Agenda - Advisory Design Panel Source: https://www.langleycity.ca/media/file/adp-package-march-12-2025pdf Archived copy: https://heylangley.ca/records/city-of-langley/committees/advisory-design-panel/2025/2025-03-12-agenda-adp-package-march-12-2025pdf.pdf SHA-256 of the PDF: bcd34825cded86ed1158795b26283fc41778c0290e7fbbefbe6f37a233d21506 Fetched: 2026-11-10 --- page 1 --- ADVISORY DESIGN PANEL WEDNESDAY, MARCH 12, 2025 AT 7:00 PM Council Chambers Langley City Hall (In-Person Meeting) A G E N D A 1) AGENDA Adoption of the March 12, 2025 agenda. 2) MINUTES Adoption of minutes from the January 29, 2025 meeting. 3) DEVELOPMENT PERMIT APPLICATION DP 08-24 ZONING BYLAW AMENDMENT APPLICATION RZ 07-24 4505-4535 200A Street. 4) LANGLEY CITY CENTRE SKYTRAIN STATION DESIGN UPDATE Overview of design updates made to the Langley City Centre SkyTrain Station in response to ADP recommendations from the September 11, 2024 ADP meeting. 5) NEXT MEETING April – date to be confirmed. 6) ADJOURNMENT --- page 2 --- Document Number: 199395 MINUTES OF THE ADVISORY DESIGN PANEL HELD IN CKF ROOM, LANGLEY CITY HALL WEDNESDAY, JANUARY 29, 2025 AT 7:03 PM Present: Councillor Paul Albrecht (Chair) Councillor Mike Solyom (Co-Chair) Himanshu Chopra Melissa Coderre Jaswinder Gabri Matt Hassett Tracey Macatangay Ritti Suvilai Absent: Leslie Koole Tana McNicol Samantha Stroman Staff: C. Johannsen, Director of Development Services K. Kenney, Corporate Officer A. Metalnikov, Planner Chair Albrecht began by acknowledging that the land on which we gather is on the traditional unceded territory of the Katzie, Kwantlen, Matsqui and Semiahmoo First Nations. 1) AGENDA Adoption of the January 29, 2025 agenda It was MOVED and SECONDED THAT the January 15, 2025 agenda be adopted as circulated. CARRIED --- page 3 --- ADP Minutes – January 29, 2025 2 2) MINUTES Adoption of minutes from the December 11, 2024 meeting It was MOVED and SECONDED THAT the minutes of the December 11, 2024 Advisory Design Panel meeting be approved as circulated. CARRIED 3) INFORMATION UPDATE: DEVELOPMENT PERMIT APPLICATION DP 08-23 ZONING BYLAW AMENDMENT APPLICATION RZ 07-23 20625 Eastleigh Crescent. Mr. Johannsen updated the panel on a change to the development application for 20625 Eastleigh Crescent subsequent to the panel’s review of the application, which elevates the parkade about a metre higher above grade than originally proposed in order to allow the applicant to undertake deeper excavation entirely on their site with no impingement on neighbouring properties. 4) DEVELOPMENT PERMIT APPLICATION DP 13-24 ZONING BYLAW AMENDMENT APPLICATION RZ 09-24 OCP AMENDMENT APPLICATION OCP 01-24 19991 49 Avenue, 19990 50 Avenue, and 4951-4975 & 4991 200 Street. Mr. Johannsen advised of the purpose of the application to allow for creation of below market rental units through a partnership between the City, the property owner, and BC Builds. Mr. Metalnikov spoke to the staff report dated January 21, 2025 providing information on the proposed development. Staff responded to questions from Panel members regarding: • Other rental buildings with churches; • Status of neighbouring properties; • Recipient of tax exemption for Church property; The Applicant team entered the meeting: • Bob Prenovost, Managing Principal, Propellor Advisors (representing the owner/applicant) --- page 4 --- ADP Minutes – January 29, 2025 3 • Rodrigo Cepeda, Architect, Director of Project Delivery, hcma • William Vachon, Intern Architect, hcma • Nastaran Moradinejad, Landscape Architect Principal, PFS Studio Mr. Cepeda provided a PowerPoint presentation on the proposed development, providing information on the following: • Location map; • Infrastructure map showing infrastructure nearby to subject property; • Images of site in relation to Langley and downtown Vancouver; • Site master plan; • Floor plan levels 2 to 6; • Ground floor plan childcare space, commercial spaces, residential amenities, amenity space; • Colour palette; • Renderings of building from different views; • Main entrance rendering. Mr. Moradinejad highlighted information on the landscape design, providing information on the following: • Integration with architecture; • Indoor outdoor relations; • Landscape concept; • Ground level and level two; • Terraced landscape; • Community use area; • Residential amenity; • Incorporation of green space and trees wherever possible; • Materiality of landscaping; • Plantings – ground level; • Planting trees; • Shrubs, perennials and grasses. The applicant team responded to questions from Panel members and received feedback from Panel members regarding the form and character of the building: • Soften appearance of protective barrier between daycare playground and parking lot; • Overhead shade structure for upper floor courtyard; • Intended effect of diamond-shapes on building; • More visual interest at the top on roof; • More colour variance in sections; • Facilitating deliveries to commercial buildings; • Barrier for raised outdoor space; • Blueberry plantings on site; • Different sized loading spaces; • Amenity gym space proximity to a washroom; • Garbage pick-up process; --- page 5 --- ADP Minutes – January 29, 2025 4 • Potential for more colour variations and breaks in colour on various areas of the building • Have contrasting roof colour; • Have greater variety of window styles; • Different style pavers used to differentiate pedestrian-oriented space; • Make building style more residential, less institutional and boxy; • Soften up commercial spaces with displays; • Provide furniture for southwest amenity space for use by residents; • Ensure plantings for childcare area are non-toxic; • Consider adding trees near childcare space; • Do something with height of north face to create different levels; • Consider sound mitigation measures for balconies; • Provide 3D animation of building to capture the play of light described; • Consider podium style advertising sign at grade on 200 St. for businesses; • Location for Heritage Marker; • Consider incorporating mezzanines in commercial spaces; • Consider getting colour palette for building from trees in neighbourhood; • Ensure entry height clearance accommodates trucks; • Lighted bollards to line plaza; • Lighting opportunities for businesses; • Accessibility features to access the site; • Use treatment for roof that will reduce heat island effect; • Bike racks will be distributed throughout development; • Consider utilizing flexible space in southwest corner or outdoor church space for bike maintenance; • Sheen to materials will reflect light down toward street. Staff responded to questions from Panel members regarding the following: • Discussion between staff and applicant regarding colour palette; • Having more variation in roofline façade. The applicant team left the meeting. It was MOVED and SECONDED THAT: The ADP receive the staff report dated January 21, 2025 for information; and The ADP recommends the applicant give further consideration to the following prior to the application proceeding to Council: a. Soften the appearance of the childcare protection wall (e.g. visibility, art, etc.); b. Provide more information on the panel frame angling and treatment, especially near the top of the building, and confirm this feature’s viability and mitigation of solar reflectivity; --- page 6 --- ADP Minutes – January 29, 2025 5 c. Consider more variation within the colour palette (e.g. sectioned breaks in colour, at the building top, bases contrasting with residential floors above, etc.); d. Explore alternative colour palettes, materials, and other design treatments to soften the building in line with the residential character of the local neighbourhood; e. Ensure on-site wayfinding is provided; f. Review the placement of the elevators for Building Code compliance; g. Consider outdoor amenity space furnishing in greater detail, including considering a bicycle maintenance station in the southwest area and an overhead structure (e.g. pergola) in the raised courtyard; h. Explore greater variety in the dimensions of window and balcony voids; i. Consider increasing the height of the northern leg (e.g. similar to the step of the southern leg); j. Provide a 3D flythrough animated rendering to better represent the design’s rhythm and light play; k. Provide more information on building signage, including considering a podium sign oriented to the street; l. Ensure railway heritage is incorporated into the project (e.g. interpretive features, signage, etc.); m. Consider incorporating mezzanines into the commercial spaces; n. Review sound attenuation measures (e.g. street noise, between the ground floor and upper floors); o. Incorporate a high-albedo roof treatment to reduce the heat island effect; p. Ensure headlight glare is prevented to neighbouring properties. *CARRIED *Subsequent to this vote, a Panel member advised the Chair they disagreed with Panel’s recommendations with respect to changes to the colour, materials, and general look of the building 5) DEVELOPMENT PERMIT APPLICATION DP 11-24 20501 Logan Avenue. Mr. Johannsen advised of the purpose of the Gateway Village Phase 1 application which will provide an extension of Eastleigh Crescent into the site. Mr. Metalnikov spoke to the staff report dated January 21, 2025 providing information on the proposed development. The Applicant team entered the meeting: Andressa Linhares, Architect, Keystone Architecture & Planning Ltd. Elena Topisirovic, Project Manager, Keystone Architecture & Planning Ltd. Jennifer Wall, Landscape Architect, Keystone Architecture & Planning