Agenda - Advisory Design Panel Source: https://www.langleycity.ca/media/file/adp-agenda-october-16-2024 Archived copy: https://heylangley.ca/records/city-of-langley/committees/advisory-design-panel/2024/2024-10-16-agenda-adp-agenda-october-16-2024.pdf SHA-256 of the PDF: 524d21b0ca01f346db16d969d0923207acccd44e3403d93f409ad63fd12ddd87 Fetched: 2026-11-10 --- page 1 --- ADVISORY DESIGN PANEL WEDNESDAY, OCTOBER 16, 2024 AT 7:00 PM CKF Room Langley City Hall (In-Person Meeting) A G E N D A 1) AGENDA Adoption of the October 16, 2024 agenda. 2) MINUTES Adoption of minutes from the September 11, 2024 meeting. 3) DEVELOPMENT PERMIT APPLICATION DP 06-24 ZONING BYLAW AMENDMENT APPLICATION RZ 05-24 6-storey, 283-unit apartment building at 5360 204 Street. 4) DEVELOPMENT PERMIT APPLICATION DP 05-24 ZONING BYLAW AMENDMENT APPLICATION RZ 04-24 6-storey, 80-unit apartment building at 20130-20150 53 Avenue & 20139-20152 52 Avenue. 5) 2025 ADVISORY DESIGN PANEL MEMBERSHIP Notice that members will be contacted for interest in 2025 ADP membership. 6) NEXT MEETING November 6, 2024 (TBC). 7) ADJOURNMENT --- page 2 --- Document Number: 196961 MINUTES OF THE ADVISORY DESIGN PANEL HELD IN CKF ROOM, LANGLEY CITY HALL WEDNESDAY, SEPTEMBER 11, 2024 AT 7:02 PM Present: Councillor Paul Albrecht (Chair) Councillor Mike Solyom (Co-Chair) Mayor Nathan Pachal Tony Osborn Matt Hassett Leslie Koole Dammy Ogunseitan Ritti Suvilai Absent: Blair Arbuthnot Ella van Enter Jaswinder Gabri Staff: C. Johannsen, Director of Development Services K. Kenney, Corporate Officer A. Metalnikov, Planner Chair Albrecht began by acknowledging that the land on which we gather is on the traditional unceded territory of the Katzie, Kwantlen, Matsqui and Semiahmoo First Nations. 1) AGENDA Adoption of the September 11, 2024 agenda. It was MOVED and SECONDED THAT the agenda for the September 11, 2024 Advisory Design Panel be approved. CARRIED --- page 3 --- ADP Minutes – September 11, 2024 2 2) MINUTES Adoption of minutes from the July 18, 2024 meeting. It was MOVED and SECONDED THAT the minutes of the June 27, 2024 Advisory Design Panel meeting be approved as circulated. CARRIED 3) LANGLEY CITY CENTRE SKYTRAIN STATION SkyTrain station at 5710-5740 203 Street & 5673 203A Street. Mr. Metalnikov spoke to the staff report dated September 5, 2024 providing information on the proposed development. Mr. Johannsen provided further history and context regarding the project, responded to questions from Panel members regarding various elements of the station design, and noted next steps. It was noted that Panel members should limit their feedback to the form and character of the station design, and that the Province and design-build contractor South Fraser Station Partners (SFSP) are not bound by ADP Recommendations, given that the SkyTrain is a Provincial project that does not require municipal approvals. Further to this it was also noted that the Province and SFSP will, however, carefully consider comments from the ADP and City of Langley as outlined in the previously agreed Design Advisory Process (DAP). The following individuals entered the meeting via teleconference: • Aneela Atta, Transportation Investment Corporation (TIC) • Jeanne Lee, Transportation Investment Corporation (TIC) • Charlotte Zhao, Transportation Investment Corporation (TIC) • Judy Liu, Francl Architecture (for SFSP) • Jose Gonzalez, Francl Architecture (for SFSP) Judy Liu, the project architect, provided a PowerPoint presentation, with information on the following: • Station site and context; • Urban context and development; • Site plan; • Accessibility features; • North transit exchange rendering; • Station design; • Station materials and finishes; and • Elevation renderings. --- page 4 --- ADP Minutes – September 11, 2024 3 Jose Gonzalez, landscape architect, provided information on the landscape design with details on the following: • Illustrative landscape plan; • Site materials and finishes; and • Planting palette. Panel members provided feedback on the form and character of the station design and discussion took place with respect to the following: • Entry connection and flow through to commercial retail unit; • Stairwell security concerns; • Lack of pedestrian crosswalk at the northwest site bus access; • Consider providing more covered space for people waiting for buses in transit area to the north; • Potential for adding broad leafed trees to along walkways to station entrances in order to counter heat island effect; • Importance of having adequate lighting on throughout station even when trains not running; • Consider opportunities for public art installations at terminus; and • Consider using permeable pavers on walkways. The project team responded to questions from Panel members regarding the following: • Design of gender neutral washrooms; • Bike room storage location, capacity, amenities, and automatic entry; • Correcting rendering of stair design to show it is fully enclosed; • Lighting design inside and outside of station; • What area adjacent to the terminus of the line would look like; • Landscaping for area reserved for future bus charging electric vehicle infrastructure; • Location of transit exchange; • Whether the interior of station is air-conditioned; • Use of anti-graffiti panel system on exterior wall of power station to create more visual interest; • Use of transit-tested interlocking pavers for walkways; • Design takes into account anticipated ridership; and • Potential for station design to accommodate bus rapid transit and transit police office. The project team left the meeting. Staff responded to further questions from Panel members regarding the following: • Parking options; • Bus Rapid Transit location; and • Expansion of the SkyTrain line from terminus. --- page 5 --- ADP Minutes – September 11, 2024 4 It was MOVED and SECONDED THAT: 1. The ADP receive the staff report dated September 5, 2024 for information; and 2. The ADP recommends the applicant give further consideration to the following prior to the application proceeding to Council: a. Strengthen the engagement between the CRU, the station interior, and the southeast plaza (i.e. with additional glazing). b. Reconsider the location and design of the exit stair (e.g. moving it to the east side of the station) to avoid CPTED issues and improve access. c. Provide additional attention to the tail tracks to ensure they’re an integrated and attractive part of the overall station design, including with art. d. Incorporate automatic doors into the bike parkade. e. Confirm a pedestrian crosswalk will be provided over the northwest bus exchange entrance. f. Add more shade trees to the landscape plans, especially in line with the station entrance paving treatments. g. Enhance the appearance of the PPS (e.g. panelling shading and texture, art). h. Ensure durability and vandalism-resistance of project materials (e.g. unit pavers, walls). i. Ensure adequate lighting is provided throughout the entire station site and is kept on 24/7. j. Review plaza and landscaping design for rain water management and drainage (i.e. preventing pooling, ice build-up, etc.). CARRIED The meeting recessed at 8:36 pm and reconvened at 8:40 pm. --- page 6 --- ADP Minutes – September 11, 2024 5 4) DEVELOPMENT PERMIT APPLICATION DP 09-23 Triplex at 5135 208A Street. Anton Metalnikov, Planner introduced the project and provided context to the application. He further spoke to the staff report dated August 26, 2024 and provided a brief overview of the Development Permit application. Staff responded to questions from Panel members regarding the following: • Rationale as to why the ADP needs to review these types of applications; and • Whether the building was the applicant’s personal project or a commercial property. The Applicant team entered the meeting: • Dino Barbucci, Owner, Barbucci Construction • Constance Hedd, Designer, Outdoor Décor and Design • Ashley Zhou, Barbucci Construction • Mark Barlow, Owner, Method Design Group • Kevin Zhang, Barbucci Construction Mr. Barbucci provided a PowerPoint presentation on the proposed development, providing information on the following: • Building design and features; • landscaping; • soundproofing; • parking garages; • green oriented building features; • EV charging; • Site location; • Floor plan (basement floor); • Floor plan (main floor); • Floor plan (upper floor); • Our vision: o Affordable housing o Living experience • Privacy; • Material specifications; and • Location. Mr. Barlow advised the lower unit could be made adaptable and is a flexible