Agenda - Advisory Design Panel Source: https://www.langleycity.ca/media/file/adp-package-january-29-2025rpdf Archived copy: https://heylangley.ca/records/city-of-langley/committees/advisory-design-panel/2025/2025-01-29-agenda-adp-package-january-29-2025rpdf.pdf SHA-256 of the PDF: 52b8b83d516604e0ea5cf18af6a9f2a506fc7aa4da878e5a7fbd8a0bba392d2e Fetched: 2026-11-10 --- page 1 --- ADVISORY DESIGN PANEL WEDNESDAY, JANUARY 29, 2025 AT 7:00 PM Council Chambers Langley City Hall (In-Person Meeting) U P D A T E D A G E N D A 1) AGENDA Adoption of the January 29, 2025 agenda. 2) MINUTES Adoption of minutes from the January 15, 2025 meeting. 3) INFORMATION UPDATE: DEVELOPMENT PERMIT APPLICATION DP 08-23 ZONING BYLAW AMENDMENT APPLICATION RZ 07-23 20625 Eastleigh Crescent. 4) DEVELOPMENT PERMIT APPLICATION DP 13-24 ZONING BYLAW AMENDMENT APPLICATION RZ 09-24 OCP AMENDMENT APPLICATION OCP 01-24 19991 49 Avenue, 19990 50 Avenue, and 4951-4975 & 4991 200 Street. 5) DEVELOPMENT PERMIT APPLICATION DP 11-24 20501 Logan Avenue. 6) NEXT MEETING To be confirmed. 7) ADJOURNMENT --- page 2 --- Document Number: 199150 MINUTES OF THE ADVISORY DESIGN PANEL HELD IN CKF ROOM, LANGLEY CITY HALL WEDNESDAY, JANUARY 15, 2025 AT 7:04 PM Present: Councillor Paul Albrecht (Chair) Councillor Mike Solyom (Co-Chair) Himanshu Chopra Melissa Coderre Jaswinder Gabri Matt Hassett Leslie Koole Tracey Macatangay Absent: Tana McNicol Samantha Stroman Ritti Suvilai Staff: C. Johannsen, Director of Development Services K. Kenney, Corporate Officer Chair Albrecht began by acknowledging that the land on which we gather is on the traditional unceded territory of the Katzie, Kwantlen, Matsqui and Semiahmoo First Nations. 1) AGENDA Adoption of the January 15, 2025 agenda It was MOVED and SECONDED THAT the January 15, 2025 agenda be adopted as circulated. CARRIED --- page 3 --- ADP Minutes – January 15, 2025 2 2) MINUTES Adoption of minutes from the December 11, 2024 meeting It was MOVED and SECONDED THAT the minutes of the December 11, 2024 Advisory Design Panel meeting be approved as circulated. CARRIED 3) ADVISORY DESIGN PANEL INTRODUCTION & ORIENTATION Welcome and brief orientation and review of ADP Terms of Reference. Mr. Johannsen provided an overview of the ADP process. Ms. Kenney provided an orientation on meeting procedures. Councillor Albrecht provided further information and guidance on procedures for the benefit of new members. 4) DEVELOPMENT PERMIT APPLICATION DP 09-24 ZONING BYLAW AMENDMENT APPLICATION RZ 08-24 5080 & 5096 208 Street Mr. Johannsen spoke to the staff report dated January 6, 2025 providing information on the proposed development. Staff responded to questions from Panel members regarding: • Differences in the old and new building design; • Potential lane connection to two neighbouring undeveloped lots; • Larger setbacks required between the subject building and neighbouring lots; • Requirement for cross access easements; • Review of plan by Fire Department • Maneuverability of garbage trucks through the development • Possibility of expanding internal apron. The Applicant team entered the meeting: Rajinder Warraich, Principle, Founder, Architect, AIBC Akshay Chatterji, BIM Manager, AIBC Caelan Griffiths, Landscape Architect, PMG Landscape Architects --- page 4 --- ADP Minutes – January 15, 2025 3 Mr. Warraich provided a PowerPoint presentation on the proposed development, providing information on the following: • Site context; • Overall site plan Phases 1 and 2; • Phase 2 – Building 8; • Building 9; • Elevations; • Material board; and • Parking stalls. Mr. Griffiths highlighted information on the landscape plan, providing information on the following: • plant schedule; • use of climate resilient trees; • flowering plants; • native plantings; • Permeable fencing on street side; • bike racks; • Material board; • Lighting, use of bollards; and • Concrete pavers. The applicant team responded to questions from Panel members regarding the following: • Rationale for different sizes of roof peaks; • Size of bed that can be maneuvered through stairway in top floor plan and potential to remove door at top to create more room in stairwell; • If there is pedestrian access from 208 Street to park; • Additional sound attenuation measures for units facing 208 Street; and • Whether there are entry doors to units from lane side; Panel members provided feedback on the form and character of the development and discussion took place regarding the following: • Some floorplans appear to show some doors overlapping; • Add more architectural interest on south/north elevations • Add more visual interest, such as a decorative element to the broader gable on building 9; • Adjust pedestrian access on 208 Street so it does not look like a route to the park; • Provide more distance between the ground floor unit entrance doors and the lane for safety; • Simplify and straighten 3 rd floor roof plan by removing nine inch niche on outside face; • Increase width of driveway aprons along lane to provide better turning radius; • Provide more basic u-shaped bike racks; • Remove plantings from apron; and --- page 5 --- ADP Minutes – January 15, 2025 4 • Correct south elevation windows that are not centered on the wall. Staff responded to questions from panel members regarding the following: • Rationale for not providing direct access to the park from yards of units facing the park; • Potential to have City Parks Department plant row of trees along property line of complex on City property to complement landscaping of the development. The applicant team left the meeting. There was further discussion regarding the following: • Potential for residents to use apron area in front of units for personal use if surface material was different from lane surface material; • Potential to provide gated access to the park for residents in the complex; • Location of pedestrian crossing for residents of the complex; and • Removal of laneway plantings. It was MOVED and SECONDED THAT: The ADP receive the staff report dated January 6, 2025 for information; and The ADP recommends the applicant give further consideration to the following prior to the application proceeding to Council: a. Consider wider driveway aprons along lane to narrow lane asphalt width (to reduce apparent width of lane driving surface and better delineate space between buildings). b. Review interior door placement and swing on ground floors to reduce conflicts. c. Review interior corridor width and stairwell design to maintain ability to move furniture, including mattresses, around corners. d. Review north elevation of Building 8 and south elevation of Building 9 to add more façade variety and visual interest. e. Consider additional façade variety under top of large gable on Building 9. f. Review design of pedestrian access from 208 Street into site, and design this access in a way that doesn’t indicate public park access from 208 Street. g. Consider stairwell placement at garage level, involving moving the entry door further into the unit to create more landing space where the entry door opens to the lane. --- page 6 --- ADP Minutes – January 15, 2025 5 h. Consider depth of façade variation on top floor of Building 8 (bedrooms). i. Provide basic ‘u-shaped’ design bike racks. j. Consider grouping townhomes together to make turnaround larger. k. Remove plantings in laneway/apron areas. l. Review and fix alignment of windows in elevations on all buildings to match as necessary. CARRIED Staff note: engage Parks staff re: possibility of planting new trees in Nicholas Park parallel to fence line, and providing gate access to the Park for residents in complex (along west side of Park). 5) NEXT MEETING January 29, 2025 6) ADJOURNMENT It was MOVED and SECONDED THAT the meeting adjourn at 8:40 pm. CARRIED __________________________________ ADVISORY DESIGN PANEL CHAIR __________________________________ CORPORATE OFFICER --- page 7 --- ADP Minutes – January 15, 2025 6 --- page 8 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject: Development Permit Application DP 13 - 24 Rezoning Application RZ 09-24 OCP Amendment Application OCP 01-24 (19991 49 Ave., 19990 50 Ave., and 4951-4975 & 4991 200 St.) From: Anton Metalnikov, RPP, MCIP Planner Bylaw #: 3305 & 3306 File #: 6620.00 Date: January 2 1 , 2025 Doc #: RECOMMENDATION: THAT this report be received for information. 