to create a complete, vibrant Downtown area. POLICIES 3.1. Locate the 203 Street SkyTrain Station, bus transit exchange and associated transit infrastructure in this area, maximize multimodal access to these facilities and the redevelopment potential of adjacent properties, and ensure public realm areas are designed to be pedestrian-friendly and safe and create a memorable, highly usable and amenity-rich ‘gateway experience’ for transit users. 3.2. Develop a public open space near the northeast corner of the Fraser Highway and 203 Street intersection. This open space will include a plaza and/or park a minimum of 30 metres wide, and with direct and level pedestrian connections to the 203 Street SkyTrain Station entrance plaza and Transit Exchange pedestrian waiting area(s), and direct sightlines between Fraser Highway and the SkyTrain Station entrance. Design adjacent development and transit infrastructure to border and integrate with this space, complete with active ground floor commercial uses, residential units and features that animate this space throughout the day and evening and provide ‘eyes on the street’ surveillance. --- page 62 --- Appendix B - 13 3.3. Locate a community and/or a transit policing office adjacent to the 203 Street SkyTrain station and transit exchange, preferably bordering the public open space and/or SkyTrain station access and transit exchange waiting area. 3.4. Enable adjacent development to directly interface with and screen the 203 Street Skytrain Station, transit exchange and any bus parking facilities with multiple bays. Unscreened bus parking areas fronting Fraser Highway and 203 Street are prohibited. 3.5. Create a new street connection between 203 Street and 203A Street, in line with the 203 Street and Industrial Avenue intersection and subject to confirmation of street design and configuration by the City. 3.6. Extend 203A Street to Fraser Highway to provide access for the transit exchange and redevelopment in this area. 3.7. Require the assembly of properties into viable redevelopment parcels (as shown in the adjacent “Areas of Assembly” map): 3.7.1 Area A - Properties fronting Fraser Highway and south of the 203 Street SkyTrain Station are required to be assembled into a single redevelopment parcel and/or consolidated into a single master-planned development concept with the SkyTrain station and related transit infrastructure. 3.7.2 Area B - Properties north of the 203 Street SkyTrain station are required to be assembled into redevelopment parcels that are a minimum of 0.35 hectares (about 0.9 acres). 3.7.3 All redevelopment proposals are required to consider the redevelopment of adjacent properties and identify how new buildings and open spaces will relate and integrate with each other, and how vehicular and underground parking designs relate to and if applicable, provide access to adjacent properties. 3.8. Encourage regional office and hotel uses to locate in this area. 3.9. Require commercial ground floors along major street frontages. 3.10. Design transit operations and parking facilities in a manner that minimizes noise, idling and access impacts to adjacent residents and businesses. Areas of Assembly (as per policy 3.7) A B New Streets & Open Space New Street Open Space --- page 63 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject: Development Permit Application DP 0 9 - 23 ( 5135 208A Street ) From: Anton Metalnikov, RPP, MCIP File #: 6620.00 Planner Bylaw #: Doc #: Date: August 26, 2024 RECOMMENDATION: THAT this report be received for information. PURPOSE OF REPORT: To consider a Development Permit application by Dino Barbucci for a triplex at 5135 208A Street. POLICY: The subject property is currently zoned RS1 Single Family Residential in Zoning Bylaw No. 2100 and designated “Ground Oriented Residential” in the Official Community Plan Land Use Designation Map. All multi-unit residential developments are subject to a Development Permit (DP) to address building form and character. --- page 64 --- To: Advisory Design Panel Date: August 26, 2024 Subject: Development Permit Application DP 09-23 Page 2 COMMENTS/ANALYSIS: Background Information: Applicant: Dino Barbucci Owner: Dino Barbucci Civic Address: 5135 208A Street Legal Description: Lot 233 , District Lot 3 6 , Group 2, New Westminster District, Plan 56744 Site Area: 668 m 2 ( 7,190.53 ft 2 ) Number of Units: 3 Gross Floor Area: 471.76 m 2 ( 5,078 ft 2 ) Floor Area Ratio: 0.706 Lot Coverage: 32.45 % Total Parking Required: 4 spaces Parking Provided: Resident Visitor Total 6 spaces 1 space 7 spaces OCP Designation: Ground Oriented Residential Zoning: RS1 Single Family Residential Variances Requested: 9.73 m height (9 m maximum) 6.5 m rear setback (7.5 m minimum) Development Cost Charges: $51,874.00 (City - $25,100.00, GVS&DD - $9,916.00, GVWD - $10,396.00, SD35 - $1,700.00, TransLink - $4,762.00) Community Amenity Contributions (CACs): $12,000.00 --- page 65 --- To: Advisory Design Panel Date: August 26, 2024 Subject: Development Permit Application DP 09-23 Page 3 Discussion: 1. Context The applicant is proposing to develop a triplex on the site of a single-detached lot at 5135 208A Street. This site is located in an area of single-detached homes where the properties generally along 208 Street, including the subject site, have been designated as Ground Oriented Residential in the City’s Official Community Plan (OCP). This designation allows for townhome and plex-home development of up to 3 storeys in height and a Floor Area Ratio (FAR) density of 1.2, and is further guided by the City’s Townhome & Plex-Home Best Practices Guide. The property is located on a cul-de-sac with a second frontage at the rear along 208 Street. All properties on this cul-de-sac share the same Ground Oriented Residential OCP designation and RS1 Single Family Residential uses which, in accordance with recent City amendments in compliance with Provincial requirements, permits development of up to 4 units per lot. The subject application is the first development application on this block, though a townhome application is located nearby approximately 100 metres south along 208 Street. Site context Blacklock Elementary Subject Site Townhome Applications City Park Nicholas Park --- page 66 --- To: Advisory Design Panel Date: August 26, 2024 Subject: Development Permit Application DP 09-23 Page 4 The site is located in a distinctly residential area but has convenient walking connections to retail and service destinations, with Downtown located within a 15-minute walk. It also has other key neighbourhood amenities nearby, including: • 560 bus line (few-minutes’ walk); • Blacklock Fine Arts Elementary School (5-minute walk); and • Nicholas and City Parks (5-to-10-minute walk). 2. Proposed Development and the Official Community Plan (OCP) The site is designated Ground Oriented Residential in the City’s OCP, which allows for townhome and plex-home development of up to 3 storeys in height and a Floor Area Ratio (FAR) density of up to 1.2. Additional policy in the OCP specifies that for Ground Oriented Residential lands on a cul-de-sac, properties may develop as plex-homes individually, or as townhomes if all properties are assembled into a single development site, along with the cul-de-sac right of way. The site is also currently zoned RS1 Single Family Residential. In November 2023, the Province of BC adopted amendments to the Local Government Act through Bill 44 to require all local governments to update their Zoning Bylaws to permit the development of additional units on properties previously zoned for single-family residential only. The City of Langley adopted this Zoning Bylaw amendment in June 2024, which amended the subject property’s zoning to permit up to 4 residential units. As such, both the subject property and the other single- family lots in the nearby area, including those outside the Ground Oriented Residential OCP designation, have plex-home development rights. The subject application for a 3-unit residential building is permitted under this updated zoning but, as all multi-unit residential buildings, is subject to a Development Permit (DP) to address building form and character. As part of the ongoing development of a comprehensive new Zoning Bylaw, staff will bring forward additional options for updates to plex-home zoning regulations, along with proposals to streamline the plex-home application process, including exempting them from consideration by the Advisory Design Panel. While it requires some variances, the subject application is generally consistent with the existing RS1 zoning and complies with the City’s Townhome & Plex- Home Best Practices Guide, including the following guidelines: • Balconies do not face lots designated Suburban or Urban Residential in the OCP; • Building at a 3-storey height with no adjacent Suburban or Urban Residential lots; • Balconies are separated by an opaque divider; • Using a peaked roof; • Incorporating a resident walk-out connection to 208 Street; --- page 67 --- To: Advisory Design Panel Date: August 26, 2024 Subject: Development Permit Application DP 09-23 Page 5 • Replacing existing fencing with a 2-metre-tall composite fence; and • Providing no tandem parking spaces. 