space. Ms. Hedd provided details on the landscaping design as follows: • Outdoor parking spaces screened with low shrubs and hedging; • Use of similar plant materials as surrounding neighbourhood; and • Low maintenance gardens. --- page 7 --- ADP Minutes – September 11, 2024 6 Panel members provided feedback on the form and character of the development and discussion took place regarding the following: • Consider incorporating more wood into the design; • Differentiate pedestrian and vehicle areas on driveway; • Consider different design for interior stairs that eliminates open area under stairs; • Consider adding landscaping near exterior stairs to break up expanse of driveway; • Correct ground floor plan showing double doors; • Make main floor exterior more distinctive to reduce raised house feel; and • Ensure outdoor lighting is not a nuisance to neighbouring properties. Staff responded to a question from a Panel member regarding how this building design will integrate with other types of homes developed around it. The applicant team responded to questions from panel members regarding the following: • Rationale for location of walking path; • What the actual colour palette will look like; and • Type of fencing that will be provided along 208 th Street. The applicant team left the meeting. ADP members provided further feedback on the development as follows: • Consider more creative pattern with pavers. Staff responded to questions from Panel members regarding the following: • The intention of the developer to rent the units; • The ability, due to recent housing legislation, to have plex-home developments in cul-de-sac blocks; and • Addressing challenges that arise when developments such as this one front two streets. It was MOVED and SECONDED THAT: 1. The ADP receive the staff report dated August 26, 2024 for information; and 2. The ADP recommends the applicant give further consideration to the following prior to the application proceeding to Council: a. Reconfigure the path and backyard treatment to maintain privacy; b. Introduce more variety and an improved pedestrian experience in the driveway (e.g. greenery, surface treatment); c. Update the stairs in the plans for accuracy and CPTED (e.g. hiding spots) d. Strengthen the ground floor frontage (e.g. adding glazing); --- page 8 --- ADP Minutes – September 11, 2024 7 e. Ensure soffit lights do not create a nuisance for neighbours; f. Consider incorporating more wood into the elevations for warmth, especially on west; g. Ensure the design does not turn its back on 208 Street. CARRIED 5) NEXT MEETING October 2, 2024 6) ADJOURNMENT It was MOVED and SECONDED THAT the meeting adjourn at 9:23 pm. CARRIED __________________________________ ADVISORY DESIGN PANEL CHAIR __________________________________ CORPORATE OFFICER --- page 9 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject: Development Permit Application DP 0 6 - 24 Rezoning Application RZ 05-24 (5360 204 Street) File #: 6620.00 From: Anton Metalnikov, RPP, MCIP Planner Bylaw #: 3 294 Doc #: Date: October 4 , 2024 RECOMMENDATION: THAT this report be received for information. PURPOSE OF REPORT: To consider Development Permit and Zoning Bylaw amendment applications by 1337204 B.C. LTD. for a 6-storey, 283-unit apartment development at 5360 204 Street. POLICY: The subject property is currently zoned RM2 Multiple Residential Medium Density in Zoning Bylaw No. 2100 and designated “Mid Rise Residential” in the Official Community Plan Land Use map. The property is also located within the Nicomekl River District Neighbourhood Plan “Living Room” area. All lands designated for multi-unit residential use are subject to a Development Permit to address building form and character. The density of the proposed development complies with the Official Community Plan but exceeds the parameters in the current Zoning Bylaw. As such, a Comprehensive Development Zone is proposed to accommodate it. --- page 10 --- To: Advisory Design Panel Date: October 4, 2024 Subject: Development Permit Application DP 06-24 & Rezoning Application RZ 05-24 Page 2 COMMENTS/ANALYSIS: Background Information: Applicant: 1337204 B . C . LTD. Owner: 1337204 B.C. LTD. Civic Address: 5360 204 Street Legal Description: Lot 178, District Lot 36, Group 2, New Westminster District, Plan 53282 Site Area: 7,151.85 m 2 ( 1.77 acres) Number of Units: 283 apartments Gross Floor Area: 18,545.69 m 2 ( 199,62 5 ft 2 ) Floor Area Ratio: 2. 593 Lot Coverage: 46.9% Total Parking Required: 1 4 h/c spaces (Provincial Transit - Oriented Area) Parking Provided: Resident Visitor Total 302 spaces 46 spaces 348 spaces (including 22 h/c spaces) OCP Designation: Mid Rise Residential Existing Zoning: RM2 Multiple Residential Medium Density Proposed Zoning: CD103 Comprehensive Development Variances Requested: 5.5 m long h/c parking stalls (5.8 m min.) Development Cost Charges: $4,860,543.00 (City - $2,282,211.00, GVS&DD - $1,020,291.00, GVWD - $1,018,379.00, SD35 - $143,400.00, TransLink - $396,262.00) Community Amenity Contributions (CACs): $566,000.00 --- page 11 --- To: Advisory Design Panel Date: October 4, 2024 Subject: Development Permit Application DP 06-24 & Rezoning Application RZ 05-24 Page 3 Discussion: 1. Context The proposed development site consists of a single property currently hosting a 3-storey, 44-unit rental apartment building and is located in a residential area composed primarily of low-rise apartment buildings and townhome complexes. The owner of the property had initially submitted a development application in 2022 for a 12-storey, 370-unit apartment building on the same site, which received 3 rd Reading from Council in 2023, but has since updated the proposal to a 6-storey, 283-unit apartment building to be able to shift from steel to wood- frame construction for economic reasons. The revised design required updated Development Permit and rezoning applications to be submitted, while the original land use contract discharge application (submitted in conjunction with the original rezoning and Development Permit applications) remained in effect. This land use contract discharge application is now unnecessary due to the elimination of all land use contracts province-wide in accordance with Provincial law. Site context Douglas Park Community School 8-storey apartment building U/C McMillan Place Brighton Apartments Wheatcroft Manor Ridgewood Manor Countryside Estates Subject Site --- page 12 --- To: Advisory Design Panel Date: October 4, 2024 Subject: Development Permit Application DP 06-24 & Rezoning Application RZ 05-24 Page 4 The site’s sole frontage is formed on the west by 204 Street, a collector road across from which sit the 4-storey Brighton Apartments building and the McMillan Place townhome complex. The Countryside Estates apartment complex, composed of three separate 4-storey buildings, shares a treed property line on the subject property’s east and is buffered from it by a private drive lane on the south. On the north, the site is bounded by two 3-storey apartment buildings: Ridgewood Manor and Wheatcroft Manor. The site is well-positioned with connections to retail and service areas, with Downtown located with a few-minutes’ walk. It also benefits from proximity to key neighbourhood amenities, including: • Portage Park (5-minute walk); • Douglas Park Community School (5-minute walk); and • Timms Community Centre (5-to-10-minute walk). The site is also located near several transportation services, including: • Local transit lines (directly adjacent); • The Langley Centre transit exchange and the fifteen bus routes it serves, including the frequent 503 Fraser Highway Express (10-minute walk); and • The planned Langley City Centre SkyTrain station and its associated transit exchange (10-minute walk). 