1. PROPOSAL: Development Permit, rezoning, and Official Community Plan (OCP) amendment applications for a 6-storey rental apartment building including below-market units, daycare, church and community hall, and commercial space. 2. CITY BYLAWS & POLICIES: Applying to the subject properties: a. Official Community Plan (OCP): Ground Oriented Residential and Corner Commercial (townhome residential and local commercial); b. Zoning: P2 Private Institutional/Recreation Zone and RS1 Single Family Residential Zone; and c. Environmentally Sensitive Areas (ESAs): The site hosts both Low and Moderately Low sensitivity areas which would be affected by the proposal. The proposed development: a. Includes an OCP amendment to Low Rise Residential to enable the proposed apartment uses, height, and density. The applicant’s rationale for this amendment is that it would deliver public benefits, including: ◦ 60 below-market rental homes (20 percent below appraised market rent), supported by the Provincial BC Builds program; --- page 9 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 13-24, Rezoning Application RZ 09-24, & OCP Amendment Application OCP 01-24 Page 2 ◦ A large child care facility (approximately 49 infant, toddler and preschool spaces, plus approximately 24 after school spaces); ◦ A new church and community hall; and ◦ The establishment of a greenway plaza and connection to a future trail to be extended to Conder Park through future development. b. Includes a rezoning to CD108 Comprehensive Development Zone to enable the proposed development, due to the absence of a standard zone accommodating the Low Rise Residential and Corner Commercial OCP designations in the current Zoning Bylaw; and c. Requires a Development Permit for a mixed-use multi-unit development and development within ESAs. An environmental assessment will be conducted and the results, including any compensation as necessary, will be provided when this application proceeds to Council. 3. DETAILED BACKGROUND INFORMATION Applicant: Pacific Nazarene Housing Society, Inc. Owners: Church of the Nazarene Canada Pacific District, Inc. & City of Langley Civic Addresses: 19991 49 Avenue, 19990 50 Avenue, and 4951 - 4975 & 4991 200 Street Legal Description: Parcel “A” (Reference Plan 9135), Lot 1, Except: Firstly; Part Outlined Red on Plan with Bylaw Filed 58930, Secondly: Part Subdivided by Plan 37325, Thirdly: Part Dedicated Road on Plan LMP11207, Section 3, Township 8, New Westminster District, Plan 5752; Lot 16, Except: Part Dedicated Road on Plan LMP10777, Section 3, Township 8, New Westminster District, Plan 26103; Lots 118 & 119, Section 3, Township 8, New Westminster District, Plan 49001; Lots 364 & 365, Section 3, Township 8, New Westminster District, Plan 57025; Site Area: 11,198.3 m 2 (2.77 acres) Number of Units: 302 apartments Gross Floor Area: 23,522.2 m 2 (253,191.2 ft 2 ) Floor Area Ratio: 2.10 Lot Coverage: 39% Total Parking Required: 565 spaces (including 28 accessible spaces) *RM3 Zone Requirements Parking Provided: 429 spaces (including 20 accessible spaces) Existing OCP Designation: Ground Oriented Residential Proposed OCP Designation: Low Rise Residential Existing Zoning: P2 Private Institutional/Recreation & RS1 Single Family Residential Proposed Zoning: CD108 Comprehensive Development Variances Requested: Parking spaces shared among different uses 5.5 m long accessible parking stalls (5.8 m min.) Estimated Development Cost Charges (DCCs): $11,689,850.95 (City - $6,523,776.93, GVS&DD - $2,273,436.62, GVWD - $2,119,018.93, MV Parks - $94,616.14, SD35 - $176,200.00, TransLink - $502,802.33) *Subject to further review Community Amenity Contributions (CACs): $ 1,025,000 .00 *Subject to further review --- page 10 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 13-24, Rezoning Application RZ 09-24, & OCP Amendment Application OCP 01-24 Page 3 4. SITE CONTEXT (19991 49 Avenue, 19990 50 Avenue, and 4951-4975 & 4991 200 Street) The proposed development site consists of six properties: a church and five single-detached home lots. Single-detached homes designated Ground Oriented Residential in the OCP (envisioning townhome development) neighbour the site on all four sides. Additionally, its surroundings include: • North: 50 Avenue (collector street); • East: 200 Street (arterial street within TransLink’s Major Road Network); • South: 49 Avenue (collector street); and • West: 199A Street (local street). Context Map The site is located in a distinctly residential area but would itself create a variety of local-serving amenities including commercial businesses, child care, and an enlarged church and community hall. It also has convenient walking connections to: • Three transit routes (directly adjacent). The 200 Street corridor has also been identified in TransLink’s Access for Everyone plan for a future RapidBus line; • Conder Park (5-to-10-minute walk); and • Simonds Elementary School (10-minute walk). Conder Park Subject Site --- page 11 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 13-24, Rezoning Application RZ 09-24, & OCP Amendment Application OCP 01-24 Page 4 5. PROPOSED SITE AND BUILDING DESIGN A. Site Layout and Building Massing The proposed development is for a flat-roofed wood-frame building. At ground level, it is separated into two halves by a private internal street extension aligned with Grade Crescent to take advantage of the access provided by the existing traffic light on 200 Street and route the majority of vehicles through this connection to reduce the number of vehicles using the adjacent lower-traffic roads. Public pedestrian access will be permitted along a path through this private connection, which is intended to be extended as an 8-metre-wide greenway with a multi-use path and trees through to Conder Park as part of any future development of the properties to the west. A secondary vehicle connection is provided on 50 Avenue. There will be no general vehicle access to 49 Avenue or 199A Street, but an emergency-only access, secured with bollards, will be provided onto 199A Street to ensure emergency services have adequate access. The ground floor of the southern half includes a residential lobby and amenity spaces, a large child care space, and a church and community hall. The north side includes an additional residential lobby and five commercial units. Commercial tenants are yet to be determined, but are envisioned in the OCP Appendix A: Nicomekl River District Neighbourhood Plan as potentially including a café/bakery, convenience retail/food service, and/or small-scale office. Drive-through establishments and gas stations are prohibited. Underground parking is provided beneath the majority of the site, and has been designed to be expanded if the remaining area to the north is also developed in the future. Surface parking is also provided to the back of the buildings. The upper floors rise to a height of 6-storeys over this podium level and bridge the space created by the central access in an S-shape. This configuration allows for an efficient layout that maximizes rental housing supply on site, while breaking up the massing from all views with gaps between building wings reducing the street wall lengths. The building has also been designed to minimize shadowing on adjacent properties, and enable potential future mixed-use development on the properties to the north (between the proposed building and 50 Avenue). B. Building Elevations and Materials The building’s ground floor is wholly treated with white brick cladding and expansive fenestration into the commercial and church spaces. The same --- page 12 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 13-24, Rezoning Application RZ 09-24, & OCP Amendment Application OCP 01-24 Page 5 white brick is used for partial walls separating the outdoor child care spaces. The upper residential floors are decorated with prominent coloured square- patterned