3. Design The proposed triplex development consists of a single 3-storey building generally taking the form and massing of a single-detached house. It is located on a pie- shaped lot with a narrow frontage onto a cul-de-sac bulb and a wider rear property line along the 208 Street arterial. Within this context, the building is oriented to the north side lot line, with the pedestrian entrance located nearest to the property entrance and a visitor parking space tucked in perpendicularly behind a row of shrubs. This layout allows the building and its units’ individual yards to be accommodated while also creating room for additional parking and vehicular maneuvering space. This provides three indoor and three outdoor resident parking spaces for a total of six, along with a seventh parking space for use by visitors. The driveway narrows near the middle of the property to make space for the building but maintains a width of 4.5 metres to allow vehicles to comfortably reverse out. A small gate is also provided along the rear property line to provide building residents quicker pedestrian access to 208 Street. The layout of the building itself includes a common central building entrance which serves the indoor 3-car garage, a 2-bedroom + den flat on the ground floor, and two 2-storey 3-bedroom homes on the upper two floors. The ground floor is split roughly in half lengthwise, with the flat on the northern half and the shared garage on the southern half. In addition to its connection to the common entrance, the garage has dedicated pedestrian accesses to both the front and rear of the property and has its individual vehicle entrances on the side facing the driveway. The flat has entrances from both the interior common area as well as from a dedicated exterior door, which provides access to a front yard space. The upper two floors are also split roughly in half lengthwise, with mirrored 2- level floor plans taking access from the interior common entrance. Each of these units has both front and rear balconies and a private backyard. The proposed design uses a natural colour palette with different shades of stone serving as a base and wood longboard, contrasting fascias, and glass guardrails providing an accent. The landscaping contributes to the project design with shrubs used to delineate spaces such as yards and parking spots and trees punctuating the larger spaces. Pavers will be used throughout the driveway, outdoor parking spaces, and backyard patios to enhance the hardscape. 4. Sustainability The proposal incorporates the following sustainable development features: • Using construction techniques that minimize site disturbance; --- page 68 --- To: Advisory Design Panel Date: August 26, 2024 Subject: Development Permit Application DP 09-23 Page 6 • Incorporating the use of recycled building materials; • Achieving an EnerGuide for New Houses rating of 80 and an energy performance of 25% better than the current Model National Energy Code; • Incorporating an irrigation system with central control and rain sensors; and • Using water-conserving toilets. 5. Variances The applicant has requested two variances from RS1 Zone regulations to allow for increased height and a reduced rear yard setback. Staff support these requests per the rationales below. The increased height, of 73 cm from 9 to 9.73m, allows the building to achieve a 3-storey height. This is consistent with the Townhome & Plex-Home Best Practices Guide, which supports 3-storey buildings where they are not directly adjacent to properties designated Suburban or Urban Residential in the OCP. All properties around this site, both adjacent and separated by streets, are designated Ground Oriented Residential in the OCP. The increased height also allows the building to use a pitched roof, as included in the Best Practices Guide. The reduced rear yard setback, from 7.5 metres to 6.5 metres, is consistent with the OCP, in which the Development Permit Area guidelines for Ground Oriented Residential properties include a minimum yard dimension of 3 metres for yards facing public streets, as is the case with this application. While the unit balconies intrude into the 6.5 metre building face-to-property line distance, they remain consistent with this 3-metre minimum. It should also be noted that, despite the setback reduction, the lot coverage is below the 33% minimum in the RS1 Zone. 6. Summary The proposed development is generally consistent with the City’s zoning, OCP, Development Permit Area guidelines, and Townhome & Plex-Home Best Practices Guide, and provides family-oriented homes in a missing middle/gentle density form near transit, parks, and an elementary school. Engineering Requirements: Additional design changes may be required upon further investigation, site inspections and receipt of other supporting reports and documents. All work to be done to the City of Langley’s Design Criteria Manual (DCM), and the City’s Subdivision and Development Servicing Bylaw (SDSB). --- page 69 --- To: Advisory Design Panel Date: August 26, 2024 Subject: Development Permit Application DP 09-23 Page 7 Per the City’s DCM requirement, the developer and their consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Commitment by Owner and Consulting Engineer) prior to starting their design works. Per the City’s Watercourse Protection Bylaw No. 3152, the