2. Proposed Rezoning and the Official Community Plan (OCP) The subject site is designated Mid Rise Residential in the City’s OCP, which allows for apartment development of up to 12 storeys in height and a Floor Area Ratio (FAR) of up to 3.5. The property is proposed to be rezoned to a site-specific Comprehensive Development (CD) Zone as no existing zones adequately accommodate the Mid Rise Residential designation. A new Zoning Bylaw is currently in development, and the project was designed to conform to the preliminary draft zoning regulations associated with this designation. Should the CD rezoning be adopted it is anticipated that, as part of adopting the new Zoning Bylaw, the City will rezone this site from its CD Zone to the new zone created to implement the Mid Rise Residential designation. The existing Pyramid Apartments building on site consists of 44 purpose-built rental units. Under Policy 1.16.1. of the City’s OCP, the proposed new development must replace any existing rental units at a minimum one-to-one ratio, with these replacement units secured by a Housing Agreement. The applicant has proposed to meet this requirement by including 53 rental units in the new development, with the Housing Agreement to secure the replacement units to be executed prior to the application proceeding to consideration of Final --- page 13 --- To: Advisory Design Panel Date: October 4, 2024 Subject: Development Permit Application DP 06-24 & Rezoning Application RZ 05-24 Page 5 Reading by Council. The other 230 units will be sold as condominiums. This approach supports OCP Policy 1.16.2., which encourages mixed-tenure (rental and strata) developments. 3. Tenant Relocation Plan As the current building on site contains purpose-built rental units, the applicant is undertaking a Tenant Relocation Plan, as required by Policy 1.18 ( Tenant Relocation Plans ) of the City’s OCP. As the site has continued to be subject to a development application, the applicant has continued to implement their Tenant Relocation Plan, including throughout the process of updating the proposal. The explanatory memo with additional details on the applicant’s efforts and communication with existing tenants that was previously provided to Council with the original concept remains relevant, and an updated explanatory memo will be provided when this updated application is considered by Council. The Provincial Residential Tenancy Act legislation also applies. 4. Design The applicant is proposing a near-perimeter block building that responds to this large square site near existing transit, the planned Langley City Centre SkyTrain station, and Downtown and maximizes density supporting these destinations within a wood-frame form. The building sits atop a two-level underground parkade which is partially extruded above ground due to geotechnical conditions and the property’s floodplain location. The extruded parkade wall is tiered with a step along the street frontage, clad with brick, and screened by landscaping to reduce the wall’s height against the sidewalk and soften its interface with the public realm. On the remaining three sides, the extruded parkade and podium level is painted to match the building’s colour scheme and set back at various points on the south and east sides to enable the preservation of existing trees on the neighbouring properties. The building wraps a courtyard with an opening near the site’s northwest to accommodate vehicle and pedestrian access to each building wing and a central parking area, provide adequate fire rescue vehicle travel paths, and create convenient loading and PMT service access. The dimensions of the interior courtyard, of approximately 30 metres north-south and 35 metres east-west, maintain light and air access into it and support the 10-12 metre minimum separation distance between low-rise apartment buildings identified in the OCP’s Development Permit Area guidelines. These minimum separation distances are also achieved with neighbouring buildings through the building’s siting nearer to the street and setbacks of 6 metres or more from its shared property lines. --- page 14 --- To: Advisory Design Panel Date: October 4, 2024 Subject: Development Permit Application DP 06-24 & Rezoning Application RZ 05-24 Page 6 The applicant has chosen to accommodate the rental-unit replacement requirement by separating the development into a strata wing, with its entrance facing 204 Street, and a rental wing, with its entrance on the interior courtyard and access to the street provided through an accessible and landscaped walkway. The architecture treats the development as a single cohesive building, with a brick base transitioning to light grey fibre cement panelling above. Thick white extruded frames rise and fall over the façade to help break the building’s massing up into narrower blocks, with this effect repeated through sections of vertical wood-tone striping. As with the brick base, the original design is referenced through the use of small light blue panels as an accent. The proposed landscaping uses various shrubs and grasses in a linear form to soften podium walls at and above grade, demarcate unit patios and exit paths, and highlight courtyard features. Larger planting areas, on the street frontage, the northeast corner, and within the courtyard, host dogwood, maple, and magnolia trees. The courtyard, which acts as an outdoor amenity area shared between both the strata and rental wings, connects to indoor amenities on all three sides and is programmed with cooking, dining, and children’s play space. The unit type distribution of the building includes 212 one-bedroom units, 65 two- bedroom units, and 6 three-bedroom units. 58 (20%) of the units are adaptable. Average unit sizes and the proportion of different unit types are comparable in both the strata and rental wings. Resident storage facilities are provided in common storage rooms on all residential floors. 992 m 2 (10,678 ft 2 ) of total amenity space is provided in the development. This includes 277 m 2 (2,983 ft 2 ) of indoor amenity space in the strata wing and 91 m 2 (983 ft 2 ) of indoor amenity space in the rental wing, which results in the rental wing having more indoor amenity space on a per-unit basis. Both wings share the 624 m 2 (6,719 ft 2 ) outdoor amenity courtyard. Three separate elevator cores serve the overall building, including two cores with three elevators in the strata wing and a single core and elevator in the rental wing. 5. Sustainability The proposal incorporates several sustainable development features, including: • Using construction techniques that minimize site disturbance and protect air quality; • Using lighting systems meeting ground-level and dark skies light pollution reduction principles; • Using non-water dependent materials in the landscape design served by an irrigation system with central control and rain sensors; • Using water-conserving toilets; and --- page 15 --- To: Advisory Design Panel Date: October 4, 2024 Subject: Development Permit Application DP 06-24 & Rezoning Application RZ 05-24 Page 7 • Providing 34 resident parking stalls with Level II electric vehicle (EV) chargers, with the remaining resident spaces pre-wired and visitor spaces pre-ducted for future installation. 6. CPTED The applicant’s proposal benefited from a comprehensive Crime Prevention Through Environmental Design (CPTED) review by a qualified consultant whose recommendations were incorporated into the plans. 7. Variances As noted above, the applicant’s proposed development is generally consistent with the draft 6-12 storey apartment building zoning regulations that are being considered for the new Zoning Bylaw to implement the Official Community Plan’s Mid Rise Residential land use designation. However, given the proponent has applied to redevelop the site prior to the adoption of the new Zoning Bylaw, a site-specific Comprehensive Development (CD) Zone is proposed to be created to accommodate the redevelopment. Despite the use of a CD Zone, the proposal requires a variance to reduce the length of accessible parking spaces from 5.8 metres to 5.5 metres. The 5.5 metre length is consistent with the City’s standard parking stall dimension requirements and, in a review of nearby municipalities (Langley Township, Surrey, Maple Ridge, and Abbotsford), found that all used the same stall length for both standard and accessible parking spaces. Staff are also considering making standard and accessible parking stall lengths consistent in the City’s upcoming new Zoning Bylaw. As such, staff support this variance. 