metal panelling with alternating angles and thicknesses. Balconies are inset into the residential units and set back from these square modules, with glass railings in line with the panels. Wood-finish walls are provided within the balconies and serve as a warmer natural contrast. C. Landscaping The landscaping reflects the project’s varied mix of uses with various outdoor spaces provided beside the child care spaces (play areas), church (seating and dining), and commercial units (pocket plazas), and programmed to relate to these functions. The pocket plaza concrete unit paver surface treatment extends over the private street connection and its sidewalks to reinforce its intention as a public place and path. Landscape beds, featuring a variety of shrubs and trees, are provided around the perimeter of the site to add greenery and soften the site’s edge while maintaining visibility and engagement between the active ground floors and the street, with some incorporating benches. Strip LED lighting is integrated into this seating, bollard lighting is provided along the central vehicle court, and additional lighting is incorporated elsewhere to accent select trees. An outdoor amenity deck is provided on the second floor, on the roof of the commercial units below, which includes additional plantings and trees. The development would also upgrade the public realm frontage. In addition to new sidewalks on all sides and a bike path along 200 Street, this would include new street trees along 49 and 50 Avenues and 199A Street, as well as new trees along the west property line. New street trees would also be provided along 200 Street which, together with new private trees to be planted on the property, would create a double row of trees that flanks the sidewalk and bike path on both sides. D. Building Program and Details The building’s unit mix includes: • 75 studios (25%); • 154 one-bedroom units (51%); • 58 two-bedroom units (19%); and • 15 three-bedroom units (5%). 61 (20.2%) of the units are adaptable. Resident storage facilities are provided in storage rooms in the residential floors as well as within in-unit storage rooms. 1,045 m 2 (11,248 ft 2 ) or total amenity space is provided, --- page 13 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 13-24, Rezoning Application RZ 09-24, & OCP Amendment Application OCP 01-24 Page 6 including 400 m 2 (4,306 ft 2 ) of indoor space and 645 m 2 (6,943 ft 2 ) of outdoor space split between the second-floor deck and a ground-floor space outside the southern indoor amenity rooms. 6. SUSTAINABILITY FEATURES • Construction techniques that minimize site disturbance and protect air quality; • Lighting systems meeting ground-level and dark skies light pollution reduction principles; • Incorporating a construction recycling plan and the use of recycled building materials; • Achieves an energy performance of 25% better than the current Model National Energy Code for multi-unit residential buildings; • Reduced heat island effect with a high-reflectivity roof; • Non-water dependent and drought-tolerant materials in the landscape design served by an irrigation system with central control and rain sensors; and • Water-conserving toilets. 7. CPTED The applicant’s proposal benefited from a comprehensive Crime Prevention Through Environmental Design (CPTED) review by a qualified consultant whose recommendations were incorporated into the plans. 8. VARIANCES A. Parking spaces shared among different uses. The proposed building includes a diverse variety of uses, including apartments, child care, a church and community hall, and commercial units. Parking for apartment residents will be provided in full by the dedicated and secured underground parking level. Other parking requirements, namely apartment visitor (0.2 spaces/unit), child care (1 space/employee), church (1 space/10 m 2 floor area), and commercial parking (3 spaces/93 m 2 floor area), are required to be calculated and provided independently in the current Zoning Bylaw. This would result in a total non-resident parking requirement of 184 spaces. However, the parking demand for these different uses generally peaks at different times. For example, parking use is greatest for resident visitors in the evenings and weekends, for child care and commercial spaces during business hours, and for churches on Sundays. The proposed development --- page 14 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 13-24, Rezoning Application RZ 09-24, & OCP Amendment Application OCP 01-24 Page 7 includes 103 surface parking spaces to take advantage of these offset peaks in parking demand to make more efficient use of space and allow the various neighbourhood-serving uses to all be provided while ensuring that each has adequate parking available. This approach has previously been taken on other mixed-use buildings in the City, where certain parking spaces are shared between commercial customers and residential visitors, while others are dedicated to one function or the other at all times, as informed by a parking study prepared by a professional engineer. Staff are considering formalizing and standardizing this shared parking approach in the new Zoning Bylaw currently under development. A parking study is currently being conducted for this proposal. It will provide more information and recommendations on how the shared parking can best be organized, including what number of stalls needs to be available for which different uses at which different times. Based on this, there may be updates made to the design, number and location of surface parking spaces prior to the application proceeding to Council. Once the shared parking arrangement is confirmed, the shared parking spaces will be signed and managed accordingly by the landowner. These results will be presented when the application proceeds to Council. B. Accessible stall length The length of the accessible stalls is proposed at 5.5 metres, compared to the 5.8 metres required in the Zoning Bylaw. The 5.5 metre length is consistent with the City’s standard parking stall dimension requirements and several other surrounding municipalities (including Langley Township, Surrey, Maple Ridge, and Abbotsford) use the same stall length for both standard and accessible parking spaces. Staff are also considering making standard and accessible parking stall lengths consistent in the City’s upcoming new Zoning Bylaw. C. Residential parking If the current Zoning Bylaw requirement for a similar type of building (i.e. RM3 Zone) was applied to this application, the applicant’s proposed overall parking amount is 14.4% less than what would be required. Given that a CD zone is being proposed for this development, technically only the previous parking-related variances are required. However, it is important to note that staff support the applicant’s residential parking approach, as the proposal (less 55 spaces of 14.4%) exceeds the rates under preliminary consideration for the new Zoning Bylaw. These rates are being used for apartment applications to the north, including those along 53 and 53A Avenues, and are based on research work conducted by the City’s Zoning --- page 15 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 13-24, Rezoning Application RZ 09-24, & OCP Amendment Application OCP 01-24 Page 8 Bylaw update consultant and staff to date, recent parking-related Provincial legislation and guidance, a review of parking requirements in other Lower Mainland municipalities, and the Metro Vancouver Parking Study, which concluded that rental homes, and especially below-market rental homes, have notably lower parking demand. If the preliminary rates being considered for the draft new Zoning Bylaw were applied to this application, 323 resident parking spaces would be required, based on rates of 1.0 spaces per studio and 1-bedroom unit, 1.25 spaces per 2-bedroom unit, and 1.45 spaces per 3-bedroom unit. This total is 3 spaces (1%) less than the proposed parking amount of 326 resident spaces and is 15.2% less than the current RM3 Zone requirement of 381 spaces, which is based on rates of 1.2 spaces per studio and 1-bedroom unit, 1.3 spaces per 2-bedroom unit, and 2.0 spaces per 3-bedroom unit. Based on the above rationales, staff support these variances. 