developer’s consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Confirmation of Commitment by Qualified Environmental Professional - QEP) prior to starting their site monitoring works. These requirements have been issued to reflect the application for development for a proposed triplex development located at 5135 208A Street. These requirements may be subject to change upon receipt of a development application. The City’s Zoning Bylaw, 1996, #2100 has requirements concerning landscaping for buffer zonings, parking and loading areas, and garbage and recycling containers, all of which applies to this design. A) The Developer is responsible for the following work which shall be designed by a Professional Engineer: I. A Qualified Environmental Professional (QEP) must be engaged to implement erosion and sediment control in accordance with the City of Langley Watercourse Protection Bylaw #3152, as amended. II. A storm water management plan for the site is required. Rainwater management measures used on site shall limit the release rate to pre- development levels to mitigate flooding and environmental impacts as detailed in the City’s DCM section 5.0. All calculations shall be based the City’ DCM with 20% added to the calculated results to account for climate change. A safety factor of 20% shall be added to the calculated storage volume. Pre-development release rates shall not include climate change effect. III. All existing services shall be capped at the main by the City, at the Developer’s expense prior to applying for a demolition permit. IV. New water, sanitary and storm sewer service connections are required. All pertinent pipe design calculations shall be submitted in spreadsheet format and shall include all formulas for review by the City. The Developer’s engineer will determine the appropriate main tie-in locations and size the connections for the necessary capacity. V. At the Developer’s expense, the capacity of the existing sanitary sewer mains shall be assessed per DCM 6.5.6 --- page 70 --- To: Advisory Design Panel Date: August 26, 2024 Subject: Development Permit Application DP 09-23 Page 8 a. Any upgrade requirement for sanitary mains not covered under the City’s DCC bylaw shall be designed and installed by the Developer at the Developer’s expense. VI. At the Developer's expense, a Basic Traffic Impact Assessment (TIA) will be completed per the DCM Section 8.21. VII. New sidewalk, sidewalk, barrier curb, gutter will be required along the entire 208 St. and 208A St. frontages, complete with boulevard trees and a planting strip as per the City DCM cross-sections SS-R18 and SS- R20 and Section 11.0 - Specifications and Standards for Landscaping. These requirements will be met with a cash-in-lieu contribution by the Developer. VIII. The condition of the existing pavement along the proposed project frontages shall be assessed by a geotechnical engineer. Pavements shall be adequate for an expected road life of 20 years under the expected traffic conditions for the class of road. Road construction and asphalt overlay designs shall be based on the analysis of the results of Benkelman Beam tests and test holes carried out on the existing road which is to be upgraded. If the pavement is inadequate, it shall be remediated by the Developer at their expense. IX. Existing street lighting along the entire project frontage shall be analyzed (excluding any BC Hydro lease lights) by a qualified electrical consultant to ensure street lighting and lighting levels meet the criteria outlined in DCM 9.0. Any required street lighting upgrades, relocation, and/or replacement shall be done by the Developer at their expense. X. Eliminate the existing overhead BC Hydro/telecommunication infrastructure along the development’s 208 St. frontage by replacing with underground infrastructure. This requirement shall be met with a cash- in-lieu contribution by the Developer. B) The Developer is required to deposit the following bonding and fees: I. The City will require a Security Deposit based on the estimated construction costs of installing civil works, as approved by the City Engineer. II. The City will require inspection and administration fees in accordance to the Subdivision Bylaw based on a percentage of the estimated construction costs, as per the City’s Subdivision and Development Servicing Bylaw 2021 #3126. III. A deposit for a storm, sanitary and water services is required, which will be determined by City staff after detailed civil engineering drawings are submitted, sealed by a Professional Engineer. IV. The City will require a $9,000 bond for the installation of a water meter to current City standards as per the DCM. --- page 71 --- To: Advisory Design Panel Date: August 26, 2024 Subject: Development Permit Application DP 09-23 Page 9 V. A signed and sealed pavement cut form (Form F-2 of the City’s DCM) shall