8. Summary The proposed development is consistent with the City’s OCP and Development Permit Area guidelines for the area and presents a transit-supportive and efficient design providing housing in close proximity to parks, transit, and Downtown. Engineering Requirements: Since the original 12-storey concept, the applicant has been working through the City and its Engineering, Parks, & Environment Department’s process to meet the civil engineering requirements for the application. The civil design and associated materials are near-finalized and remain applicable to the updated 6- storey design. However, the initial engineering requirements have been provided below as additional information and context. --- page 16 --- To: Advisory Design Panel Date: October 4, 2024 Subject: Development Permit Application DP 06-24 & Rezoning Application RZ 05-24 Page 8 Additional design changes may be required upon further investigation, site inspections and receipt of other supporting reports and documents. All work to be done to the City of Langley’s Design Criteria Manual (DCM), and the City’s Subdivision and Development Servicing Bylaw (SDSB). Per the City’s DCM requirement, the developer and their consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Commitment by Owner and Consulting Engineer) prior to starting their design works. Per the City’s Watercourse Protection Bylaw No. 3152, the developer’s consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Confirmation of Commitment by Qualified Environmental Professional - QEP) prior to starting their site monitoring works. These requirements have been issued to reflect the application for development for a proposed 370 Unit Apartment Development located at 5360 204 St. These requirements may be subject to change upon receipt of a development application . The City’s Zoning Bylaw, 1996, #2100 has requirements concerning landscaping for buffer zonings, parking and loading areas, and garbage and recycling containers, all of which applies to this design. A) The Developer is responsible for the following work which shall be designed by a Professional Engineer: I. A Qualified Environmental Professional (QEP) must be engaged to implement erosion and sediment control in accordance with the City of Langley Watercourse Protection Bylaw #3152, as amended. II. As this project is located within the new designated floodplain for the Nicomekl River, the Flood Construction Level shall be calculated as per the City of Langley Floodplain Elevation Bylaw No. 2768 III. A storm water management plan for the site is required. Rainwater management measures used on site shall limit the release rate to pre- development levels to mitigate flooding and environmental impacts as detailed in the City’s DCM. All calculations shall be based the City’ DCM with 20% added to the tabulated readings to account for climate change. A safety factor of 20% shall be added to the calculated storage volume. Pre- development release rates shall not include climate change effect. IV. All existing services shall be capped at the main by the City, at the Developer’s expense prior to applying for a demolition permit. --- page 17 --- To: Advisory Design Panel Date: October 4, 2024 Subject: Development Permit Application DP 06-24 & Rezoning Application RZ 05-24 Page 9 V. New water, sanitary and storm sewer service connections are required. All pertinent pipe design calculations shall be submitted in spreadsheet format and shall include all formulas for review by the City. The Developer’s engineer will determine the appropriate main tie-in locations and size the connections for the necessary capacity. VI. The capacity of the existing water and sanitary sewer mains shall be assessed through hydraulic modeling performed by the City’s hydraulic modeling consultant at the Developer’s expense. a. Any upgrade requirement for either sanitary or water mains not covered under the City’s DCC bylaw shall be designed and installed by the Developer at the Developer’s expense. b. At the Developer’s expense, the City’s hydraulic modeling consultant shall conduct a fire hydrant flow test to be used in the City’s water modeling to determine if the existing water network is adequate for fire flows (based on architectural data supplied by the Developer’s Architect). Upgrading of the existing watermain(s) may be necessary to achieve the necessary pressure and flows to conform to Fire Underwriters Survey (FUS) “Water Supply for a Public Fire Protection, a Guide to Recommended Practice, 1995.” VII. Additional C71P fire hydrants may be required to meet bylaw and firefighting requirements. Hydrant locations must be approved by the City of Langley Fire Rescue Service. VIII. A 1.2m wide easement is required along the 204 Street frontage. IX. New sidewalk, bike path, barrier curb, gutter will be required along the entire project frontage, complete with boulevard trees and a planting strip, and appropriate curb bulges as per the City’s DCM x-section SS-R06 standard and section 11.0 - Specifications and Standards for Landscaping. X. A traffic impact assessment will be required as per the City’s DCM. The proposed terms of reference for the traffic study shall be submitted for review and approval. XI. The condition of the existing pavement along the proposed project’s frontages shall be assessed by a geotechnical engineer. Pavements shall be adequate for an expected road life of 20 years under the expected traffic conditions for the class of road. Road construction and asphalt overlay designs shall be based on the analysis of the results of Benkelman Beam tests and test holes carried out on the existing road which is to be upgraded. If the pavement is inadequate, it shall be remediated at the Developer’s expense. XII. The site layout shall be designed by a civil engineer to ensure that the parking and access layout meets minimum design standards, including setbacks from property lines. Appropriate turning templates should be used to prove parking stalls and drive-aisles are accessible by the design vehicle. XIII. Existing and proposed street lighting along the entire project frontage shall be reviewed by a qualified lighting consultant to ensure street lighting and --- page 18 --- To: Advisory Design Panel Date: October 4, 2024 Subject: Development Permit Application DP 06-24 & Rezoning Application RZ 05-24 Page 10 lighting levels meet the City’s DCM standards (SS-E03 in the updated DCM – DEC 2022). XIV. Eliminate the existing overhead BC Hydro/telecommunication infrastructure along the development’s 204 th St. frontage by replacing with underground infrastructure. XV. A dedicated on-site loading zone shall be provided by the developer. B) The Developer is required to deposit the following bonding and fees: I. The City will require a Security Deposit based on the estimated construction costs of installing civil works, as approved by the City Engineer. II. The City will require inspection and administration fees in accordance to the Subdivision Bylaw based on a percentage of the estimated construction costs, as per the City’s Subdivision and Development Servicing Bylaw 2021 #3126. III. A deposit for a storm, sanitary and water services is required, which will be determined by City staff after detailed civil engineering drawings are submitted, sealed by a Professional Engineer. IV. The City will require a $40,000 bond for the installation of a water meter to current City standards as per the DCM. V. A signed and sealed pavement cut form (Form F-2 of the City’s DCM) shall be completed by the developer’s consulting engineer. Upon the review and approval of the City Engineer of the submitted form, the corresponding Permanent pavement cut reinstatement and degradation fees shall be paid by the Developer. NOTE: Deposits for utility services or connections are estimates only. The actual cost incurred for the work will be charged. The City will provide the developer with an estimate of connections costs, and the Developer will declare in writing that the estimate is acceptable. C) The Developer is required to adhere to the following conditions: I. Unless otherwise specified by the City Engineer, all engineering works shall be designed based on the City’s DCM specifications in accordance with the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 (updates coming – Dec. 2022) II. Undergrounding of hydro, telecommunication to the development site is required, complete with underground or at-grade transformer III. Transformers servicing developments are to be located on private property with maintenance access located on private property. All transformers to be wrapped upon installation by the Developer. IV. All survey costs and registration of documents with the Land Titles Office are the responsibility of the developer/owner. Please refer to the City’s --- page 19 --- To: Advisory Design Panel Date: October 4, 2024 Subject: Development Permit Application DP 06-24 & Rezoning Application RZ 05-24 Page 11 Subdivision and Development Servicing Bylaw 2021, No. 3126 for more details. V. A water meter is required to be installed on private property, preferably in the mechanical room, in accordance to the City's DCM standards at the Developer's cost. VI. An approved backflow prevention assembly must be installed on the domestic water connection