9. ENGINEERING These requirements have been issued to reflect the application for a rezoning development application proposing institutional, and commercial & residential mixed-use development located at: • 19991 49 Avenue • 19990 50 Avenue • 4951, 4961, 4975, and 4991 200 Street Note: all works are to be done to the City of Langley’s Design Criteria Manual (DCM), and the City’s Subdivision and Development Servicing Bylaw (SDSB). Per the City’s DCM requirement, the developer and their consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Commitment by Owner and Consulting Engineer) prior to starting their design works. Per the City’s Watercourse Protection Bylaw No. 3152, the developer’s consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Confirmation of Commitment by Qualified Environmental Professional - QEP) prior to starting their site monitoring works. --- page 16 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 13-24, Rezoning Application RZ 09-24, & OCP Amendment Application OCP 01-24 Page 9 ENGINEERING SERVICING COMMENTS – PRELIMINARY ONLY Off-site servicing drawing submission will not be accepted until traffic impact assessment (TIA) report, existing road structure assessment report, and water & sanitary hydraulic modelling report recommendations are finalized. A) Offsite Servicing Requirement 1. Garbage and recycling enclosures, and collection vehicle access route and turning radius shall be accommodated on the site 2. A Qualified Environmental Professional (QEP) must be engaged to implement erosion and sediment control in accordance with the City of Langley Watercourse Protection Bylaw #3152, as amended. 3. A storm water management plan for the site is required. Rainwater management measures used on site shall limit the release rate to pre- development levels to mitigate flooding and environmental impacts as detailed in the City’s DCM. All calculations shall be based the City’ DCM with 20% added to the calculated results to account for climate change. A safety factor of 20% shall be added to the calculated storage volume. Pre- development release rates shall not include climate change effect. 4. A Qualified Environmental Professional (QEP) must be engaged to implement erosion and sediment control in accordance with the City of Langley Watercourse Protection Bylaw #3152, as amended. 5. All existing services shall be capped at the main by the City, at the Developer’s expense prior to applying for a demolition permit. 6. New water, sanitary and storm sewer service connections are most likely required and they shall be provided from 49 or 50 Avenue. Service connection off arterial road is typically not supported. All pertinent service connection design calculations shall be submitted in spreadsheet format and shall include all formulas for review by the City. 7. Road Dedication and Easement a. Consultant shall submit the proposed road dedication, consolidation, subdivision, and/or SROW legal plan for Engineering staff review. b. 5m x 5m corner truncation is required at all intersections at 200 Street c. 4m x 4m corner truncation is required at 49 Ave @ 199A Street d. It appears 199A Street meet the required road ROW width for a local road. e. It appears 49 and 50 Avenue meet the required road ROW width for a collector road. --- page 17 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 13-24, Rezoning Application RZ 09-24, & OCP Amendment Application OCP 01-24 Page 10 f. It appears 200 Street fronting 4951, 4961, and 4975 meets the required road ROW width, west side of road, for an arterial road. g. Approximately 1.5m of road dedication is required fronting 4981 and 4991 200 Street. Additional road dedication from the east side of 200 Street will be required to achieve the required 30m road ROW for an arterial road. h. Approximately 3.5m of road dedication is required off the 200 Street frontage of 19991 49 Avenue. 8. Road Work a. The scope and extent of the off-site road works shall be determined in part from the TIA recommendation. b. 200 Street frontage shall be constructed to include raised separated bike lane per standard road drawing #SS-R01. Pedestrian and bike facility connectivity must be considered from 50 Avenue to Grade Crescent. c. 49 Avenue shall be constructed to meet collector road standard per standard road drawing #SS-R06 d. 50 Avenue shall be constructed to meet collector road with bike lane standard per standard road drawing #SS-R05 e. Curb return entrance off 200 Street shall be used. f. The condition of the existing pavement along the proposed project’s frontages shall be assessed by a geotechnical engineer. Pavements shall be adequate for an expected road life of 20 years under the expected traffic conditions for the class of road. Road construction and asphalt overlay designs shall be based on the analysis of the results of Benkelman Beam tests and test holes carried out on the existing road which is to be upgraded. If the pavement is inadequate, it shall be remediated by the Developer, at the Developer’s expense. 9. At the Developer's expense, a Traffic Impact Assessment (TIA) will be completed by the City’s standing traffic consultant per the DCM Section 8.21. The applicable fee toward completing the TIA must be paid via a cheque issued to the City’s selected traffic consultant and delivered to the City. TIA reports must be approved by the City Engineer prior to taking the application to Council. The TIA completion timing must be: a. For OCP Amendment / Rezoning Applications : Prior to Council’s first and second readings; and b. For Development Permits (DP) : Prior to Council consideration of the application. 10. Watermain and Water Service Connection a. New water service connection shall be provided from a collector or local road. --- page 18 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 13-24, Rezoning Application RZ 09-24, & OCP Amendment Application OCP 01-24 Page 11 b. The existing 150mm AC watermain on 49 Ave and 50 Ave shall be upgraded to current material standard and meet minimum size requirement. c. At the Developer’s expense, the capacity of the existing watermains shall be assessed through hydraulic modeling performed by the City’s standing consultant. Any upgrade requirement for watermain(s) not covered under the City’s DCC bylaw shall be designed and installed by the Developer at the Developer’s expense. d. Additional C71P fire hydrants may be required to meet bylaw and firefighting requirements. Hydrant locations must be per DCM Section 3.10 and approved by the City Engineer and the City of Langley Fire Rescue Service. 11. Storm & Sanitary Mains and Service Connections a. New service connection shall be provided from collector or local roads. b. A Stormceptor or equivalent oil separator is required to treat site surface drainage. c. Civil consultant shall complete a catchment area analysis per DCM section 4.0 to confirm that the City storm sewer system has sufficient capacity to accommodate the minor flow, and identify the floor route for the major rain event. Developer will need to upgrade/improve any capacity deficiency or negative impacts to the downstream system due to the proposed development. d. Part of this development falls under South Langley Integrated Rainwater Management. Infiltration is part of the runoff collection system. Please see section 5.7 in DCM for more details. e. Culvert crossing at 199A Street shall be reviewed by the designer to confirm it can meet the 1:100 year event. f. At the Developer’s expense, the capacity of the existing sanitary main shall be assessed through hydraulic modeling performed by the City’s standing consultant. Any upgrade requirement for sanitary main(s) not covered under the City’s DCC bylaw shall be designed and installed by the Developer at the Developer’s expense. 