Ltd. Peter Fassbender, Developer representative, Fassbender Consulting Ltd. --- page 7 --- ADP Minutes – January 29, 2025 6 Ms. Topisirovic p rovided a PowerPoint presentation on the proposed development, providing information on the following: • Site context; • Project data; • Phasing plan; • Site Plan; • P1 level; • Floor Plans 1 – 6; • Roof Level; • Site sections. Ms. Linhares provided information on the following : • Design rationale; • Building elevations; • Material Board; • Renderings of the development; • View along Eastleigh Crescent; • Main entrance; • Amenity on level 2 podium. Ms. Wall provided information on the landscape plan, providing information on the following: • Site plan; • Benches and planters; • Materials; • Landscape buffer; • West side secured courtyard space; • North end security access; • Podium plan – exterior amenity space, north facing; • Planting palette. The applicant team responded to questions from Panel members and received feedback from Panel members regarding the form and character of building: • Design of future phases to be different but cohesive; • Colour palette seems dark; consider fewer colours, less black and more cedar or warmer colour; • Consider tying in industrial history through use of a metal colour palette for this building; • How landscape plan complements architecture (ex. use of paving grids); • Suggest getting more creative in the landscape; • Barrier between balconies is corrugated metal; • Opportunity to be more creative with colour in internal courtyard; • Soften the edges of the courtyard and elevated space; • Have covered area for amenity space; • Consider using rust colour on west side; • Make massing at corner tops bolder; --- page 8 --- ADP Minutes – January 29, 2025 7 • Have heavy duty wall between residential and commercial units for sound attenuation; • Address usability of parking spot 142; • Have washroom and plumbing for kitchenette for second level amenity space; • More greenery on second floor amenity; • Have auto door openers for bike rooms; • Have advertising signage for businesses geared to pedestrians; • Heritage element for distillery; • Raise design standards for lights, garbage cans and public furnishings along Eastleigh • Flex room is a den; • Bike storage for residents is located in parkade; • Make door frames wider in adaptable units; • Provide rendering of commercial frontage; • On-street parking will be available between Glover and Logan; • Maneuverability in parkade; • Enhance North elevation with white to create more contrast; provide more variation toward centre; • Playground feels bland: • Provide wider stairs for ground floor units to accommodate strollers, walkers; • Small patio size for ground street-facing units; • Have lighter coloured rooftop treatment to reduce heat island effect; • Glover Road treatment is important as it will set tone for Innovation Blvd. give more attention to that corner and the rooftop, make it bolder; • Privacy issues with west wing units facing courtyard. The applicant team left the meeting. There was further discussion regarding the following: • Whether the Panel prefers warmer or darker tone; • Renderings look darker than what they would look like in real life; • Get more creative in landscape amenity rendering; • Not much variation in colour and type of pavers, differentiate spaces in courtyard (private and public spaces) using creative surfacing; • Buffer courtyards from parking. It was MOVED and SECONDED THAT: The ADP receive the staff report dated January 21, 2025 for information; and The ADP recommends the applicant give further consideration to the following prior to the application proceeding to Council: a. Explore a more harmonized façade design (e.g. brightening/greater use of white panelling, warmer accents, reduced colour palette range, reduced number of vertical fins within the extruded frames); --- page 9 --- ADP Minutes – January 29, 2025 8 b. Within the courtyard, incorporate greater differentiation between different activity areas, provide more colour interest and warmth (e.g. play area safety surfacing), explore additional plantings (e.g. buffering the northern edge, lattices), and provide a weather protection feature; c. Consider additional colour variation on the west elevation and greater warmth on the north elevation; d. Review the roofline and façade design to more strongly highlight the building ends and corner pop-ups; e. Review usability of parking stall 142; f. Provide washroom and kitchen facilities within the indoor amenity area; g. Provide pedestrian-oriented commercial signage (e.g. hanging from commercial soffits); h. Incorporate automatic doors to facilitate maneuverability with bicycles; i. Consider property heritage in design; j. Ensure adaptable units have adequate door widths, maneuverable corridors, side-by-side washers/dryers, etc.; k. Provide a rendering of the ground floor commercial frontage; l. Review sound attenuation measures (e.g. street noise, between commercial and residential floors); m. Consider an alternative play feature; n. Consider a high-albedo roof treatment, solar panels, etc. to reduce the heat island effect; o. Review the design of the inside corner units within the courtyard for privacy. CARRIED 6) NEXT MEETING To be confirmed. 7) ADJOURNMENT It was MOVED and SECONDED THAT the meeting adjourn at 9:38 pm. CARRIED --- page 10 --- ADP Minutes – January 29, 2025 9 __________________________________ ADVISORY DESIGN PANEL CHAIR __________________________________ CORPORATE OFFICER --- page 11 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject: Development Permit Application DP 0 8 - 24 Rezoning Application RZ 07-24 (4505-4535 200A Street) From: Anton Metalnikov, RPP, MCIP Planner File #: 6620.00 Bylaw #: 3310 Date: March 6 , 2025 Doc #: RECOMMENDATION: THAT this report be received for information. PROPOSAL Development Permit and rezoning applications for a 27-unit townhome development. The proposal is seeking to purchase a small portion of City road right-of-way on 200A Street. It would also dedicate land to widen the pedestrian pathway to Alice Brown Elementary School. CITY BYLAWS & POLICIES: Applying to the subject properties: a. Official Community Plan (OCP): Ground Oriented Residential (townhome and plex-home development); and b. Zoning: RS1 Single Family Residential The proposed development: a. Is consistent with the OCP (townhome development); and b. Includes a rezoning to CD109 Comprehensive Development Zone to enable the proposed development in alignment with the OCP, due to the absence of a standard zone accommodating the Ground Oriented Residential OCP designation in the current Zoning Bylaw. --- page 12 --- To: Advisory Design Panel Date: March 6, 2025 Subject: Development Permit Application DP 08-24 & Rezoning Application RZ 07-24 Page 2 COMMENTS/ANALYSIS: Background Information: Discussion: 1. Context The applicant is proposing to develop a 27-unit townhome complex on the site of 4 single-detached lots. This site is located in an area of single-detached homes where the properties generally along 200 Street, including the subject site, are designated Ground Oriented Residential in the City’s Official Community Plan (OCP). This designation allows for townhome and plex-home development of up to 3 storeys in height and a maximum Floor Area Ratio (FAR) density of 1.2. Policies in the City’s Townhome & Plex-Home Best Practices Guide also apply. The Ground Oriented Residential designation was introduced through the OCP to provide a broader range of family-oriented housing options in the neighbourhood and near Alice Brown Elementary School, improve traffic and pedestrian safety along 200 Street by removing driveways and providing an upgraded streetscape, and align with future frequent transit service. Applicant: Leone Homes Inc. Civic Address es : 4505-4535 200A Street Legal Description: Lots 326-329, Section 35, Township 7, New Westminster District, Plan 49277 Site Area: 3,308 m 2 (35,607 ft 2 ) Number of Units: 27 townhomes Gross Floor Area: 3,785 m 2 (40,743 ft 2 ) Floor Area Ratio: 1.144 Lot Coverage: 45% Total Parking Required: 59 spaces (including 1 h/c space) Parking Provided: Resident Visitor Total 64 spaces 6 spaces 60 spaces (including 1 h/c space) OCP Designation: Ground Oriented Residential Existing Zoning: RS1 Single Family Residential Proposed Zoning: CD109 Comprehensive Development Zone Development Cost Charges: $853,521.00 (City - $317,945.00, GVS&DD - $224,633.00, GVWD - $221,845.00, MV Parks – $9,970.00, SD35 - $20,300.00, TransLink - $58,828.00) Community Amenity Contributions (CACs): $108,000.00 --- page 13 --- To: Advisory Design Panel Date: March 6, 2025 Subject: Development Permit Application DP 08-24 & Rezoning Application RZ 07-24 Page 3 Site context The site includes the first four properties running north from the Alice Brown Elementary School site to the south. These are also the first properties designated Ground Oriented Residential in the OCP north of the School, with the existing walkway to the east serving as a boundary with the Suburban OCP designation, which accommodates single-detached homes and plex-homes (up to 4 dwelling units per lot). The properties across 200A Street are also designated Suburban, while the properties up the block to the north and across 200 Street to the west share the same Ground Oriented Residential designation, with two plex-home proposals in application and a townhome development recently approved. The site is located in a distinctly residential area but has convenient walking connections to key amenities