immediately upon entering the building to provide premise isolation. VII. A Stormceptor or equivalent oil separator is required to treat site surface drainage. VIII. A complete set of record drawings (as-built) of off-site works, service record cards and a completed tangible capital asset form (TCA) all sealed by a Professional Engineer shall be submitted to the City within 60 days of the substantial completion date. Digital drawing files in .pdf and .dwg formats shall also be submitted. All the drawing submissions shall: a. Use City’s General Note Sheet and Title Block; and b. Closely follow the format and sequence outlined in the City’s DCM that will be provided to the Developer’s Consulting Engineer. IX. The selection, location and spacing of street trees and landscaping are subject to the approval of the City Engineer. Please refer to the City’s DCM for more details. X. Stormwater run-off generated on the site shall not impact adjacent properties, or roadways. I. Garbage and recycling enclosures shall accommodate on the site and be designed to meet Metro Vancouver’s “Technical Specifications for Recycling and Garbage Amenities in Multi-family and Commercial Developments - June 2015 Update.” Please refer to the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 for more details.. Fire Department Comments: Fire department access for the whole project was reviewed to ensure adequate access was in place for apparatus and firefighters. A construction fire safety plan shall be completed, complete with crane inspection records. Ensure any crane on site is registered with the BC Construction Safety Alliance. A progressive standpipe installation will be required as construction rises. Standpipes will be required at the parkade entrance, and in elevator lobby at all parking levels. All garbage/recycling containers must be stored in a fire rated, sprinklered room, and must be of adequate size to prevent spillover into adjacent area. Stairwells must be constructed to accommodate shelter in place applications. Marked Exits must not be on a fob. Consideration will be given to the installation of power banks in the storage room lockers for e-bikes charging. A Fire Safety plan and FD lock box (knox box) will be required before occupancy. The 4” FDC will be --- page 20 --- To: Advisory Design Panel Date: October 4, 2024 Subject: Development Permit Application DP 06-24 & Rezoning Application RZ 05-24 Page 12 located on a pedestal detached from the front of the building, exact location to be discussed with the Fire Department at a later date. Advisory Design Panel: In accordance with Development Application Procedures Bylaw No. 2488, the subject Zoning Bylaw amendment and Development Permit application will be reviewed by the Advisory Design Panel (ADP) at the October 16, 2024 meeting. According to the Council-approved ADP Terms of Reference, the ADP is to provide form and character and urban design-related advice and recommendations for Council’s consideration. ADP recommendations will be presented to Council through the ADP meeting minutes and, if applicable, through an additional City staff report, prior to Council consideration of the proposed Zoning Bylaw amendment and Development Permit Applications. A copy of the ADP minutes will be presented to Langley City Council at a future Regular Council meeting. BUDGET IMPLICATIONS: In accordance with Bylaw No. 2482, the proposed development would contribute $2,282,211.00 to City Development Cost Charge accounts and $566,000.00 in Community Amenity Contributions. --- page 21 --- To: Advisory Design Panel Date: October 4, 2024 Subject: Development Permit Application DP 06-24 & Rezoning Application RZ 05-24 Page 13 Prepared by: _______________________ Anton Metalnikov, RPP, MCIP Planner Concurrence: __________________________ Roy M. Beddow, RPP, MCIP Deputy Director of Development Services Concurrence: _______________________ Carl Johannsen, RPP, MCIP Director of Development Services Concurrence: Concurrence: __________________________ __________________________ David Pollock, P.Eng. Scott Kennedy, Fire Chief Director of Engineering, Parks, & Environment Attachments --- page 22 --- To: Advisory Design Panel Date: October 4, 2024 Subject: Development Permit Application DP 06-24 & Rezoning Application RZ 05-24 Page 14 DEVELOPMENT PERMIT APPLICATION DP 06-24 REZONING APPLICATION RZ 05-24 Civic Addresses: 5360 204 Street Legal Description: Lot 178, District Lot 36, Group 2, New Westminster District, Plan 53282 Applicant: 1337204 B.C. LTD. Owner: 1337204 B.C. LTD. --- page 23 --- --- page 24 --- --- page 25 --- --- page 26 --- --- page 27 --- --- page 28 --- --- page 29 --- --- page 30 --- --- page 31 --- --- page 32 --- --- page 33 --- --- page 34 --- --- page 35 --- --- page 36 --- --- page 37 --- --- page 38 --- --- page 39 --- --- page 40 --- --- page 41 --- --- page 42 --- --- page 43 --- --- page 44 --- --- page 45 --- --- page 46 --- --- page 47 --- --- page 48 --- --- page 49 --- --- page 50 --- --- page 51 --- --- page 52 --- --- page 53 --- --- page 54 --- --- page 55 --- --- page 56 --- --- page 57 --- --- page 58 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject: Development Permit Application DP 0 5 - 24 Rezoning Application RZ 04-24 (20130-20150 53 Avenue & 20139-20152 52 Avenue) File #: 6620.00 From: Anton Metalnikov, RPP, MCIP Planner Bylaw #: 3293 Doc #: Date: October 3 , 2024 RECOMMENDATION: THAT this report be received for information. PURPOSE OF REPORT: To consider Development Permit and Zoning Bylaw amendment applications by T.M. Crest Homes (2022) Ltd. for a 6-storey, 80-unit apartment development at 20130-20150 53 Avenue & 20139-20152 52 Avenue. POLICY: The subject properties are currently zoned RS1 Single Family Residential in Zoning Bylaw No. 2100 and designated “Low Rise Residential” in the Official Community Plan Land Use map. The properties are also located within the Nicomekl River District Neighbourhood Plan “Sun Room” area. All lands designated for multi-unit residential use are subject to a Development Permit to address building form and character. The density of the proposed development complies with the Official Community Plan but exceeds the parameters in the current Zoning Bylaw. As such, a Comprehensive Development Zone is proposed to accommodate it. --- page 59 --- To: Advisory Design Panel Date: October 3, 2024 Subject: Development Permit Application DP 05-24 & Rezoning Application RZ 04-24 Page 2 COMMENTS/ANALYSIS: Background Information: Applicant: T.M. Crest Homes (2022) Ltd. Owner: T.M. Crest Homes (2022) Ltd. Civic Addresses: 20130 - 20150 53 Avenue & 20139 - 20152 52 Avenue Legal Description: Lot s 428 - 4 30 , District Lot 305, Group 2, New Westminster District, Plan 50423; & Lots 256-258, District Lot 305, Group 2, New Westminster District, Plan 42228 Site Area: 3,406.4 m 2 (0.842 acres) Number of Units: 80 apartments Gross Floor Area: 6,979 m 2 (75,121 ft 2 ) Floor Area Ratio: 2.049 Lot Coverage: 48% Total Parking Required: 119 spaces (including 6 h/c spaces) *RM3 requirement Parking Provided: Resident Visitor Total 96 spaces 16 spaces 112 spaces (including 6 h/c spaces) OCP Designation: Low Rise Residential Existing Zoning: RS1 Single Family Residential Proposed Zoning: CD102 Comprehensive Development Variances Requested: 5.5 m accessible stall length (min. 5.8 m) 0.3 m additional stall width near walls (min. 0.6 m) Note a resident parking variance is not required due to the use of CD Zone – see staff commentary in Variances section of this report for further details and rationale Development Cost Charges: $ 2,186,502.00 (City - $ 1,426,302 .00 , GVS&DD - $303,996.00, GVWD - $300,728.00, SD35 - $42,000.00, TransLink - $113,476.00) Community Amenity Contributions (CACs): $320,000.00 --- page 60 --- To: Advisory Design Panel Date: October 3, 2024 Subject: Development Permit Application DP 05-24 & Rezoning Application RZ 04-24 Page 3 Discussion: 1. Context The applicant is proposing to develop a 6-storey, 80-unit apartment building on a site consisting of six single detached home properties. The site is in a residential area transitioning to higher densities, with several apartment buildings recently completed, under construction, or in the application process. The site has two frontages, including 52 Avenue, a local road, to the south, and 53 Avenue, an arterial street, to the north, across from which a 5-storey apartment building is currently under construction. On its east side, the site is neighboured by Kensington Court, a 3-storey townhome complex completed in 