12. Street Light a. New street lights will be required along 49 Ave and 50 Ave frontages. Any required street lighting upgrades, relocation, and/or replacement shall be done at the Developer’s expense. Any existing BC Hydro lease-lights to be removed and disposed of off-site. b. Existing street lighting along 200 Street and 199A Street frontages shall be analyzed by a qualified electrical consultant to ensure street lighting and lighting levels meet the criteria outlined in DCM. --- page 19 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 13-24, Rezoning Application RZ 09-24, & OCP Amendment Application OCP 01-24 Page 12 13. Street Tree a. Street trees will be required all frontages as part of the road work. Pending final boulevard design, soil cell and irrigation may be required as per DCM section 11. 14. Eliminate the existing overhead BC Hydro/telecommunication infrastructure along the development’s 200 Street and 49 Avenue by replacing with underground infrastructure. The developer is responsible for contacting BCHydro and telecom companies to start the design work. If undergrounding is not possible at this time, pre-ducting the frontage is typically required by the developer with cash in-lieu contribution for the incomplete portion of the work. 15. Undergrounding of hydro, telecommunication to the development site is required, complete with underground or at-grade transformer. Transformers servicing developments are to be located on private property with maintenance access located on private property. All transformers to be wrapped upon installation by the Developer. B) The Developer is required to deposit the following bonding and fees: 1. The City will require a Security Deposit based on the estimated construction costs of installing civil works, as approved by the City Engineer. 2. The City will require inspection and administration fees in accordance to the Subdivision Bylaw based on a percentage of the estimated construction costs, as per the City’s Subdivision and Development Servicing Bylaw 2021 #3126. 3. A deposit for a storm, sanitary and water services is required, which will be determined by City staff after detailed civil engineering drawings are submitted, sealed by a Professional Engineer. 4. The City will require a $40,000 bond for the installation of a water meter to current City standards as per the DCM. 5. A signed and sealed pavement cut form (Form F-2 of the City’s DCM) shall be completed by the developer’s consulting engineer. Upon the review and approval of the City Engineer of the submitted form, the corresponding Permanent pavement cut reinstatement and degradation fees shall be paid by the Developer. --- page 20 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 13-24, Rezoning Application RZ 09-24, & OCP Amendment Application OCP 01-24 Page 13 NOTE: Deposits for utility services or connections are estimates only. The actual cost incurred for the work will be charged. The City will provide the developer with an estimate of connections costs, and the Developer will declare in writing that the estimate is acceptable. 10. FIRE DEPARTMENT COMMENTS Fire department access for the whole project was reviewed to ensure adequate access was in place for apparatus and firefighters. Fire apparatus access for the whole site must consider access route, including maneuverability, hydrant location and coverage, over height issues as well as weight bearing considerations. Bollard access to 199A St must be redesigned to support maneuverability of large firetruck apparatus. A construction fire safety plan shall be completed, complete with crane inspection records. A progressive standpipe installation will be required as construction rises. Standpipes will be required at the main entrance of the parkade, and in elevator lobbies. Stairwells act as an area of refuge and should be made as wide as possible (60”) All garbage/recycling containers must be stored in a fire rated, sprinklered room, and must be of adequate size to prevent spillover into adjacent area. Marked Exits must not be on a fob. A radio amplification bylaw is currently in development and will need to he adhered to. Consideration will be given to the installation of power banks in the storage room lockers for e-bikes charging. A Fire Safety plan and FD lock box (Knox box) will be required before occupancy. Two 4” FDC will be located on concrete pedestal at the front and rear of the building, not building mounted. exact location to be discussed with the Fire Department at a later date. 11. BUDGET IMPLICATIONS In accordance with Development Cost Charges Bylaw, 2024, No. 3256 and the City’s Amenity Contributions Policy, the proposed development would typically be estimated to contribute the following to the City: • Development Cost Charges (DCCs): $6,523,776.93 • Community Amenity Contributions (CACs): $1,025,000.00 Given the proposal’s inclusion of below-market rental homes and backing by a Provincial housing program, these figures are subject to change based on further consideration with Council. --- page 21 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 13-24, Rezoning Application RZ 09-24, & OCP Amendment Application OCP 01-24 Page 14 Prepared by: _______________________ Anton Metalnikov, RPP, MCIP Planner Concurrence: Concurrence: __________________________ _______________________ Roy M. Beddow, RPP, MCIP Carl Johannsen, RPP, MCIP Deputy Director of Development Services Director of Development Services Concurrence: Concurrence: __________________________ __________________________ David Pollock, P.Eng. Scott Kennedy Director of Engineering, Parks, Fire Chief & Environment Attachments --- page 22 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 13-24, Rezoning Application RZ 09-24, & OCP Amendment Application OCP 01-24 Page 15 DEVELOPMENT PERMIT APPLICATION DP 13-24 REZONING APPLICATION RZ 09-24 OCP AMENDMENT APPLICATION OCP 01-24 Civic Addresses: 19991 49 Avenue, 19990 50 Avenue, and 4951-4975 & 4991 200 Street Legal Description: Parcel “A” (Reference Plan 9135), Lot 1, Except: Firstly; Part Outlined Red on Plan with Bylaw Filed 58930, Secondly: Part Subdivided by Plan 37325, Thirdly: Part Dedicated Road on Plan LMP11207, Section 3, Township 8, New Westminster District, Plan 5752; Lot 16, Except: Part Dedicated Road on Plan LMP10777, Section 3, Township 8, New Westminster District, Plan 26103; Lots 118 & 119, Section 3, Township 8, New Westminster District, Plan 49001; Lots 364 & 365, Section 3, Township 8, New Westminster District, Plan 57025 Applicant: Pacific Nazarene Housing Society, Inc. Owners: Church of the Nazarene Canada Pacific District, Inc. & City of Langley --- page 23 --- --- page 24 --- --- page 25 --- --- page 26 --- --- page 27 --- --- page 28 --- --- page 29 --- --- page 30 --- --- page 31 --- --- page 32 --- --- page 33 --- --- page 34 --- --- page 35 --- --- page 36 --- --- page 37 --- --- page 38 --- --- page 39 --- --- page 40 --- --- page 41 --- --- page 42 --- --- page 43 --- --- page 44 --- --- page 45 --- --- page 46 --- --- page 47 --- --- page 48 --- --- page 49 --- --- page 50 --- --- page 51 --- --- page 52 --- --- page 53 --- --- page 54 --- --- page 55 --- --- page 56 --- --- page 57 --- --- page 58 --- --- page 59 --- --- page 60 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject: Development Permit Application DP 11 - 24 (20 501 Logan Avenue ) File #: From: Anton Metalnikov, RPP, MCIP Planner Bylaw #: N/A Doc #: Date: January 21 , 2025 RECOMMENDATION: THAT this report be received for information. 1. PROPOSAL: Development Permit application for a 6-storey mixed-use residential and commercial building at 20501 Logan Avenue consisting of 145 apartment units and 297 m 2 (3,195 sq ft) of commercial floorspace within the site plan associated with the multi-phase rezoning application active on the subject property. 