including: • Two bus routes (directly adjacent); • Alice Brown Elementary School (directly adjacent); and • Hunter Park, Penzer Park, and the power line trail (5-minute walk). Subject Site Alice Brown Elementary Duplex w/ suites application Fourplex application Townhomes approved --- page 14 --- To: Advisory Design Panel Date: March 6, 2025 Subject: Development Permit Application DP 08-24 & Rezoning Application RZ 07-24 Page 4 2. Proposed Rezoning and the Official Community Plan (OCP) The site is designated Ground Oriented Residential in the City’s OCP, which allows for townhome and plex-home development of up to 3 storeys in height and a Floor Area Ratio (FAR) density of up to 1.2. The subject properties are proposed to be rezoned to a site-specific Comprehensive Development (CD) Zone as no existing zones adequately accommodate the Ground Oriented Residential designation. A new Zoning Bylaw is currently in development and the project was designed to conform to the preliminary draft zoning regulations associated with this designation. Should the CD rezoning be adopted it is anticipated that, as part of adopting the new Zoning Bylaw, the City will rezone this site from its CD Zone to the new zone created to implement the Ground Oriented Residential designation. The application is generally consistent with the City’s Townhome & Plex-Home Best Practices Guide, including by incorporating the following features: • No balconies facing neighbouring Suburban properties unless separated by a street; • Using peaked roofs; • Upgrading the street frontage; • Providing one extra visitor parking stall than required; • Providing new, durable fencing for shared property lines; • Planting 20 new trees on-site and retaining 19 existing trees, including along the 200 Street frontage (secured by deposit); • Setting 3-storey townhomes back over 8 metres from adjacent Suburban properties and stepping down to a 2-storey height where closer; • Achieving a mix of side-by-side (or “double garage”) and tandem parking units, with over 50% being side-by-side (63%); and • Providing an outdoor amenity area for residents. 3. Design The applicant is proposing a 4-block townhome complex that responds to its long narrow site with a central drive aisle hosting two blocks on each of its sides. To straighten out the development site, the applicant is proposing to purchase a small portion of the City’s 200A Street road right-of-way (southern portion of cul de sac bulb adjacent to the site), which has been reviewed by staff and confirmed to be technically feasible as the replacement of four individual driveways with a single site access allows this street section to be rationalized into an “elbow curve” without an extended bulb. South of the curve, the site angles which results in staggered townhome depths to accommodate the widening of the existing walkway and the setback requirements from it and the property across from it. The drive aisle narrows slightly on its southern leg and support shallower --- page 15 --- To: Advisory Design Panel Date: March 6, 2025 Subject: Development Permit Application DP 08-24 & Rezoning Application RZ 07-24 Page 5 townhome blocks on its west side to enable the retention of more existing trees along 200 Street. The layout has also been designed to allow the drive aisle to be extended through the properties to the north for emergency vehicle access, along with a turnaround pad for regular vehicles. The development consists of 27 three-bedroom units, with all units having ground-level patios as well as balconies. The proposed 1.144 FAR density is less than the maximum density of 1.2 FAR permitted within the Ground Oriented Residential OCP land use designation. At ground level, the proposed design incorporates a white brick cladding on the main entrance side of the townhome blocks and white fibre cementitious lap siding on the garage side. The entry doors are also highlighted with a cedar- coloured composite wall panel edge and the garage doors are a contrasting dark colour. On the upper floors, light grey fibre cementitious lap siding acts as the base material, while two-storey height extruded portions are clad with light and dark board and batten to highlight individual units, add textural contrast, and create a rhythm of vertical articulation to break up the blocks’ massing. The same treatment is made use of on the building ends. Black picket aluminum railings add further contrast, with frosted glass balcony separators provided for privacy. The project’s landscaping uses a variety of shrubs, grasses, and perennials to soften the site’s edges and separate private patios. Trees of four different species are also provided in these landscaped areas to add a total of 20 new trees on- site. While this total does not reach the one-tree-per-unit guideline in the Best Practices Guide, this results from retaining many of the existing trees adjacent to the site which have large root zones that would conflict with the locations where additional new trees could be planted. Staff supports this landscape design as it meets the intent of the Guide’s tree policies. A row of large trees along the public walkway to Alice Brown Elementary will be retained and transferred into City ownership as a result of the dedication. Different paving materials are used to highlight the site entrance, walkways, visitor parking spaces, and private patios. An outdoor amenity area, consisting of play equipment for young children, is provided on the southeast corner. 4. Sustainability The proposal incorporates the following sustainable development features: • Using lighting systems meeting ground-level and dark skies light pollution reduction principles; • Achieving an energy performance above the current Model National Energy Code; • Incorporating climate-resilient and drought-tolerant plantings; and • Providing five Level II electric vehicle (EV) chargers. --- page 16 --- To: Advisory Design Panel Date: March 6, 2025 Subject: Development Permit Application DP 08-24 & Rezoning Application RZ 07-24 Page 6 5. CPTED The applicant’s proposal benefited from a comprehensive Crime Prevention Through Environmental Design (CPTED) review by a qualified consultant whose recommendations were incorporated into the plans. 6. Summary The proposed development is consistent with the City’s OCP, Development Permit Area guidelines, and Townhome & Plex-Home Best Practices Guide and provides family-oriented homes near transit, parks, and an elementary school. ENGINEERING REQUIREMENTS ENGINEERING SERVICING COMMENTS - PRELIMINARY ONLY These requirements have been issued to reflect the application for development for a proposed 27-unit Townhome Development located at 4505-35 200A St. These requirements may be subject to change upon further investigation, site inspections, receipt of civil off-site servicing drawing, sanitary & water hydraulic modelling report, and traffic impact assessment report. Off-site servicing drawing submission will not be accepted until traffic impact assessment (TIA) report, existing road structure assessment report, and water & sanitary hydraulic modelling report recommendations are finalized. All work to be done to the City of Langley’s Design Criteria Manual (DCM), and the City’s Subdivision and Development Servicing Bylaw (SDSB). Per the City’s DCM requirement, the developer and their consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Commitment by Owner and Consulting Engineer) prior to starting their design works. Per the City’s Watercourse Protection Bylaw No. 3152, the developer’s consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Confirmation of Commitment by Qualified Environmental Professional - QEP) prior to starting their site monitoring works. A. OFF-SITE SERVICING REQUIREMENTS 1. Road Dedication and Easement a. 200 Street appears to meet current arterial road ROW width b. 200A Street appears to meet current local road ROW width --- page 17 --- To: Advisory Design Panel Date: March 6, 2025 Subject: Development Permit Application DP 08-24 & Rezoning Application RZ 07-24 Page 7 c. 1.5m dedication is required along the existing walkway along the south PL 2. Road Works a. Garbage and recycling enclosures, and collection vehicle access route and turning radius shall be accommodated on the site without backing out to City highway. b. The scope and extent of the off-site works shall also be determined in part from the TIA recommendation. (Engineering Dept. notes staff has received a draft TIA report at time of preparing this memo.) TIA reports must be approved by the City Engineer prior to taking the application to Council’s first and second readings. c. New sidewalk, barrier curb, gutter will be required along the entire 200 St. and 200A St. frontages, complete with boulevard trees and a planting strip as per the City DCM cross-section SS-R12 (200A St.) and SS-R01 (200 St.) and Section 11.0 - Specifications and Standards for Landscaping. d. Refer to Walkway widening design as per City DCM section 8.18 and standard drawing SS-R28. e. The condition of the existing pavement along the proposed project’s frontages shall be assessed by a geotechnical engineer. Pavements shall be adequate for an expected road life of 20 years under the expected traffic conditions for the class of road. Road construction and asphalt overlay designs shall be based on the analysis of the results of Benkelman Beam tests and test holes carried out on the existing road which is to be upgraded. If the pavement is inadequate, it shall be remediated by the Developer, at the Developer’s expense. f. The selection, location and spacing of street trees and landscaping are subject to the approval of the City Engineer. Please refer to the City’s DCM for more details. g. A signed and sealed pavement cut form (Form F-2 of the City’s DCM) shall be completed by the developer’s consulting engineer. Upon the review and approval of the City Engineer of the submitted form, the corresponding Permanent pavement cut reinstatement and degradation fees shall be paid by the Developer. 