2005. Single-detached properties sit on the other two sides of the site, with those to the west having themselves been the subject of land assembly and development interest. Nicomekl Elementary School is located immediately beside these properties and connects to 52 Avenue, and the subject site, with a mid-block pathway. The school will be connected by a new crosswalk across 53 Avenue in the future, leading to a new mid-block greenway. Site context Subject Site Fourplex application Nicomekl Elementary Future greenway 5 - storey apartment building approved 6-storey apartment building U/C 6-storey apartment building application 5-storey apartment building application 5-storey apartment building U/C 6-storey apartment building approved --- page 61 --- To: Advisory Design Panel Date: October 3, 2024 Subject: Development Permit Application DP 05-24 & Rezoning Application RZ 04-24 Page 4 The site is well positioned with connections to retail and service areas, with Downtown located within a 10-minute walk. It also benefits from proximity to key neighbourhood amenities, including: • Nicomekl Elementary School (<5-minute walk); • Nicomekl floodplain trail network (<5-minute walk); • Linwood Park (5-to-10-minute walk); and • Timms Community Centre (15-minute walk). The site is also located near several transportation services, including: • Three bus lines (<5-minute walk); • The frequent service 503 Fraser Highway Express bus (15-minute walk); and • The planned Langley City Centre SkyTrain station and its associated transit exchange (15-minute walk). 2. Proposed Rezoning and the Official Community Plan (OCP) The site is designated Low Rise Residential in the City’s OCP, which allows for apartment development of up to 6 storeys in height and a Floor Area Ratio (FAR) of up to 2.1. The subject properties are proposed to be rezoned to a site-specific Comprehensive Development (CD) Zone as no existing zones adequately accommodate the Low Rise Residential designation. A new Zoning Bylaw is currently in development and the project was designed to conform to the preliminary draft zoning regulations associated with this designation. Should the CD rezoning be adopted it is anticipated that, as part of adopting the new Zoning Bylaw, the City will rezone this site from its CD Zone to the new zone created to implement the Low Rise Residential designation. 3. Design The applicant is proposing a wood-frame L-shaped building that orients its 6- storey massing east-west to its 53 Avenue frontage and steps down to a 5-storey height on the north-south portion running parallel to the neighbouring townhome complex, with these townhomes also primarily oriented north-south with their entrances and primary windows. Equally prominent building entrances are provided on both frontages, with the vehicle access taken off 52 Avenue. This access splits on-site to an underground resident parking level and an at-grade parking level hosting both visitor and resident parking spaces. Both the underground and at-grade resident parking areas are fully secured. In addition to being hidden from view by the entrance lobbies on the north and south, the at- grade parking area is screened to the east by a single-loaded apartment corridor. The underground parking level is extruded above grade due to geotechnical --- page 62 --- To: Advisory Design Panel Date: October 3, 2024 Subject: Development Permit Application DP 05-24 & Rezoning Application RZ 04-24 Page 5 conditions, and is softened on the street frontages with tiered landscaping, and with a landscaped setback on the east side beside the neighbouring townhomes. On the upper floors, the building transitions to a double-loaded configuration, with the second floor hosting indoor amenity rooms which connect to an outdoor amenity courtyard covering the rest of the parking and service space below. The building emphasizes a 2-storey base with a grey brick finish that transitions to lighter off-white cementitious panelling on the floors above. Darker wood grain cementitious siding runs vertically between the base and cornice line to break up these primary materials while also tying them together. Lighter wood tone soffits provide an additional warmer accent. The parkade entrance and service area is treated with the same brick and cementitious panelling, windows, and landscaping to soften its appearance from the 52 Avenue cul-de-sac. The landscaping wraps the site’s perimeter with a variety of shrubs and grasses to soften the tiered parkade walls along both frontages and to setback and screen the extruded parkade wall on the east from the neighbouring townhome complex. This edge landscaping makes use of larger planting areas to host various trees, including a row of vine maples along the east interior lot line, for a total of 19 proposed trees. Low-lying plantings also line the outside of the outdoor amenity area and separate unit patios from each other on the ground floor and from the outdoor amenity area on the second floor. The amenity area hosts a hardscaped dining and lounge area flanked by grass lawns with resident garden plots. The unit type distribution of the building includes 45 one-bedroom units, 30 two- bedroom units, and 5 three-bedroom units. 16 (20%) of the units are adaptable. Resident storage facilities are provided in storage rooms in both parkade levels. 531.7 m 2 (5,723 ft 2 ) of total amenity space is provided, including 205.3 m 2 (2,210 ft 2 ) of indoor amenity space and 326.4 m 2 (3,513 ft 2 ) of outdoor amenity space. Two separate elevator cores (one at each entrance lobby) service the building. 4. Sustainability The proposal incorporates several sustainable development features, including: • Using construction techniques that minimize site disturbance and protect air quality; • Using lighting systems meeting ground-level and dark skies light pollution reduction principles; • Incorporating a construction recycling plan; • Reducing the heat island effect by use of landscaping and a courtyard amenity area covering surface parking; • Using non-water dependent and drought-tolerant materials in the landscape design served by an irrigation system with central control and rain sensors; --- page 63 --- To: Advisory Design Panel Date: October 3, 2024 Subject: Development Permit Application DP 05-24 & Rezoning Application RZ 04-24 Page 6 • Using water-conserving toilets; • Providing 11 resident parking stalls with Level II electric vehicle (EV) chargers, with the remaining resident spaces pre-wired and visitor spaces pre-ducted for future installation; and • Providing resident garden plots. 5. CPTED The applicant’s proposal benefited from a comprehensive Crime Prevention Through Environmental Design (CPTED) review by a qualified consultant whose recommendations were incorporated into the plans. 6. Variances As noted above, the applicant’s proposed development is generally consistent with the draft 4-6 storey apartment building zoning regulations that are being considered for the new Zoning Bylaw to implement the Official Community Plan’s Low Rise Residential land use designation. However, given the proponent has applied to redevelop the site prior to the adoption of the new Zoning Bylaw, a site-specific Comprehensive Development (CD) Zone is proposed to be created to accommodate the redevelopment. Despite the use of a CD Zone, the proposal requires variances from general Zoning Bylaw provisions to reduce the length of accessible parking spaces and reduce the space between parking spaces and walls. Staff support these variances per the rationales below. The accessible parking space variance requested is to reduce their length from 5.8 metres to 5.5 metres. The 5.5 metre length is consistent with the City’s standard parking stall dimension requirements and a review of nearby municipalities (Langley Township, Surrey, Maple Ridge, and Abbotsford) found that all used the same stall length for both standard and accessible parking spaces. Staff are also considering making standard and accessible parking stall lengths consistent in the City’s upcoming new Zoning Bylaw. The variance for the distance between parking spaces and walls is requested to reduce the width from 0.6 metres to a minimum of 0.3 metres. Staff note the Township of Langley, Coquitlam, Richmond and Surrey all permit the distance between parking spaces and parkade walls to be as low as 0.3 metres. This proposed variance is considered to be minor and is under consideration for inclusion in the upcoming new Zoning Bylaw. --- page 64 --- To: Advisory Design Panel Date: October 3, 