2. CITY BYLAWS & POLICIES: Applying to the subject property: a. Official Community Plan (OCP): Transit-Oriented Core (maximum 15- storey height and maximum Floor Area Ratio of 5.5); b. Zoning: C2 Service Commercial; and c. Transit Oriented Area (TOA): Tier 2 (minimum allowable 12-storey height and Floor Area Ratio of 4, no residential parking requirements). The proposed development: a. Is consistent with the OCP (6-storey height and 2.3 FAR); b. Is proceeding alongside an active application (Bylaw 3287; 3 rd Reading given October 21, 2024) to rezone the subject property to the CD98 Comprehensive Development Zone to enable the subject development; and c. Requires a Development Permit for a multi-unit residential development. --- page 61 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 11-24 Page 2 3. DETAILED BACKGROUND INFORMATION 4. SITE CONTEXT (20501 Logan Avenue) The proposed development site consists of a portion of the property addressed 20501 Logan Avenue which would be subdivided prior to Council consideration of approval of the subject Development Permit. This portion is currently occupied by a business which uses the area for RV storage. Its surroundings include: • North: Two small bay light industrial buildings and a single-storey commercial building • East: Glover Road (arterial street) and an older townhome complex • South: Eastleigh Crescent extension (local street) and single-storey commercial buildings • West: Single-storey self-storage building. Applicant : Keystone Architecture & Planning Ltd. Owner: Argus Holdings Ltd. Civic Address: 20501 Logan Avenue Legal Description: Lot A, Except Part in Plan LMP24382, District Lots 308 and 309, Group 2, New Westminster District, Plan NWP88217 Site Area: 5,329 m 2 (1.32 acres) – post subdivision Number of Units: 145 apartments Gross Floor Area: 12,019 m 2 (129,374 ft 2 ) – Includes 297 m 2 (3,195 sq ft) commercial floorspace Floor Area Ratio: 2.255 Lot Coverage: 40.82% Total Parking Required: 18 spaces (including 9 accessible spaces) Parking Provided: 163 spaces (including 9 accessible spaces) OCP Designation: Transit-Oriented Core Residential Existing Zoning: C2 Service Commercial Proposed Zoning: CD98 Comprehensive Development Variances Requested: N/A Estimated Development Cost Charges (DCCs): $ 5,591,452.95 (City - $ 3,126,869.70 , GVS&DD - $1,076,074.95, GVWD - $1,001,628.50, MV Parks - $44,701.80, SD35 - $87,000.00, TransLink - $255,178.00) Community Amenity Contributions (CACs): $580,000.00 --- page 62 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 11-24 Page 3 Key neighbourhood amenities within walking distance include: • Innes Corners Plaza (5-to-10-walk); • Timms Community Centre (5-to-10-minute walk); and • Douglas Park Community School (10-minute walk). Future phases of the subject multi-phase development would also contribute additional pedestrian open spaces. Nearby transportation services include: • Fourteen bus routes within a 5-minute walk; • The frequent 503 Fraser Highway Express bus (5-minute walk); and • The planned Langley City Centre SkyTrain station and its associated transit exchange (5-to-10-minute walk). Context map 5. Proposed Site and Building Design A. Site Layout and Building Massing The building is proposed to be sited on a new parcel subdivided from the existing larger property in accordance with the multi-phase plan currently Subject p roperty & phase 1 development site 6-Storey apartment application 6-Storey apartment application 6-Storey apartment u/c --- page 63 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 11-24 Page 4 the subject of a rezoning application, which received third reading in October, 2024. This includes a partial extension of Eastleigh Crescent, which would be dedicated to the City as a public street and be extended to the west lot line with future phases, to serve the new building while retaining the existing business functions on the remainder of the larger property. The building is proposed in an extended shallow “U” shape, with a commercial frontage along Glover Road to the east and residential entrance and vehicle access on the Eastleigh Crescent extension. These frontages wrap a ground level parking area and sit atop a larger underground parking level, with residential floors rising above to a 6-storey height. To maximize parking supply and create a buffer for the apartments, these parking areas extend to near the property lines on the building’s other two sides, and will be screened with future development. A private courtyard serves as an outdoor amenity area and sits within the inside of the building’s “U” to the east. Both the parkade and the building itself are set back from the east property line to accommodate a Telus right-of-way. The subject development site is subject to the City’s Floodplain Elevation Bylaw, and the building has been raised accordingly. This elevation difference has been designed to interface softly along the Eastleigh Crescent frontage with tiered walls and landscaping, and to keep an open engaging relationship between the Glover Road commercial frontage and the public realm with a wide continuous stair that also incorporates seating. B. Building Elevations and Materials The parkade extrudes slightly above grade and is clad with brick veneer. The elevations above employ a mix of cement board panel siding of various shades and corrugated metal as the primary materials, with wood-tone panel and lap siding providing contrast and extruded frames and a varied cornice line creating articulation and highlighting storefronts and building entrances. Both glass and black picket aluminum balcony railings are used. C. Landscaping Planted landscaping lines the building’s frontage within integrated planter boxes, including several kousa dogwood trees. Additional street trees would also be provided along a widened Glover Road public realm and the new Eastleigh Crescent extension. The courtyard amenity area includes a play area with a climbing feature and ping pong table, a lending library, a barbecue station, and various dining and lounge areas separated with larger planter boxes. --- page 64 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 11-24 Page 5 D. Building Program and Details The building’s unit mix includes: • 76 one-bedroom units (52%); and • 69 two-bedroom units (48%). 29 (20%) of the units are adaptable. Resident storage facilities are provided in storage rooms in the ground-level parkade as well as within in-unit storage rooms. 944 m 2 (10,161 ft 2 ) or total amenity space is provided, including 176 m 2 (1,889 ft 2 ) of indoor space and 768 m 2 (8,269 ft 2 ) of outdoor space. 6. Sustainability Features • Construction techniques that minimize site disturbance and protect air quality; • Lighting systems meeting ground-level and dark skies light pollution reduction principles; • Incorporating a construction recycling plan and incorporating the use of recycled building materials; and • Non-water dependent and drought-tolerant plantings and materials in the landscape design. 7. CPTED The applicant’s proposal benefited from a comprehensive Crime Prevention Through Environmental Design (CPTED) review by a qualified consultant whose recommendations were incorporated into the plans. 8. Variances No variances are required for this application. Under recent Provincial legislation the City cannot require a specific number of residential and residential visitor parking spaces at this location (Transit Oriented Area, TOA). 9. Engineering These requirements have been prepared for 20501 Logan Avenue in regards to a rezoning application, and Phase 1 development permit (DP) and subdivision (RZ) application proceeding concurrently for a commercial & residential mixed-use development. As a condition of this rezoning application, Engineering will require a restrictive covenant in the form of a phased development agreement (PDA) to be registered on title over the undeveloped lot. The covenant shall stipulate that --- page 65 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 11-24 Page 6 all of the servicing obligations are to be fulfilled as each phase develops, including road dedication, utility upgrades, report/study updates, etc. Given that the development will proceed in phases, Engineering off-site servicing requirements will be required at the Development Permit (DP) stage for the corresponding phase, with the exception where continuity of City service(s) is deemed critical. Additional servicing work may be required upon Council requirement, site condition/ inspections, or receipt of other supporting reports and documents. All work to be done to the City of Langley’s Design Criteria Manual (DCM), and the City’s Subdivision and Development Servicing Bylaw (SDSB). As per the City’s DCM requirement, the Owner / Developer and their Consulting Engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Commitment by Owner and Consulting Engineer) prior to starting their design works. In accordance with the City’s Watercourse Protection Bylaw No. 3152, the Developer’s Consulting Engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Confirmation of Commitment by Qualified Environmental Professional - QEP) prior to starting their site monitoring works. ENGINEERING SERVICING COMMENTS - PRELIMINARY ONLY Off-site servicing drawing submissions will not be accepted until the Traffic Impact Assessment (TIA) report, existing road structure assessment report, and water & sanitary hydraulic modelling report recommendations are finalized. A) Offsite Servicing Requirement 1. The City’s Zoning Bylaw, 1996, #2100 has requirements concerning landscaping for buffer zonings, parking and loading areas, and garbage and recycling containers, all of which applies to this design. A dedicated on-site loading zone shall be provided by the developer. 