3. Watermain and Water Service Connection a. One new water service connection shall be provided. The City will require a $40,000 refundable security bond for the installation of a water meter to current City standards as per the DCM. b. A water meter is required to be installed on private property, preferably in the mechanical room, in accordance to the City's DCM standards at the Developer's cost. --- page 18 --- To: Advisory Design Panel Date: March 6, 2025 Subject: Development Permit Application DP 08-24 & Rezoning Application RZ 07-24 Page 8 c. Additional C71P fire hydrants may be required to meet bylaw and firefighting requirements. Hydrant locations must be per DCM Section 3.10 and approved by the City Engineer and the City of Langley Fire Rescue Service. d. At time of preparing this memo, Engineering has reviewed the draft water hydraulic modelling report. The existing watermain network is not sufficient to meet the minimum bylaw requirement, or the required fire flow demand by the proposed development. Options to improve the available fire flow to meet the design requirements by extending or upsizing the water main network are under review. e. The City currently does not have any Capital upgrade planned for this neighborhood, nor is any watermain upgrade under DCC bylaw. Any upgrade requirement for either sanitary or water mains not covered under the City’s DCC bylaw shall be designed and installed by the Developer at the Developer’s expense. 4. Storm & Sanitary Mains and Service Connections a. One new sanitary service connection shall be provided from collector or local roads. b. Civil consultant shall complete a catchment area analysis per DCM section 4.0 to confirm that the City storm sewer system has sufficient capacity to accommodate the minor flow and identify the floor route for the major rain event. The developer will need to upgrade/improve any capacity deficiency or negative impacts to the downstream system due to the proposed development. c. This development falls under South Langley Integrated Rainwater Management. On and off-site infiltration shall be used for the all the runoff collection system. Please see section 5.7 in DCM for more details. A storm water management plan for the site is required. Pre-development release rates shall not include climate change effect. d. A Stormceptor or equivalent oil separator is recommended to treat site surface drainage. e. Stormwater run-off generated on the site shall not impact adjacent properties, or roadways. f. At time of preparing this memo, Engineering has reviewed the draft sanitary hydraulic modelling report. The existing sanitary network is sufficient to convey the proposed unit increase. Based on the modelling findings, no sanitary upgrade is required. 5. Street Light and Pedestrian Light a. Existing street lighting along the 200 and 200 A Street shall be analyzed (excluding any BC Hydro lease lights) by a qualified --- page 19 --- To: Advisory Design Panel Date: March 6, 2025 Subject: Development Permit Application DP 08-24 & Rezoning Application RZ 07-24 Page 9 electrical consultant to ensure street lighting and lighting levels meet the current criteria outlined in DCM 9.0. b. Pedestrian level lighting is required for the Walkway as per DCM requirement. c. Any required street lighting upgrades, relocation, and/or replacement shall be done by the Developer at the Developer’s expense. Any existing BC Hydro lease-lights to be removed and disposed of off- site. 6. Eliminate the existing overhead BC Hydro/telecommunication infrastructure along the development’s 200 Street by replacing with underground infrastructure. The developer is responsible for contacting BCHydro and telecom companies to start the design work. If undergrounding is not possible at this time, pre-ducting the frontage is typically required by the developer with cash in-lieu contribution for the incomplete portion of the work. 7. Undergrounding of hydro, telecommunication to the development site is required, complete with underground or at-grade transformer. Transformers servicing developments are to be located on private property with maintenance access located on private property. All transformers to be wrapped upon installation by the Developer. B) SECURITY BOND AND ENGINEERING FEES 1. The City will require a Security Deposit based on the estimated construction costs of installing civil works, as approved by the City Engineer. 2. The City will require inspection and administration fees in accordance to the Subdivision Bylaw based on a percentage of the estimated construction costs, as per the City’s Subdivision and Development Servicing Bylaw 2021 #3126. 3. A deposit for a sanitary and water services is required, which will be determined by City staff after detailed civil engineering drawings are submitted, sealed by a Professional Engineer. 4. The City will require a $40,000 bond for the installation of a water meter to current City standards as per the DCM. 5. A signed and sealed pavement cut form (Form F-2 of the City’s DCM) shall be completed by the developer’s consulting engineer. Upon the review and approval of the City Engineer of the submitted form, the corresponding --- page 20 --- To: Advisory Design Panel Date: March 6, 2025 Subject: Development Permit Application DP 08-24 & Rezoning Application RZ 07-24 Page 10 Permanent pavement cut reinstatement and degradation fees shall be paid by the Developer. NOTE: Deposits for utility services or connections are estimates only. The actual cost incurred for the work will be charged. The City will provide the developer with an estimate of connections costs, and the Developer will declare in writing that the estimate is acceptable. FIRE DEPARTMENT COMMENTS Fire department access for the whole project was reviewed to ensure adequate access was in place for both apparatus and firefighters. The project is being designed to allow the extension of the interior lane further north, with bollarded access limited to emergency vehicles. A construction fire safety plan shall be completed. A lockbox will need to be provided, location to be determined at a later date. ADVISORY DESIGN PANEL In accordance with Development Application Procedures Bylaw No. 2488, the subject Zoning Bylaw amendment and Development Permit application will be reviewed by the Advisory Design Panel (ADP) at the March 12, 2025 meeting. According to the Council-approved ADP Terms of Reference, the ADP is to provide form and character and urban design-related advice and recommendations for Council’s consideration. ADP recommendations will be presented to Council through the ADP meeting minutes and, if applicable, through an additional City staff report, prior to Council consideration of the proposed Zoning Bylaw amendment and Development Permit Applications. A copy of the ADP minutes will be presented to Langley City Council at a future Regular Council meeting. BUDGET IMPLICATIONS: In accordance with Bylaw No. 2482, the proposed development would contribute $317,945.00 to City Development Cost Charge accounts and $108,000.00 in Community Amenity Contributions. --- page 21 --- To: Advisory Design Panel Date: March 6, 2025 Subject: Development Permit Application DP 08-24 & Rezoning Application RZ 07-24 Page 11 Prepared by: _______________________ Anton Metalnikov, RPP, MCIP Planner Concurrence: Concurrence: __________________________ _______________________ Roy M. Beddow, RPP, MCIP Carl Johannsen, RPP, MCIP Deputy Director of Development Services Director of Development Services Concurrence: Concurrence: __________________________ __________________________ David Pollock, P.Eng. Scott Kennedy Director of Engineering, Parks, Fire Chief & Environment Attachments --- page 22 --- To: Advisory Design Panel Date: March 6, 2025 Subject: Development Permit Application DP 08-24 & Rezoning Application RZ 07-24 Page 12 DEVELOPMENT PERMIT APPLICATION DP 08-24 REZONING APPLICATION RZ 07-24 Civic Addresses: 4505-4535 200A Street Legal Description: Lots 326-329, Section 35, Township 7, New Westminster District, Plan 49277 Applicant: Leone Homes Inc. --- page 23 --- --- page 24 --- --- page 25 --- --- page 26 --- --- page 27 --- --- page 28 --- --- page 29 --- --- page 30 --- --- page 31 --- --- page 32 --- --- page 33 --- --- page 34 --- --- page 35 --- --- page 36 --- --- page 37 --- --- page 38 --- --- page 39 --- --- page 40 --- --- page 41 --- --- page 42 --- --- page 43 --- --- page 44 --- --- page 45 --- --- page 46 --- --- page 47 --- --- page 48 --- --- page 49 --- --- page 50 --- --- page 51 --- --- page 52 --- --- page 53 --- --- page 54 --- --- page 55 --- --- page 56 --- --- page 57 --- --- page 58 --- --- page 59 --- --- page 60 --- --- page 61 --- --- page 62 --- --- page 63 --- --- page 64 --- --- page 65 --- --- page 66 --- --- page 67 --- --- page 68 --- Acc. Stall R 5.5 M X 2.6 M R 5.5 M X 2.6 M R 5.5 M X 2.6 M R 5.5 M X 2.6 M R 5.5 M X 2.6 M H/C 5.8 M X 3.7 M BUILDING-2 BUILDING-3 BUILDING-1 BUILDING-4 200A STREET PYRUS CALLERYANA 'CHANTICLEER' TREE PROTECTION FENCE TREE TO BE RETAINED CERCIS CANADENSIS 1.8M HT. FENCE 1.06M