2024 Subject: Development Permit Application DP 05-24 & Rezoning Application RZ 04-24 Page 7 Proposed Parking If the current Zoning Bylaw requirement for a similar type of building (i.e. RM3 Zone) was applied to this application, the applicant’s proposed overall parking amount is 5.9% less than what would be required. Given that a CD zone is being proposed for this development, technically only the previous dimension-related variances are required. However, it is important to note that staff support the applicant’s overall parking approach, as the proposal (less 7 spaces or 5.9%) meets the rates under preliminary consideration for the new Zoning Bylaw. These rates are being contemplated based on research work conducted by the City’s Zoning Bylaw update consultant and staff to date, which has included a review of the Metro Vancouver Parking Study as well as of parking rate requirements in other municipalities within the Lower Mainland. If the preliminary rates being considered for the draft new Zoning Bylaw were applied to this application, 112 parking spaces would be required, based on rates of 1.1 spaces per 1-bedroom unit, 1.3 spaces per 2-bedroom unit, 1.5 spaces per 3-bedroom unit (=96 resident spaces), and 0.2 visitor spaces per unit (=16 visitor spaces). This total is equal to the proposed parking amount of 112 spaces, which includes 16 visitor spaces, and is 45.9% less than the current RM3 Zone requirement of 119 spaces, which is based on rates of 1.2 spaces per 1-bedroom unit, 1.3 spaces per 2-bedroom unit, 2.0 spaces per 3-bedroom unit (=103 resident spaces) and 0.2 visitor spaces per unit (=16 visitor spaces). Greater variances have recently been approved by Council in the nearby area at 20191 53A Avenue (13% reduction), 20145 53 Avenue (13.2% reduction), and 20142 53A Avenue (14.5% reduction). Based on the above commentary and analysis, staff support these variances. 7. Summary The proposed development is consistent with the City’s OCP and Development Permit Area guidelines for the area and presents an efficient and compatible design providing housing in close proximity to parks, transit, and Downtown. Engineering Requirements: Additional design changes may be required upon further investigation, site inspections and receipt of other supporting reports and documents. All work to be done to the City of Langley’s Design Criteria Manual (DCM), and the City’s Subdivision and Development Servicing Bylaw (SDSB). Per the City’s DCM requirement, the developer and their consulting engineer shall submit to the City Engineer a signed and sealed copy of --- page 65 --- To: Advisory Design Panel Date: October 3, 2024 Subject: Development Permit Application DP 05-24 & Rezoning Application RZ 04-24 Page 8 Form F-1 (Commitment by Owner and Consulting Engineer) prior to starting their design works. Per the City’s Watercourse Protection Bylaw No. 3152, the developer’s consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Confirmation of Commitment by Qualified Environmental Professional - QEP) prior to starting their site monitoring works. These requirements have been issued to reflect the application for development for a proposed 80-unit Apartment Development, located at 20130-50 53 Ave; 20139-53 52 Ave. These requirements may be subject to change upon receipt of a development application. The City’s Zoning Bylaw, 1996, #2100 has requirements concerning landscaping for buffer zonings, parking and loading areas, and garbage and recycling containers, all of which applies to this design. A) The Developer is responsible for the following work which shall be designed by a Professional Engineer: I. A Qualified Environmental Professional (QEP) must be engaged to implement erosion and sediment control in accordance with the City of Langley Watercourse Protection Bylaw #3152, as amended. II. A storm water management plan for the site is required. Rainwater management measures used on site shall limit the release rate to pre- development levels to mitigate flooding and environmental impacts as detailed in the City’s DCM. All calculations shall be based the City’ DCM with 20% added to the calculated results to account for climate change. A safety factor of 20% shall be added to the calculated storage volume. Pre- development release rates shall not include climate change effect. III. All existing services shall be capped at the main by the City, at the Developer’s expense prior to applying for a demolition permit. IV. New water, sanitary and storm sewer service connections are required. All pertinent pipe design calculations shall be submitted in spreadsheet format and shall include all formulas for review by the City. The Developer’s engineer will determine the appropriate main tie-in locations and size the connections for the necessary capacity.. V. At the Developer’s expense, the capacity of the existing water and sanitary sewer mains shall be assessed through hydraulic modeling performed by the City’s standing hydraulic modeling consultant per DCM 3.8 and 6.5. a. Any upgrade requirement for either sanitary or water mains not covered under the City’s DCC bylaw shall be designed and installed by the Developer at the Developer’s expense. --- page 66 --- To: Advisory Design Panel Date: October 3, 2024 Subject: Development Permit Application DP 05-24 & Rezoning Application RZ 04-24 Page 9 b. At the Developer’s expense, the City’s standing hydraulic modeling consultant shall conduct a fire hydrant flow test to be used in the City’s water modeling to determine if the existing water network is adequate for fire flows (based on architectural data supplied by the Developer’s Architect). Upgrading of the existing watermain(s) may be necessary to achieve the necessary pressure and flows to conform to Fire Underwriters Survey (FUS) “Water Supply for a Public Fire Protection, a Guide to Recommended Practice, 1995.” VI. Additional C71P fire hydrants may be required to meet bylaw and firefighting requirements. Hydrant locations must be per DCM Section 3.10 and approved by the City Engineer and the City of Langley Fire Rescue Service. VII. A property dedication of approximately 2.6m will be required along the 53 Ave. Frontage of the proposed development to provide an ultimate ROW of 25m to be determined by a legal surveyor. No dedication requirement for 52 Ave. VIII. At the Developer's expense, a Traffic Impact Assessment (TIA) will be completed per the DCM Section 8.21. The proposed development plan and statistics, once ready, should be forwarded to the City Engineer along with the proposed terms of reference for the traffic study. TIA reports must be approved by the City Engineer prior to taking the application to Council. The TIA completion timing must be: a. For OCP Amendment / Rezoning Applications: Prior to Council’s first and second readings; and b. For Development Permits (DP): Prior to Council consideration of the application. IX. The scope and extent of the off-site works be determined in part from the TIA. New sidewalk, barrier curb, gutter will be required along the entire 52 & 53 Ave, frontages, complete with boulevard trees and a planting strip as per the City DCM cross-section SS-R07 for 52 Ave; City concept, details to be provided for 53 Ave. and Section 11.0 - Specifications and Standards for Landscaping. X. The condition of the existing pavement along the proposed project’s frontages shall be assessed by a geotechnical engineer. Pavements shall be adequate for an expected road life of 20 years under the expected traffic conditions for the class of road. Road construction and asphalt overlay designs shall be based on the analysis of the results of Benkelman Beam tests and test holes carried out on the existing road which is to be upgraded. If the pavement is inadequate, it shall be remediated by the Developer, at the Developer’s expense. XI. The site layout shall be reviewed by a qualified Professional Engineer to ensure that the parking layout, vehicle circulation, turning paths and access design meet applicable standards and sightline requirements, including setbacks from property lines. Appropriate turning templates should be used to prove parking stalls, loading areas and drive aisles are accessible by --- page 67 --- To: Advisory Design Panel Date: October 3, 2024 Subject: Development Permit Application DP 05-24 & Rezoning Application RZ 04-24 Page 10 service vehicles. Refer to DCM Section 8. The design shall be adequate for MSU trucks as the design vehicle. XII. Existing street lighting along the entire project frontage shall be analyzed (excluding