2. Garbage and recycling enclosures, and collection vehicle access route and turning radius shall be accommodated on the site. Please refer to the City’s Subdivision and Development Servicing Bylaw 2021, No. 3126 for more details. For Phase 1, it is noted that staff and the applicant’s professionals are exploring variances to this requirement. 3. The Developer’s Consulting Engineer shall review the site layout to ensure that the parking layout, vehicle circulation, turning paths and access design meet applicable standards and sightline requirements, including setbacks from property lines. Appropriate turning templates should be --- page 66 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 11-24 Page 7 used to prove parking stalls, loading areas and drive aisles are accessible by service vehicles in accordance with Section 8 of the DCM. 4. A Qualified Environmental Professional (QEP) must be engaged to implement erosion and sediment control (ESC) in accordance with the City of Langley Watercourse Protection Bylaw #3152, as amended. The ESC plan must address the off-site works. The on-site ESC plan will be required at the Building Permit stage. 5. Storm Sewer and Service Connection. A rain water management plan for the site is required and the used on site shall limit the release rate to pre- development levels to mitigate flooding and environmental impacts as detailed in the City’s DCM. All calculations shall be based the City’ DCM with 20% added to the calculated results to account for climate change. A safety factor of 20% shall be added to the calculated storage volume. Pre- development release rates shall not include climate change effect. a. Storm water run-off generated on the site shall not impact adjacent properties or City roadways and must be shown on the lot grading plan. b. A new storm main will be required to extend from the Glover Road intersection to the end of Eastleigh Crescent. The Developer’s Consulting Engineer shall ensure that the design will accommodate future extension of the mains. c. Service connections for Phase 1 shall come off the new mains. The Developer’s Consulting Engineer shall confirm that the existing services for the remaining lot can be transferred to the new mains. 6. Service Connections. If applicable, any unused existing services shall be capped at the main by the City, at the Developer’s expense. New water, sanitary and storm sewer service connections will be required for the proposed development. Service connections off arterial roads are typically not supported. The Developer’s Consulting Engineer will need to determine the appropriate main tie-in locations and size the connections for the necessary capacity. All pertinent pipe design calculations shall be submitted in spreadsheet format and shall include all formulas for review by the City. 7. Watermain and Water Service Connection a. A new watermain (ultimate size to be confirmed) will be required to extend along Eastleigh Crescent from the Glover Road intersection to the end of the road with a temporary blow off. b. Water service connections for Phase 1 and the remaining lot shall be serviced off the new water main. --- page 67 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 11-24 Page 8 c. Additional C71P fire hydrants may be required to meet bylaw and firefighting requirements. Hydrant locations must be per DCM Section 3.10 and approved by the City Engineer and the City of Langley Fire Rescue Service. d. The existing 200mm AC water main on Logan Avenue does not meet current bylaw standard for pipe size or material and will need to be upgraded to a minimum 250mm diameter PVC main. However, given the limited development activity along Logan Avenue at this stage this requirement will be deferred to a future development phase. e. At the Developer’s expense the City’s hydraulic modeling consultant shall undertake an analysis of the water network to ensure there is sufficient water supply capacity for the ultimate site development as well as each development phase and confirm that any future development does not negatively impact existing City infrastructure. 8. Sanitary Sewer a. A new sanitary sewer main (ultimate size to be confirmed) will be required to extend from the Glover Road intersection to the end of Eastleigh Crescent. The Developer’s Consulting Engineer shall ensure that the design will accommodate future extension of the mains. b. Service connections for Phase 1 shall come off the new main on Eastleigh Crescent. The Developer’s Consulting Engineer shall confirm that the existing service from the remaining lot can be transferred to the new main. c. At the Developer’s expense, the capacity of the sanitary sewer system shall be assessed for the ultimate site development as well as each development phase through hydraulic modeling performed by the City’s standing hydraulic modeling consultant per DCM Section 6.5. 9. Road Dedication and Easement a. The Consulting Engineer shall submit the proposed road dedication, subdivision, and Statutory Right-of-Way legal plan for review by the City. b. The extension of Eastleigh Crescent will require a road dedication of 18.0 metres with additional Statutory Right-of-Ways granted to the City at a width of 0.75 metres on each side of this dedication. c. Logan Avenue will require approximately 4.6m of road dedication and a 2.0 metre Statutory Right-of-Way. d. Glover Road will require an approximately 3m of road dedication and a 2.0 metre Statutory Right-of-Way. e. 5.0 metre corner truncations are required at the following intersections: i. Glover Road and Logan Avenue ii. Eastleigh Crescent and Glover Road --- page 68 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 11-24 Page 9 iii. Logan Avenue and the new westerly lane (note: lane to be finalized and required under future DP submission) iv. A 4.0 metre corner truncation is required at the intersection of Eastleigh Crescent extension and the new westerly lane. 10. Road Work a. The scope and extent of the off-site road works shall be determined in part from the TIA recommendation. b. The condition of the existing pavement along the proposed project’s frontages shall be assessed by a geotechnical engineer. Pavements shall be adequate for an expected road life of 20 years under the expected traffic conditions for the class of road. Road construction and asphalt overlay designs shall be based on the analysis of the results of Benkelman Beam tests and test holes carried out on the existing road which is to be upgraded. If the pavement is inadequate, it shall be remediated by the Developer at their expense. c. Glover Road will need to be widened to accommodate a parking lane from northern site property line to Logan Ave. A new bike lane, sidewalk, barrier curb & gutter will also be required, complete with street lights, boulevard trees, and a planting strip as per modified SS- R01 cross-section provided by the City and Section 11.0 - Specifications and Standards for Landscaping. d. The extension of Eastleigh Crescent west into the subject property shall be from the existing intersection at Glover Road. A temporary turn-around facility shall be provided at the end of the road extension. New sidewalk, barrier curb & gutter will be required along the entire Eastleigh Crescent extension frontage, complete with boulevard trees and a planting strip as per modified SS-R07 provided by COL and Section 11.0 - Specifications and Standards for Landscaping. It is understood that the dedication and construction of Eastleigh Cres through the site will be completed as future development phases proceed. e. Logan Avenue will need to be widened to accommodate a parking lane from the northerly site property line to Logan Ave. A new bike lane, sidewalk, barrier curb & gutter will also be required, complete with street light, boulevard trees, and a planting strip. However, given the limited development activity along Logan Avenue at this stage, the City will defer this requirement to a future development phase. 