HT. ALUMINUM FENCE BENCH ON CONC. PAD CHAMOMILE BETWEEN STEPPING STONE BIKE RACK (FOR 3 BIKES) GRASS-CRETE, BELGARD TURFSTONE BIKE RACK (FOR 3 BIKES) MAILBOX SIGNAGE FIBAR TREE PROTECTION FENCE TREE TO BE RETAINED WOOD LOGS AND STEPPERS AT OUTDOOR AMENITY AREA TRIM THE BRANCH IF IT IS NECESSARY TO ENSURE THE USAGE OF OUTDOOR AMENITY AREA TREE PROTECTION FENCE TREE PROTECTION FENCE TREE TO BE RETAINED TREE PROTECTION FENCE TREE PROTECTION FENCE TREE TO BE RETAINED TREE PROTECTION FENCE 1.06M HT. ALUMINUM FENCE PMG PROJECT NUMBER: 24-068 PLANTED SIZE / REMARKS COMMON NAME BOTANICAL NAME PLANT SCHEDULE KEY QTY TREE 6 CERCIS CANADENSIS EASTERN REDBUD 6CM CAL; B&B 5 CARPINUS BETULUS 'FRANS FONTAINE' 'FRANS FONTAINE' HORNBEAM 6CM CAL; 1.2M STD; B&B 4 PYRUS CALLERYANA 'CHANTICLEER' CHANTICLEER PEAR 6CM CAL; 2M STD; B&B 5 STYRAX JAPONICUS 'PINK CHIMES' PINK FLOWERED JAPANESE SNOWBELL 6CM CAL; B&B NOTES: * PLANT SIZES IN THIS LIST ARE SPECIFIED ACCORDING TO THE BC LANDSCAPE STANDARD AND CANADIAN LANDSCAPE STANDARD, LATEST EDITION. CONTAINER SIZES SPECIFIED AS PER CNLA STANDARD. BOTH PLANT SIZE AND CONTAINER SIZE ARE THE MINIMUM ACCEPTABLE SIZES. * REFER TO SPECIFICATIONS FOR DEFINED CONTAINER MEASUREMENTS AND OTHER PLANT MATERIAL REQUIREMENTS. * SEARCH AND REVIEW: MAKE PLANT MATERIAL AVAILABLE FOR OPTIONAL REVIEW BY LANDSCAPE ARCHITECT AT SOURCE OF SUPPLY. AREA OF SEARCH TO INCLUDE LOWER MAINLAND AND FRASER VALLEY. * SUBSTITUTIONS: OBTAIN WRITTEN APPROVAL FROM THE LANDSCAPE ARCHITECT PRIOR TO MAKING ANY SUBSTITUTIONS TO THE SPECIFIED MATERIAL. UNAPPROVED SUBSTITUTIONS WILL BE REJECTED. ALLOW A MINIMUM OF FIVE DAYS PRIOR TO DELIVERY FOR REQUEST TO SUBSTITUTE. SUBSTITUTIONS ARE SUBJECT TO BC LANDSCAPE STANDARD AND CANADIAN LANDSCAPE STANDARD - DEFINITION OF CONDITIONS OF AVAILABILITY. * ALL LANDSCAPE MATERIAL AND WORKMANSHIP MUST MEET OR EXCEED BC LANDSCAPE STANDARD AND CANADIAN LANDSCAPE STANDARD LATEST EDITION. * ALL PLANT MATERIAL MUST BE PROVIDED FROM CERTIFIED DISEASE FREE NURSERY. * BIO-SOLIDS NOT PERMITTED IN GROWING MEDIUM UNLESS AUTHORIZED BY LANDSCAPE ARCHITECT. 1.06M HT. ALUMINUM FENCE FENCE LEGEND MATERIAL LEGEND CONCRETE BELGARD HOLLAND STONE 100 x 200 x 60MM; CHARCOAL COLOUR 1.8M HT. FENCE BELGARD VS-5; CHARCOAL COLOUR; HERRINGBONE PATTERN 1.2M HT. PATIO SCREEN BELGARD CORTEZ SLAB 610 X 610 X50MM; NATURAL COLOUR GRAVEL FIBAR LANDSCAPE & STONE SUPPLY BASALT STEPPING STONE XL CFPXL GRASS-CRETE, BELGARD TURFSTONE MAGLIN BIKE RACK MAGLIN BENCH CHK'D: 24068-5.ZIP DRAWN: DESIGN: SCALE: DATE: PMG PROJECT NUMBER: 24-068 OF 6 DRAWING TITLE: PROJECT: DRAWING NUMBER: REVISION DESCRIPTION NO. DATE DR. 4505, 4515, 4525 & 4535 200 STREET SEAL: Copyright reserved. This drawing and design is the property of PMG Landscape Architects and may not be reproduced or used for other projects without their permission. c CLIENT: LANDSCAPE Burnaby, British Columbia, V5C 6G9 p: 604 294-0011 ; f: 604 294-0022 Suite C100 - 4185 Still Creek Drive ARCHITECTS 1 24.JUL.26 ISSUED FOR DP 2 24.SEP.10 NEW SITE PLAN/CITY COMMENTS RJ 3 24.OCT.03 BIKE RACK RELOCATION YR 4 24.OCT.07 NEW SITE PLAN JR 5 24.OCT.28 NEW SITE PLAN RJ 6 25.JAN.07 TREE MGT PLAN AR 7 25.MAR.03 CITY COMMENTS YR 27 UNIT TOWNHOUSE DEVELOPMENT CITY OF LANGLEY, BC LANDSCAPE PLAN L1 24.JUN.06 1:200 RJ RJ YR --- page 69 --- BUILDING-2 BUILDING-3 BUILDING-1 BUILDING-4 200A STREET TREE PROTECTION FENCE TREE TO BE RETAINED TREE PROTECTION FENCE TREE TO BE RETAINED TREE PROTECTION FENCE EXISTING TREE TO RETAIN EXISTING TREE TO REMOVE TREE PROTECTION FENCE (REFER TO ARBORIST REPORT) PROPOSED TREE LEGEND CHK'D: 24068-5.ZIP DRAWN: DESIGN: SCALE: DATE: PMG PROJECT NUMBER: 24-068 OF 6 DRAWING TITLE: PROJECT: DRAWING NUMBER: REVISION DESCRIPTION NO. DATE DR. 4505, 4515, 4525 & 4535 200 STREET SEAL: Copyright reserved. This drawing and design is the property of PMG Landscape Architects and may not be reproduced or used for other projects without their permission. c CLIENT: LANDSCAPE Burnaby, British Columbia, V5C 6G9 p: 604 294-0011 ; f: 604 294-0022 Suite C100 - 4185 Still Creek Drive ARCHITECTS 1 24.JUL.26 ISSUED FOR DP 2 24.SEP.10 NEW SITE PLAN/CITY COMMENTS RJ 3 24.OCT.03 BIKE RACK RELOCATION YR 4 24.OCT.07 NEW SITE PLAN JR 5 24.OCT.28 NEW SITE PLAN RJ 6 25.JAN.07 TREE MGT PLAN AR 7 25.MAR.03 CITY COMMENTS YR 27 UNIT TOWNHOUSE DEVELOPMENT CITY OF LANGLEY, BC TREE MANAGEMENT PLAN L2 25.JAN.06 1:200 AR RJ YR --- page 70 --- Acc. Stall R 5.5 M X 2.6 M R 5.5 M X 2.6 M R 5.5 M X 2.6 M R 5.5 M X 2.6 M R 5.5 M X 2.6 M H/C 5.8 M X 3.7 M BUILDING-2 BUILDING-3 BUILDING-1 BUILDING-4 200A STREET 42.90+ 20% 2% 42.87+ +TW42. 62 + BW41.97 +42.90 +42.87 20% 2% + TW42.62 +B W41. 97 42.90+ 42.87+ 20% 2% +42.90 +42.87 20% 2% +TW42.62 + BW41.97 42.90+ 42.87+ 20% 2% +42.90 +42.87 20% 2% +TW42.62 +BW41.97 +42.90 +42.87 20% 2% +TW42. 62 + BW41.97 42.85+ +42.85 42.85+ 42.82+ +42.82 + T W 4 2 . 5 6 + B W 4 2 . 1 0 20% 20% +TW42.30 + B W 4 2 . 1 1 + T W 4 2. 85 + B W42.1 5 +TW42.85 +BW42.25 + TW42. 65 + B W 4 2 . 2 5 10% +42.85 +42.82 +42.85 +42.82 +42.85 +42.82 + TW42 .82 + B W 4 2 . 4 4 10% CHK'D: 24068-5.ZIP DRAWN: DESIGN: SCALE: DATE: PMG PROJECT NUMBER: 24-068 OF 6 DRAWING TITLE: PROJECT: DRAWING NUMBER: REVISION DESCRIPTION NO. DATE DR. 4505, 4515, 4525 & 4535 200 STREET SEAL: Copyright reserved. This drawing and design is the property of PMG Landscape Architects and may not be reproduced or used for other projects without their permission. c CLIENT: LANDSCAPE Burnaby, British Columbia, V5C 6G9 p: 604 294-0011 ; f: 604 294-0022 Suite C100 - 4185 Still Creek Drive ARCHITECTS 1 24.JUL.26 ISSUED FOR DP 2 24.SEP.10 NEW SITE PLAN/CITY COMMENTS RJ 3 24.OCT.03 BIKE RACK RELOCATION YR 4 24.OCT.07 NEW SITE PLAN JR 5 24.OCT.28 NEW SITE PLAN RJ 6 25.JAN.07 TREE MGT PLAN AR 7 25.MAR.03 CITY COMMENTS YR 27 UNIT TOWNHOUSE DEVELOPMENT CITY OF LANGLEY, BC GRADING PLAN L3 24.JUN.06 1:200 RJ RJ YR --- page 71 --- Acc. Stall R 5.5 M X 2.6 M R 5.5 M X 2.6 M R 5.5 M X 2.6 M R 5.5 M X 2.6 M R 5.5 M X 2.6 M H/C 5.8 M X 3.7 M BUILDING-2 BUILDING-3 BUILDING-1 BUILDING-4 200A STREET PMG PROJECT NUMBER: 24-068 PLANTED SIZE / REMARKS COMMON NAME BOTANICAL NAME PLANT SCHEDULE KEY QTY SHRUB 3 ARBUTUS UNEDO 'COMPACTA' COMPACT STRAWBERRY BUSH #3 POT; 80CM 93 BUXUS MICROPHYLLA 'WINTER GEM' LITTLE-LEAF BOX #3 POT; 40CM 16 CORNUS SERICEA REDTWIG DOGWOOD #2 POT; 80CM 27 KALMIA LATIFOLIA 'ELF' DWARF MOUNTAIN LAUREL #3 POT; 50CM 23 RHODODENDRON 'P.J.M.' RHODODENDRON; LIGHT PURPLE; E. MAY #2 POT; 50CM 14 ROSA MEIDILAND 'RED' MEIDILAND ROSE; RED #2 POT; 40CM 84 SKIMMIA JAPONICA (90% MALE) JAPANESE SKIMMIA #2 POT; 30CM 24 SPIRAEA JAPONICA 'LITTLE PRINCESS' LITTLE PRINCESS SPIRAEA; PINK #2 POT; 40CM 144 TAXUS X MEDIA 'HILLII' HILLII YEW 1.5M B&B GRASS 42 CAREX FLAGELLIFERA 'KIWI' KIWI WEEPING SEDGE #1 POT 46 CAREX OSHIMENSIS 'EVERGOLD' EVERGOLD JAPANESE SEDGE #1 POT 96 PENNISETUM ALOPECUROIDES 'HAMELIN' DWARF FOUNTAIN GRASS #1 POT PERENNIAL 14 ASTILBE x ARENDSII 'RED SENTINEL' FALSE SPIREA; RED #1 POT 49 ECHINACEA PURPUREA PURPLE CONEFLOWER 15CM POT 45 HEMEROCALLIS 'WHITE TEMPATION' DAYLILY, WHITE #1 POT; 20CM 53 LAVENDULA ANGUSTIFOLIA 'MUNSTEAD' ENGLISH LAVENDER; COMPACT; VIOLET-BLUE #1 POT 127 LIRIOPE MUSCARI BLUE LILY-TURF #1 POT GC 135 GAULTHERIA SHALLON SALAL #1 POT; 20CM NOTES: * PLANT SIZES IN THIS LIST ARE SPECIFIED ACCORDING TO THE BC LANDSCAPE STANDARD AND CANADIAN LANDSCAPE STANDARD, LATEST EDITION. CONTAINER SIZES SPECIFIED AS PER CNLA STANDARD. BOTH PLANT SIZE AND CONTAINER SIZE ARE THE MINIMUM ACCEPTABLE SIZES. * REFER TO SPECIFICATIONS FOR DEFINED CONTAINER MEASUREMENTS AND OTHER PLANT MATERIAL REQUIREMENTS. * SEARCH AND REVIEW: MAKE PLANT MATERIAL AVAILABLE FOR OPTIONAL REVIEW BY LANDSCAPE ARCHITECT AT SOURCE OF SUPPLY. AREA OF SEARCH TO INCLUDE LOWER MAINLAND AND FRASER VALLEY. * SUBSTITUTIONS: OBTAIN WRITTEN APPROVAL FROM THE LANDSCAPE ARCHITECT PRIOR TO MAKING ANY SUBSTITUTIONS TO THE SPECIFIED MATERIAL. UNAPPROVED SUBSTITUTIONS WILL BE REJECTED. ALLOW A MINIMUM OF FIVE DAYS PRIOR TO DELIVERY FOR REQUEST TO SUBSTITUTE. SUBSTITUTIONS ARE SUBJECT TO BC LANDSCAPE STANDARD AND CANADIAN LANDSCAPE STANDARD - DEFINITION OF CONDITIONS OF AVAILABILITY. * ALL LANDSCAPE MATERIAL AND WORKMANSHIP MUST MEET OR EXCEED BC LANDSCAPE STANDARD AND CANADIAN LANDSCAPE STANDARD LATEST EDITION. * ALL PLANT MATERIAL MUST BE PROVIDED FROM CERTIFIED DISEASE FREE NURSERY. * BIO-SOLIDS NOT PERMITTED IN GROWING MEDIUM UNLESS AUTHORIZED BY LANDSCAPE ARCHITECT. 