any BC Hydro lease lights) by a qualified electrical consultant to ensure street lighting and lighting levels meet the criteria outlined in DCM 9.0. Any required street lighting upgrades, relocation, and/or replacement shall be done by the Developer at the Developer’s expense. Any existing BC Hydro lease-lights to be removed and disposed of off-site. XIII. A dedicated on-site loading zone shall be provided by the developer. The design shall be adequate for MSU trucks as the design vehicle. B) The Developer is required to deposit the following bonding and fees: I. The City will require a Security Deposit based on the estimated construction costs of installing civil works, as approved by the City Engineer. II. The City will require inspection and administration fees in accordance to the Subdivision Bylaw based on a percentage of the estimated construction costs, as per the City’s Subdivision and Development Servicing Bylaw 2021 #3126. III. A deposit for a storm, sanitary and water services is required, which will be determined by City staff after detailed civil engineering drawings are submitted, sealed by a Professional Engineer. IV. The City will require a $40,000 bond for the installation of a water meter to current City standards as per the DCM. V. A signed and sealed pavement cut form (Form F-2 of the City’s DCM) shall be completed by the developer’s consulting engineer. Upon the review and approval of the City Engineer of the submitted form, the corresponding Permanent pavement cut reinstatement and degradation fees shall be paid by the Developer. NOTE: Deposits for utility services or connections are estimates only. The actual cost incurred for the work will be charged. The City will provide the developer with an estimate of connections costs, and the Developer will declare in writing that the estimate is acceptable. C) The Developer is required to adhere to the following conditions: I. The Developer’s Consulting Engineer shall perform their periodic Field Reviews, As required by EGBC, and send a copy of the Review to the City Engineer within a week of completion of each Review II. Unless otherwise specified by the City Engineer, all engineering works shall be designed based on the City’s DCM specifications in accordance with the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 --- page 68 --- To: Advisory Design Panel Date: October 3, 2024 Subject: Development Permit Application DP 05-24 & Rezoning Application RZ 04-24 Page 11 III. Undergrounding of hydro, telecommunication to the development site is required, complete with underground or at-grade transformer IV. Transformers servicing developments are to be located on private property with maintenance access located on private property. All transformers to be wrapped upon installation by the Developer. V. All survey costs and registration of documents with the Land Titles Office are the responsibility of the developer/owner. Please refer to the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 for more details. VI. A water meter is required to be installed on private property, preferably in the mechanical room, in accordance to the City's DCM standards at the Developer's cost. VII. An approved backflow prevention assembly must be installed on the domestic water connection immediately upon entering the building to provide premise isolation. VIII. A Stormceptor or equivalent oil separator is required to treat site surface drainage. IX. A complete set of record drawings (as-built) of off-site works, service record cards and a completed tangible capital asset form (TCA) all sealed by a Professional Engineer shall be submitted to the City within 60 days of the substantial completion date. Digital drawing files in .pdf and .dwg formats shall also be submitted. All the drawing submissions shall: a. Use City’s General Note Sheet and Title Block; and b. Closely follow the format and sequence outlined in the City’s DCM that will be provided to the Developer’s Consulting Engineer. X. The selection, location and spacing of street trees and landscaping are subject to the approval of the City Engineer. Please refer to the City’s DCM for more details. XI. Stormwater run-off generated on the site shall not impact adjacent properties, or roadways. XII. Garbage and recycling enclosures shall accommodate on the site and be designed to meet Metro Vancouver’s “Technical Specifications for Recycling and Garbage Amenities in Multi-family and Commercial Developments - June 2015 Update.” Please refer to the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 for more details. Fire Department Comments: Fire department access for the whole project was reviewed to ensure adequate access was in place for apparatus and firefighters. A construction fire safety plan shall be completed, complete with crane inspection records. Ensure any crane on site is registered with the BC Construction Safety Alliance. A progressive standpipe installation will be required as construction rises. Standpipes will be required at the parkade entrance, and in elevator lobby. All garbage/recycling --- page 69 --- To: Advisory Design Panel Date: October 3, 2024 Subject: Development Permit Application DP 05-24 & Rezoning Application RZ 04-24 Page 12 containers must be stored in a fire rated, sprinklered room, and must be of adequate size to prevent spillover into adjacent area. Stairwells must be constructed to accommodate shelter in place applications. Marked Exits must not be on a fob. Consideration will be given to the installation of power banks in the storage room lockers for e-bikes charging. A Fire Safety plan and FD lock box (knox box) will be required before occupancy. The 4” FDC will be located on a pedestal detached from the front of the building, exact location to be discussed with the Fire Department at a later date. A Radio Amplification Bylaw is being developed by the City of Langley, although not currently adopted, preparation for this should be given consideration. Advisory Design Panel: In accordance with Development Application Procedures Bylaw No. 2488, the subject Zoning Bylaw amendment and Development Permit application will be reviewed by the Advisory Design Panel (ADP) at the October 16, 2024 meeting. According to the Council-approved ADP Terms of Reference, the ADP is to provide form and character and urban design-related advice and recommendations for Council’s consideration. ADP recommendations will be presented to Council through the ADP meeting minutes and, if applicable, through an additional City staff report, prior to Council consideration of the proposed Zoning Bylaw amendment and Development Permit Applications. A copy of the ADP minutes will be presented to Langley City Council at a future Regular Council meeting. BUDGET IMPLICATIONS: In accordance with Bylaw No. 3256 and the City’s Amenity Contributions Policy, the proposed development would contribute $1,426,302.00 to City Development Cost Charge accounts and $320,000.00 in Community Amenity Contributions. --- page 70 --- To: Advisory Design Panel Date: October 3, 2024 Subject: Development Permit Application DP 05-24 & Rezoning Application RZ 04-24 Page 13 Prepared by: _______________________ Anton Metalnikov, RPP, MCIP Planner Concurrence: __________________________ Roy M. Beddow, RPP, MCIP Deputy Director of Development Services Concurrence: _______________________ Carl Johannsen, RPP, MCIP Director of Development Services Concurrence: Concurrence: __________________________ __________________________ David Pollock, P.Eng. Scott Kennedy, Fire Chief Director of Engineering, Parks, & Environment Attachments --- page 71 --- To: Advisory Design Panel Date: October 3, 2024 Subject: Development Permit Application DP 05-24 & Rezoning Application RZ 04-24 Page 14 DEVELOPMENT PERMIT APPLICATION DP 05-24 REZONING APPLICATION RZ 04-24 Civic Addresses: 20130-20150 53 Avenue & 20139-20152 52 Avenue Legal Description: Lots 428-430, District Lot 305, Group 2, New Westminster District, Plan 50423; & Lots 256-258, District Lot 305, Group 2, New Westminster District, Plan 42228 Applicant: T.M. Crest Homes (2022) Ltd. Owner: T.M. Crest Homes (2022) Ltd. --- page 72 --- --- page 73 --- --- page 74 --- --- page 75 --- --- page 76 --- --- page 77 --- --- page 78 --- --- page 79 --- --- page 80 --- --- page 81 --- --- page 82 --- --- page 83 --- --- page 84 --- --- page 85 --- --- page 86 --- --- page 87 --- --- page 88 --- --- page 89 --- --- page 90 --- --- page 91 --- --- page 92 --- --- page 93 --- --- page 94 --- --- page 95 --- --- page 96 --- --- page 97 ---