be completed by the developer’s consulting engineer. Upon the review and approval of the City Engineer of the submitted form, the corresponding Permanent pavement cut reinstatement and degradation fees shall be paid by the Developer. NOTE: Deposits for utility services or connections are estimates only. The actual cost incurred for the work will be charged. The City will provide the developer with an estimate of connections costs, and the Developer will declare in writing that the estimate is acceptable. C) The Developer is required to adhere to the following conditions: I. The Developer’s Consulting Engineer shall perform their periodic Field Reviews, As required by EGBC, and send a copy of the Review to the City Engineer within a week of completion of each Review. II. Unless otherwise specified by the City Engineer, all engineering works shall be designed based on the City’s DCM specifications in accordance with the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126. III. Undergrounding of hydro, telecommunication to the development site is required, complete with underground or at-grade transformer. IV. Transformers servicing developments are to be located on private property with maintenance access located on private property. All transformers to be wrapped upon installation by the Developer. V. All survey costs and registration of documents with the Land Titles Office are the responsibility of the developer/owner. Please refer to the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 for more details. VI. An approved backflow prevention assembly must be installed on the domestic water connection immediately upon entering the building to provide premise isolation. VII. A complete set of record drawings (as-built) of off-site works, service record cards and a completed tangible capital asset form (TCA) all sealed by a Professional Engineer shall be submitted to the City within 60 days of the substantial completion date. Digital drawing files in .pdf and .dwg formats shall also be submitted. All the drawing submissions shall: a. Use City’s General Note Sheet and Title Block; and b. Closely follow the format and sequence outlined in the City’s DCM that will be provided to the Developer’s Consulting Engineer. VIII. Stormwater run-off generated on the site shall not impact adjacent properties, or roadways. --- page 72 --- To: Advisory Design Panel Date: August 26, 2024 Subject: Development Permit Application DP 09-23 Page 10 Fire Department Comments: Fire department access for the whole project was reviewed to ensure adequate access was in place to accommodate fire apparatus and personnel. The building is to be sprinklered as discussed. A construction fire safety plan shall be completed, and the building will require a lockbox, location to be determined in conjunction with the Fire Department at a later date. Advisory Design Panel: In accordance with Development Application Procedures Bylaw No. 3270, the subject Development Permit application will be reviewed by the Advisory Design Panel (ADP) at the September 11, 2024 meeting. According to the Council-approved ADP Terms of Reference, the ADP is to provide form and character and urban design-related advice and recommendations for Council’s consideration. ADP recommendations will be presented to Council through the ADP meeting minutes and, if applicable, through an additional City staff report, prior to Council consideration of the proposed Development Permit application. A copy of the ADP minutes will be presented to Langley City Council at a future Regular Council meeting. BUDGET IMPLICATIONS: In accordance with Bylaw No. 3256, the proposed development would contribute $25,100.00 to City Development Cost Charge accounts and $12,000.00 in Community Amenity Contributions. Prepared by: _______________________ Anton Metalnikov, RPP, MCIP Planner --- page 73 --- To: Advisory Design Panel Date: August 26, 2024 Subject: Development Permit Application DP 09-23 Page 11 Concurrence: _________________________ Roy M. Beddow, RPP, MCIP Deputy Director of Development Services Concurrence: _________________________ Carl Johannsen, RPP, MCIP Director of Development Services Concurrence: Concurrence: __________________________ __________________________ David Pollock, P. Eng . Scott Kennedy, Fire Chief Director of Engineering, Parks & Environment attachments --- page 74 --- To: Advisory Design Panel Date: August 26, 2024 Subject: Development Permit Application DP 09-23 Page 12 DEVELOPMENT PERMIT APPLICATION DP 09-23 Civic Address: 5135 208A Street Legal Description: Lot 233, District Lot 36, Group 2, New Westminster District, Plan 56744 Applicant: Dino Barbucci Owner: Dino Barbucci --- page 75 --- --- page 76 --- --- page 77 --- --- page 78 --- --- page 79 --- --- page 80 --- --- page 81 --- --- page 82 --- --- page 83 --- --- page 84 --- --- page 85 ---