267 CHAMAEMULUM NOBILE CREEPING CHAMOMILE #1 POT; 30CM CHK'D: 24068-5.ZIP DRAWN: DESIGN: SCALE: DATE: PMG PROJECT NUMBER: 24-068 OF 6 DRAWING TITLE: PROJECT: DRAWING NUMBER: REVISION DESCRIPTION NO. DATE DR. 4505, 4515, 4525 & 4535 200 STREET SEAL: Copyright reserved. This drawing and design is the property of PMG Landscape Architects and may not be reproduced or used for other projects without their permission. c CLIENT: LANDSCAPE Burnaby, British Columbia, V5C 6G9 p: 604 294-0011 ; f: 604 294-0022 Suite C100 - 4185 Still Creek Drive ARCHITECTS 1 24.JUL.26 ISSUED FOR DP 2 24.SEP.10 NEW SITE PLAN/CITY COMMENTS RJ 3 24.OCT.03 BIKE RACK RELOCATION YR 4 24.OCT.07 NEW SITE PLAN JR 5 24.OCT.28 NEW SITE PLAN RJ 6 25.JAN.07 TREE MGT PLAN AR 7 25.MAR.03 CITY COMMENTS YR 27 UNIT TOWNHOUSE DEVELOPMENT CITY OF LANGLEY, BC SHRUB PLAN L4 24.JUN.06 1:200 RJ RJ YR --- page 72 --- BUXUS MICROPHYLLA CORNUS SERICEA RHODODENDRON TAXUS X MEDIA 'HILLII' CAREX OSHIMENSIS PENNISETUM ALOPECUROIDES HEMEROCALLIS LIRIOPE MUSCARI LAVENDULA ANGUSTIFOLIA SHRUB ROSA MEIDILAND 'RED' SPIRAEA JAPONICA CAREX FLAGELLIFERA 'KIWI' ASTILBE x ARENDSII ECHINACEA PURPUREA ARBUTUS UNEDO 'COMPACTA' KALMIA LATIFOLIA 'ELF' SKIMMIA JAPONICA GAULTHERIA SHALLON CARPINUS BETULUS 'FRANS FONTAINE' CERCIS CANADENSIS PYRUS CALLERYANA TREE STYRAX JAPONICUS CHK'D: 24068-5.ZIP DRAWN: DESIGN: SCALE: DATE: PMG PROJECT NUMBER: 24-068 OF 6 DRAWING TITLE: PROJECT: DRAWING NUMBER: REVISION DESCRIPTION NO. DATE DR. 4505, 4515, 4525 & 4535 200 STREET SEAL: Copyright reserved. This drawing and design is the property of PMG Landscape Architects and may not be reproduced or used for other projects without their permission. c CLIENT: LANDSCAPE Burnaby, British Columbia, V5C 6G9 p: 604 294-0011 ; f: 604 294-0022 Suite C100 - 4185 Still Creek Drive ARCHITECTS 1 24.JUL.26 ISSUED FOR DP 2 24.SEP.10 NEW SITE PLAN/CITY COMMENTS RJ 3 24.OCT.03 BIKE RACK RELOCATION YR 4 24.OCT.07 NEW SITE PLAN JR 5 24.OCT.28 NEW SITE PLAN RJ 6 25.JAN.07 TREE MGT PLAN AR 7 25.MAR.03 CITY COMMENTS YR 27 UNIT TOWNHOUSE DEVELOPMENT CITY OF LANGLEY, BC PLANT IMAGE L5 24.JUN.06 RJ RJ YR --- page 73 --- 42" HT. METAL PICKET FENCE 1:25 2 SITE FURNITURE MOUNTING N.T.S 4 BENCH ON CONCRETE PAD 1:25 6 TREE AND SHRUB PLANTING AT GRADE 1:25 1 CONCRETE SAW CUTS 1:25 7 ROOTBALL WIDTH PLUS 600 MM (MIN) TREE STD. HT PER SPECS. 2/3 HT OF STANDARD NOTES: 18" TYP. 177.800 1066.800 76.200 635.000 2" SQ. ALUM. 76.200 MAX 101.600 1777.990 6" 584.197 NOTE: PROTECT TREE FROM DAMAGE DURING PLANTING. TREE ROOTS NOT TO BE EXPOSED TO SUN, FROST, WIND. DO NOT LET ROOTS DRY OUT. CONFIRM FREE DRAINING SUBSOIL. PROVIDE POSITIVE SURFACE DRAINAGE AT MINIMUM 2%. CONFIRM EXISTING GROWING MEDIUM MEETS SPECIFICATIONS AND IS SUITABLE FOR RE-USE. FERTILIZE AS PER GROWING MEDIUM TEST RESULTS. CONFIRM UNDERGROUND SERVICES LOCATIONS PRIOR TO EXCAVATION. ALL PLANTING PITS SHALL BE DUG BY HAND WHERE UNDERGROUND SERVICES MAY EXIST. 6" 6" 6" CONCRETE BORDER FROM BENCH FOOTING 6" DEPTH CONCRETE USE TAMPER PROOF HARDWARE FOR MOUNTING SITE FURNISHING AS SPECIFIED ON LANDSCAPE PLAN EDGING AS SPECIFIED ON LANDSCAPE PLAN 6" DEPTH CONCRETE 6" COMPACTED CRUSHED GRAVEL SITE FURNITURE MOUNTING USE TAMPER PROOF HARDWARE SEE MOUNTING DETAIL CONCRETE ANCHOR IN DRILLED HOLE NOTE: SITE FURNISHINGS TO BE INSTALLED TO MANUFACTURERS SPECIFICATIONS CONCRETE PAD /SIDEWALK DO NOT CUT LEADER GROWING MEDIUM DEPTH AS PER SPEC. FILL PLANTING HOLE WITH GROWING MEDIUM TO 2/3RDS FULL, THEN REMOVE STRAPPING, CUT ALL BINDING MATERIAL, AND FOLD BURLAP INTO BOTTOM OF HOLE. COMPACT CROWING MEDIUM TO 85% PROCTOR DENSITY, TO REMOVE AIR POCKETS. COMPACT SUBGRADE UNDER ROOTBALL TO 95% PROCTOR DENSITY, TO PREVENT TREE SETTLING. AFTER COMPACTION, SCARIFY SIDES AND BOTTOM OF PLANTING PIT. FINISHED GRADE OF PLANTING, INCLUDING BARK MULCH, TO BE EQUIVALENT TO NURSERY GROWN GRADE. FINISH GRADE TO MEET TOPS OF CURBS, WALKS AND DRIVEWAYS, ETC. GATOR BAG TO BE PLACED SURROUNDING TREE STAKE SET TREE PLUMB. USE TWO ROUND STAKES (50mm - 75mm DIA. P.T. WOOD), 2.0M IN LENGTH, EACH SET 1/3RD HT. BELOW GRADE. CLEAN CUT SOD EDGE GRADE FURNITURE BASE 4" CONCRETE 6" DEPTH OF COMPACTED GRAVEL, TO 95% PROCTOR DENSITY SAWCUT, 36" O.C. BOTH WAYS DEPTH TO 1" SAWCUT, 36" O.C. DEPTH TO 1 4 OF SLAB OR 1" INDUSTRIAL-GRADE METAL FENCING HEAVY DUTY HANDLE & HINGES AAMA 2603 COMPLIANT POWDER-COATING COLOUR OF FENCE TO BE APPROVED BY LANDSCAPE ARCHITECT 3" SQ. METAL POST • •• •• • • ••• • • ••• • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1" SQ. METAL VERTICALS 5" O.C. MAX.(MAX. 4" GAP) • •• •• • • ••• • • ••• • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1/2" METAL CROSS PIECES - WELDED 2" SQ. METAL GATE FRAME • •• •• • • ••• • • ••• • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1" SQ. METAL PICKETS • •• •• • • ••• • • ••• • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • 3" SQ. METAL/ POST • •• •• • • ••• • • ••• • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • SET IN CONCRETE FOOTING (9" DIAM. X 18" DEEP) 1500mm DIA. X 50mm DEEP WELL FORMED IN TOPSOIL FOR FIRST YEAR WATERING. 50mm DEPTH BARK MULCH APPLIED AT A MINIMUM DISTANCE OF 150mm FROM TRUNK. 30" TYP. 1.8M HT. FENCE 1:25 3 PATIO SCREEN 1:25 5 VARIES 4' 3.5" 4X4 POST 1"X4" PICKETS; 5" O.C. (CLOSED TOPS) 5" 1/3RD POST HT IN CONC. FOOTING 6" COMPACT GRAVEL COMPACT SUBGRADE NOTE 1. METAL MATERIAL: ALUMINUM TO BE POWDER COATED 2. ALL HARDWARE TO BE HOT DIPPED GALVANIZED, MEDIUM GAUGE. 3. GATE HARDWARD TO BE CHOSEN BY OWNER. 4. INSTALL PER MANUFACTURER'S INSTRUCTIONS. 6' 6' 5" 4X4 POST 1"X4" PICKETS; PICKETS ARE ABUT TO EACH OTHER. (CLOSED TOPS) 1/3RD POST HT IN CONC. FOOTING 6" COMPACT GRAVEL COMPACT SUBGRADE NOTE 1. MATERIAL CAN BE ALUMINUM OR COMPOSITE. TO BE DECIDED BY DEVELOPER. 2. ALL HARDWARE TO BE HOT DIPPED GALVANIZED, MEDIUM GAUGE. 3. GATE HARDWARE TO BE CHOSEN BY OWNER. 4. INSTALL PER MANUFACTURER'S INSTRUCTIONS. 5" PAVING OVER TREE ROOTS 8 1:12 ARBORIST TO BE ON SITE DURING ALL WORK IN TREE PROTECTION ZONES UNDISTURBED EXISTING SUBGRADE DO NOT CUT TREE ROOTS TENSAR BX GEOGRID 100 MM CONCRETE SIDEWALK SURFACING 100 MM COMPACTED GRANULAR FILL FEATHER OUT EDGE WITH SOIL TO MEET EXISTING GRADE THICKEN CONCRETE FOR EDGE SUPPORT 18"X18"X1 5 8 " CONCRETE STEPPING STONE REFER TO MUTUAL MATERIALS FOR SPEC. 1" SILICA SAND SETTING BED 4" DENSE GRADE AGG. BASE NON-WOVEN FILTER FABRIC PREPARED SUBGRADE CHAMOMILE STEPPING STONE 9 1:12 CHK'D: 24068-5.ZIP DRAWN: DESIGN: SCALE: DATE: PMG PROJECT NUMBER: 24-068 OF 6 DRAWING TITLE: PROJECT: DRAWING NUMBER: REVISION DESCRIPTION NO. DATE DR. 4505, 4515, 4525 & 4535 200 STREET SEAL: Copyright reserved. This drawing and design is the property of PMG Landscape Architects and may not be reproduced or used for other projects without their permission. c CLIENT: LANDSCAPE Burnaby, British Columbia, V5C 6G9 p: 604 294-0011 ; f: 604 294-0022 Suite C100 - 4185 Still Creek Drive ARCHITECTS 1 24.JUL.26 ISSUED FOR DP 2 24.SEP.10 NEW SITE PLAN/CITY COMMENTS RJ 3 24.OCT.03 BIKE RACK RELOCATION YR 4 24.OCT.07 NEW SITE PLAN JR 5 24.OCT.28 NEW SITE PLAN RJ 6 25.JAN.07 TREE MGT PLAN AR 7 25.MAR.03 CITY COMMENTS YR 27 UNIT TOWNHOUSE DEVELOPMENT CITY OF LANGLEY, BC LANDSCAPE DETAIL L6 24.JUN.06 AS SHOWN RJ RJ YR --- page 74 --- EXPLANATORY MEMO Update to Advisory Design Panel (ADP) Langley City Centre SkyTrain Station: Design Update by Station Contractor (Design Advisory Process or ‘DAP’) ADP Comments and Design Responses by Station Contractor This memo outlines updates the SkyTrain Station design/build contractor, South Fraser Station Partners (‘SFSP’), has made to the Langley City Centre (LCC) SkyTrain Station design in response to ADP recommendations from the September 11, 2024 ADP meeting. Below are the numbered ADP recommendations, and how SFSP has responded to these comments in the attached 2 nd DAP design submissions (submitted February 2025). 1. Strengthen the engagement between the CRU, the station interior, and the southeast plaza (i.e. with additional glazing). SFSP has updated the south facing façade of the Commercial Retail Unit (CRU) to include clear glazed windows. This will enable occupants inside the CRU, which may be a coffee shop and/or convenience retailer, to see all of the plaza areas surrounding the CRU and south-east LCC Station entrances. This will improve sightlines and enable passive and active surveillance of activities in the plazas, which in turn will help to improve pedestrian and transit user safety and reduce loitering. The on-site Transit Police Hub will also provide adjacent security support. 2. Reconsider the location and design of the exit stair (e.g. moving it to the east side of the station) to avoid CPTED issues and improve access. SFSP has noted the stairs are designed and located based on BC Building Code requirements, and comply with the Project Agreement, and has elected not to change the location and design of the exit stair. 3. Provide additional attention to the tail tracks to ensure they’re an integrated and attractive part of the overall station design, including with art. A public art procurement process is underway, for art pieces to be displayed inside or on SkyTrain station buildings, and staff anticipate an update on the progress of this process later this year. The north and south walls of the LCC Station have been identified as potential locations for Indigenous Culture Art, subject to final artwork confirmation. --- page 75 --- SFSP has also added a unique coloured glass treatment inside the LCC Station (‘red’ inspired by red coloured BC Electric trains and historic brick and barn character) and plaza paving pattern to differentiate the LCC Station from other stations along the SkyTrain extension. While it is suggested that art pieces could be affixed to the Station tail track and columns at the southeast end of the LCC Station, staff note that this may be possible but will likely require additional City funds and permissions beyond the current project scope. This being said, staff are investigating the potential for public art being located at the east end of the existing Acacia Lane near the south- east LCC Station entrance and future 203A Street extension, to create additional visual interest and character at a key SkyTrain system entry point (‘the gateway’) and high pedestrian volume area. 4. Incorporate automatic doors into the bike parkade. Staff will provide an update regarding operation of the bike parkade and micromobility hub once further information is available. 5. Confirm if a pedestrian crosswalk will be provided over the northwest bus exchange entrance. Crosswalks are included at all transit exchange entrance/exit points. 