11. At the Developer's expense, for the ultimate site development as well as each development phase a Traffic Impact Assessment (TIA) report or supplemental memo will be required per the DCM Section 8.21. The proposed development phase plans and statistics, along with a draft Terms of Reference (TOR) shall be forwarded to the City Engineer and the --- page 69 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 11-24 Page 10 scope of the final TOR determined. TIA reports or supplemental memos must be approved by the City Engineer prior to taking the application to Council. The TIA completion timing must be: a. For OCP Amendment / Rezoning Applications : Prior to Council’s first and second readings; and b. For Development Permits (DP) : Prior to Council consideration of the application. 12. Street Lights a. New street lights will be required along Eastleigh Crescent extension. b. The existing street lighting along Glover Road frontage shall be analyzed (excluding any BC Hydro lease lights) by a qualified electrical consultant to ensure street lighting and lighting levels meet the criteria outlined in DCM. c. The existing street lighting along Logan Avenue frontage shall be analyzed, and upgraded if necessary, at future development phase when road widening is planned. d. Any required street lighting upgrades, relocation, and/or replacement shall be done by the Developer at the Developer’s expense. Any existing BC Hydro lease-lights to be removed and disposed of off-site. 13. Street Trees a. Street trees will be required along Glover Road frontage as part of the widening work. Pending final boulevard design, soil cells and irrigation may be required as per DCM section 11. b. Street trees with soil cells and irrigation will be required along Eastleigh Crescent road extension. Irrigation system shall consider future development phase extension with the number of control and kiosk units minimized. c. Street trees will be required along Logan Avenue frontage at a future development phase when road widening is planned. 14. Eliminate the existing overhead BC Hydro/telecommunication infrastructure along the development’s Glover Road and Logan Avenue frontage by replacing with underground infrastructure. The developer is responsible for contacting BC Hydro and telecom companies to start the design work. If undergrounding is not possible at this time, pre-ducting the frontage is typically required by the developer with cash in-lieu contribution for the incomplete portion of the work. 15. Undergrounding of hydro, telecommunication to the development site is required, complete with underground or at-grade transformer. Transformers servicing developments are to be located on private property with --- page 70 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 11-24 Page 11 maintenance access located on private property. All transformers to be wrapped upon installation by the Developer. B) The Developer is required to deposit the following bonding and fees: 1. Once the civil servicing drawing package is accepted by the City, a servicing agreement will be prepared for issuance. 2. The City will require a Security Deposit based on the estimated construction costs of installing civil works for each development phase, as approved by the City Engineer. 3. The City will require inspection and administration fees in accordance to the Subdivision Bylaw based on a percentage of the estimated construction costs for each development phase, as per the City’s Subdivision and Development Servicing Bylaw 2021 #3126. 4. If completed by City crew, then a deposit for a storm, sanitary and water services for each phase will be required. Deposits for utility services or connections are estimates only. The actual cost incurred for the work will be charged. The City will provide an estimate of connections costs, and the Developer will declare in writing that the estimate is acceptable. 5. A signed and sealed pavement cut form (Form F-2 of the City’s DCM) shall be completed by the Developer’s Consulting Engineer. Upon the review and approval of the City Engineer of the submitted form, the corresponding Permanent pavement cut reinstatement and degradation fees shall be paid by the Developer. 10. Fire Department Comments Fire department access for the whole project was reviewed to ensure adequate access was in place for apparatus and firefighters. A construction fire safety plan shall be completed, complete with crane inspection records. A progressive standpipe installation will be required as construction rises. Standpipes will be required at the parkade elevator lobby and just inside the parade gate. Stairwells act as an area of refuge and should be made as wide as possible (60”) All garbage/recycling containers must be stored in a fire rated, sprinklered room, and must be of adequate size to prevent spillover into adjacent area. Marked Exits must not be on a fob. A radio amplification bylaw is currently in development and will need to he adhered to. Consideration should be given to the installation of power banks in the storage room lockers for e-bikes charging, as the use of extension cords is prohibited. A Fire Safety plan and FD lock box (Knox box) will be required before occupancy. The 4” Storz FDC will be located --- page 71 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 11-24 Page 12 on a pedestal at the front of the building, exact location to be discussed with the Fire Department at a later date. 11. Budget Implications In accordance with Development Cost Charges Bylaw, 2024, No. 3256 and the City’s Amenity Contributions Policy, the proposed development is estimated to contribute the following to the City: • Development Cost Charges (DCCs): $3,126,869.70 • Community Amenity Contributions (CACs): $580,000.00 Prepared by: _______________________ Anton Metalnikov, RPP, MCIP Planner Concurrence: Concurrence: __________________________ _______________________ Roy M. Beddow, RPP, MCIP Carl Johannsen, RPP, MCIP Deputy Director of Development Services Director of Development Services Concurrence: Concurrence: __________________________ __________________________ David Pollock, P.Eng. Scott Kennedy, Fire Chief Director of Engineering, Parks, & Environment Attachments --- page 72 --- To: Advisory Design Panel Date: January 21, 2025 Subject: Development Permit Application DP 11-24 Page 13 DEVELOPMENT PERMIT APPLICATION DP 11-24 Civic Address: 20501 Logan Avenue Legal Description: Lot A, Except Part in Plan LMP24382, District Lots 308 and 309, Group 2, New Westminster District, Plan NWP88217 Applicant: Keystone Architecture & Planning Ltd. Owner: Argus Holdings Ltd. --- page 73 --- --- page 74 --- --- page 75 --- --- page 76 --- --- page 77 --- --- page 78 --- --- page 79 --- --- page 80 --- --- page 81 --- --- page 82 --- --- page 83 --- --- page 84 --- --- page 85 --- --- page 86 --- --- page 87 --- --- page 88 --- --- page 89 --- --- page 90 --- --- page 91 --- --- page 92 --- --- page 93 --- --- page 94 --- --- page 95 --- --- page 96 --- --- page 97 --- --- page 98 --- --- page 99 --- --- page 100 --- --- page 101 --- --- page 102 --- --- page 103 ---