6. Add more shade trees to the landscape plans, especially in line with the station entrance paving treatments. Additional shade trees have been provided in the south plaza, along with reconfigured service vehicle parking and plaza paved area. See staff commentary below for suggested updates to proposed landscaping beds around plaza trees at the southeast end of the LCC Station building and adjacent plaza. 7. Enhance the appearance of the PPS (e.g. paneling shading and texture, art). SFSP has updated the façade with concrete panels of varying sizes, shades and textures, similar to LCC Station, and also updated the weather protection ‘brow’. Staff also note that the PPS building requires Air Handling Units (AHUs) to be installed on the roof to provide adequate cooling for the electrical systems inside the building. The design of the AHU ductwork is still in process and staff may request the installation of a screening feature along the PPS roofline to limit the visual impact of this ductwork on the Industrial Avenue streetscape. --- page 76 --- 8. Ensure durability and vandalism-resistance of project materials (e.g. unit pavers, walls). SFSP is proposing to use a set of concrete panels of varying size, texture and shades to add visual interest to the north and south Station walls. These panels will also be treated with anti-graffiti coatings up to 3 metres above grade. Plaza pavers have been selected for durability. 9. Ensure adequate lighting is provided throughout the entire station site and is kept on 24/7. Staff note this is being reviewed with SFSP as a part of detailed civil design and Station finishing, to ensure there is adequate street, plaza, transit exchange and Station lighting. 10. Review plaza and landscaping design for rain water management and drainage (i.e. preventing pooling, ice build-up, etc.). Staff note this is being reviewed with SFSP as a part of detailed civil design to ensure the drainage system and landscaping design follows City standards. Further staff design comments for follow-up by SFSP 1. Update landscape design in south plaza, between lane and CRU and adjacent plaza, to re-introduce paved surface and tree grates around the proposed trees, to ensure there is appropriate paved area for anticipated pedestrian traffic in this area. Staff note that a high volume of pedestrians will be entering and exiting the LCC Station from the 203A Street side (southeast corner of LCC Station), and grade level landscaping around the trees will negatively impact accessibility and block desired pedestrian pathways, resulting in pedestrians ‘cutting through’ and damage to landscaping beds which will add to plaza maintenance requirements. There may also be future public art and wayfinding objects in this area that will attract pedestrian traffic and interest, and paved area is the recommended surface treatment in these conditions. Staff will work with SFSP to see if there are ground level landscaping opportunities elsewhere in the plaza and/or Station site. 2. Ensure trees in south plaza are correct species for creating vertical character, shade and enabling clear sightlines through plaza trees (ie. trees will grow tall and can be limbed up to at least 2 m above grade to ensure branches don’t block sightlines across plaza). --- page 77 --- Attachments 1. 2 nd submission DAP Langley City Centre SkyTrain Station drawing package 2. 2 nd submission DAP Propulsion Power Station (PPS) drawing package 3. ADP report from September 11 2024 meeting (as background information) Prepared by: __________________________ Carl Johannsen, RPP MCIP Director of Development Services --- page 78 --- 1 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Langley City Centre Station Station Design Submission #2 Surrey Langley SkyTrain Conceptual rendering, subject to change; does not reflect future transit-oriented development --- page 79 --- 2 Surrey Langley SkyTrain Langley City Center Station – Station Design Submission #2 Revision Record Rev Description Originator Checker Approver Date A Initiating Station Design Submission J. Liu B. Bilodeau J. Van Der Wal 2024-06-28 B Station Design Submission #2 J. Liu B. Bilodeau O. Nassar 2025-02-10 C D Prepared by: Francl Architecture Inc. 970 Homer Street, Vancouver, BC, V6B 2W7, Canada (604) 688-3252 franclarchitecture.com Client: Project Team: --- page 80 --- 3 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Table of Contents Project Overiew 6 Systemwide Design Brief 8 What We Heard 9 Design Rationale – Station Materiality 11 Systemwide Design Enhancements 12 Making Each Station Unique 13 Systemwide Design Enhancements 14 Site Materials and Finishes 15 Landscape Enhancements 17 Design Rationale – Site Furnishing Concept 18 Langley City Centre Station (203 Street) 19 Station Site & Context – Urban Context & Development 20 Station Drawings 23 Making Each Station Unique 24 Design Enhancements 25 Fire Access Plan 26 Accessibility & Connectivity Plan 27 Concourse Plan 28 Platform Plan 29 Roof Plan 30 North, West, South, East Elevations 31 Sections 32 Landscape 33 Urban Design & Hardscape Plan 34 Illustrative Landscape Plan 35 Transit Exchange 36 Civil Site Plan 37 Transit Exchange Rendering 38 --- page 81 --- Langley City Centre Station – evening render Conceptual rendering, subject to change; does not reflect future transit-oriented development --- page 82 --- Langley City Centre Station – alternate day render view Conceptual rendering, subject to change; does not reflect future transit-oriented development --- page 83 --- Langley City Centre Station – wall caldding pattern rendering --- page 84 --- Project Overview --- page 85 --- 8 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Surrey Langley SkyTrain The Surrey Langley SkyTrain will extend the Expo Line 16 kilometres from King George Station in Surrey to 203 Street in Langley City. The Surrey Langley SkyTrain will improve regional connections and provide fast, frequent, and reliable transit service for people and businesses across Metro Vancouver, especially south of the Fraser River. Once opened, the commute from Langley City Centre to King George Station will be 22 minutes, saving the average transit commuter approximately 40 minutes a day, relieving congestion along Fraser Highway. Project Overview --- page 86 --- Systemwide Design Brief --- page 87 --- 10 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Between June 18 and June 30, 2024, the Province invited feedback on the designs of the Surrey Langley SkyTrain stations. • 74% of respondents noted that they are satisfied with the overall station designs. • 80% of respondents indicated that they are satisfied with the passenger experience features of the stations Feedback helped to inform updated station designs. The top comments are summarized below: What We Heard Washrooms accessible with assistance of a SkyTrain attendant Dedicated stall for Transit Police at every station Secure Bike Parkade at every station Topic What We Heard Responses Station Design Interest in station designs that reflect the neighbourhood character. In addition to the featured canopy design, each station and plaza will incorporate design variations to reflect neighbourhood context and character. Washrooms Desire for accessible washrooms at stations. The station designs follow TransLink’s guidelines for washrooms. Washrooms are located in the Fare Paid Zone at all stations, and are accessible with the assistance of a SkyTrain attendant. In addition, TransLink is exploring open washrooms at Bakerview-166 Street and Langley City Centre stations. The future of open washrooms at both stations are at the discretion of TransLink. Parking Desire for park and ride facilities around stations. Park and Ride facilities are not part of the project, as one of the project goals is to reduce vehicle use, congestion, and greenhouse gases. TransLink will update local bus connections in advance of the SkyTrain opening to make it easier for people to access the new SkyTrain extension. Municipalities may identify parking opportunities around the station areas, including on-and off-street parking. For example, the City of Surrey is planning to provide 300 new Park and Ride spaces within a 5 to 7-minute walk of a SkyTrain station, including near Green Timbers, 152 Street, Fleetwood and Bakerview-166 Street stations. Safety Interest in Transit Police pres- ence and dedicated parking stalls for police at stations. Reserved parking for Transit Police will be available at each station, and a Transit Police hub accessible to the public will be located at Langley City Centre Station. In addition, there will be Transit Police administrative offices at 152 Street, Bakerview-166 Street, Hillcrest-184 Street, and Willowbrook Stations. Concern about the security of bike parkades. Every station will have an enclosed bike parkade. The design and operation of the bike parkades will follow TransLink guidelines, including restricted access to registered bike parkade users, 24/7 secure access, and CCTV monitoring. The Station Design Public Engagement Summary Report (June 2024) is available online. --- page 88 --- 11 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain What We Heard Example of tactile wayfinding tile in contrasting colour, leading to key destination Escalator and stairs fitted to enhance safety and passenger flow Island platforms for safe cyclist routes and pedestrian bus stops. Topic What We Heard Responses Accessibility Provide a suitable alternative in case of an escalator or elevator outage. Elevators and stairs can be used in the event of an escalator outage. In case of an elevator outage, passengers may be directed by a SkyTrain attendant to ride to the next station and back again to access the elevator on the other platform. At 152 Street Station, a second elevator is available at the station entrance on 152 Street, which can be used in the event of an elevator outage. At Green Timbers and Fleetwood stations, the design allows for the installation of a secondary elevator between the ground and mezzanine levels, if needed in the future. Ensure stations exceed basic accessibility building code requirements and best practices for inclusive design. Station design will meet or exceed TransLink accessibility standards in areas such as wayfinding, tactile warning, and washroom accessibility. For example, a greater number of directional indicators will be in place at the concourse and platform levels than are found in older stations. Gender-neutral washrooms are also being introduced at a few locations for improvement in inclusive design. Active Transportation Ensure a safe design for bike paths in front of stations and bus stops to avoid conflicts between cyclists and passengers. Bike paths adjacent to bus stops will follow the BC Active Transportation Design Guide, using an island platform for bus stops. An island platform separates bike paths from bus stops and provides space for bus passengers to queue for the bus. Sustainability and Environment Use native planting and trees to provide natural shading. Plantings and trees are selected for resilience and maintainability. Plant selections will provide natural shading and visual interest throughout the year. Native, drought-tolerant species are prioritized and interplanted with other climate resilient species. A high-efficiency drip irrigation system minimizes water consumption. Incorporate measures to prevent bird strikes. Bird-safe patterns will be applied to glass in proximity to bird habitat areas for Green Timbers Station. The Station Design Public Engagement Summary Report (June 2024) is available online. --- page 89 --- 12 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Heavy timber Burquitlam Station Coquitlam Central Station Moody Centre Station Metal panel Concrete panel Spider clip & laminated glazing Slip-resistant field porcelain tile Perforated metal ceiling panel Glazed porcelain wall tile Wayfinding tile Exterior render view – rendering Interior render view – rendering 1 2 3 4 A B C D 1 3 4 2 Precedents B D C A Design Rationale Station Materiality (Exterior and Interior) Systemwide Design Brief --- page 90 --- 13 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Coloured glass Entrance canopy Coloured glass Pedestrian bridge (Green Timbers and 152 Street stations only) Systemwide Design Enhancements Colour adds visual interest and supports wayfinding Exterior panels enhance public realm Each station will feature coloured glass near elevators and along the platform waiting area. The coloured glass is waist height and visible from both the train and platform to enhance the passenger arrival experience. The colour is embedded in the glass, ensuring it remains vibrant over time. *configuration of coloured glass is subject to adjustment Each station will feature unique, durable, and fire-resistant concrete panels. Panels can be customized with different sizes, layouts, shades, and textures to provide a distinct look. The panels also have anti-graffiti properties, ensuring long-lasting quality with minimal maintenance. Panels add visual appeal for pedestrians, cyclists, and transit users, and enhance the surrounding experience without compromising safety or durability. Coloured glass visible from inside and outside of station Coloured glass along the platform waiting area Coloured glass next to elevator door Coloured glass visible from train and on platform Shade and texture Different shades of concrete, highlighted with textured panels create visual interest. Panel configurations Creative layout of panels brings an extra layer of playfulness to the overall look of the station, even in the back of the house and service parking areas. Panel sizes Standard and large format panels reduce long-term maintenance costs and provide consistency across the SkyTrain system. 1.25m x 2.5m 1.25m x 1.5m --- page 91 --- 14 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Making Each Station Unique The stations are part of a cohesive design family, with distinct features to make each one unique. Design elements are carefully crafted to support a positive passenger experience, and welcoming, memorable environment. Together, these elements contribute to an enhanced urban experience, creating a sense of place for both passengers and the surrounding community: Green Timbers Station 152 Street Station Fleetwood Station Bakerview-166 Street Station Hillcrest-184 Street Station Clayton Station Willowbrook Station Langley City Centre Station Welcoming entrance canopy geometry Colour reflecting station context Subtle variation in exterior wall panel Different planting palette at station plazas Accent paver treatment around station plazas --- page 92 --- 15 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Systemwide Design Enhancements The use of colour will enhance the unique character of each station. Proposed colours are inspired by the local landscape, history and surroundings. Final colour selections will consider the following: • First Nations input, values, and connections • Accessibility needs • Station art • Community feedback • Wayfinding signage Station Design Inspiration Green Timbers Station Situated in an urban forest, Green Timbers Station is a natural candidate for green accents. This will also help soften the visual impact of the station on its surroundings. 152 Street Station Inspired by the pink and purple hues of cherry blossom trees at the station site, the proposed accent colour for 152 Street Station is purple. Fleetwood Station Red is proposed as the accent colour for Fleetwood Station. It recognizes the neighbourhood’s namesake Lance Corporal Thomas Fleetwood who, alongside thousands of Canadians, fought in WWI. The red reflects the poppy, a symbol of courage and remembrance. Station Design Inspiration Bakerview-166 Street Station Passengers will enjoy sweeping views of Mount Baker from Bakerview-166 Street Station, as well as views of the North Shore coastal mountains. This station’s accent colour will be blue, reflecting the snow and ice vistas. Hillcrest-184 Street Station Hillcrest-184 Street Station is located at the crest of the hill overlooking the Serpentine River Valley, an area of significance to First Nations, as well as an important agricultural area. Golden accent colours allude to crops and honey found in the area. The golden colour also references the autumn foliage found near the station. Clayton Station Clayton Station is in a residential area surrounded by parks, including North Creek Duck Pond. The station will feature blue/green accent colours, referencing the blue/green feathers of waterfowl in the area, as well as the blue/green waters of the pond and other nearby creeks. Willowbrook Station Inspired by the willow tree and neighbourhood vegetation representing family, human connection and growth, Willowbrook Station’s accent colour will be moss green. Langley City Centre Station The BC Electric Railway stop at Langley Prairie was located one block southeast from the future station site. Images of the brightly-coloured trains, along with barns and brick storefronts in the area inspired barn red for Langley City Centre’s accent colour. --- page 93 --- 16 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain System-wide paving treatments Station specific paving treatment Distinct paving patterns at key station plaza locations enhance station identity and contribute to place-making, with variations in pattern and colour reflecting the station’s architecture, function and context. Consistent decorative paving treatments at main entrances and circulation areas provide clear wayfinding across the system. Green Timbers Station Hillcrest-184 St. Station 152 St. Station Clayton Station Fleetwood Station Willowbrook Station Bakerview-166 St. Station Langley City Centre Station Directional accent pavement at main entrances Industrial Avenue wave pattern at Langley City Centre Station *Specific patterns may be adjusted in detailed design Site Materials and Finishes --- page 94 --- 17 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Landscape Enhancements The planting design emphasizes resilience, sustainability and cohesiveness. Landscaping will create seasonal interest and enhance the character of each station. Both ornamental and native species will be considered for their drought tolerance, hardiness, and adaptability to local conditions. Final planting selections will also consider First Nations input. Trees Shrubs Western Hemlock Tsuga-heterophylla Otto Luyken Laurel Prunus laurocerasus ‘Otto Luyken’ Oregon Ash Fraxinus Latifolia Redflower Currant Ribes Sanguineum Saskatoon Serviceberry Amelanchier alnifolia Deer Fern Blechnum spicant Pacific Madrone Arbutus menziesii Daylilies Hemerocallis Stella ‘d’oro Bird Cherry Prunus padus Fountain Grass Pennisetum setaceum Ponderosa Pine Pinus-ponderosa Lily Turf Liriope muscari Quaking Aspen Populus tremuloides Rhododendron Rhododendron sp Mountain Hemlock Tsuga-mertensiana Vine Maple Acer circinatum Western Interior Birch Betula occidentalis Winter Daphne Daphne odora Douglas Fir Pseudotsuga-menziesii Littleleaf Boxwood Buxus microphylla Pacific Dogwood Cornus-nuttalii Fragrant Sweet Box Sarcococca confusa Pacific Crabapple Malus-fusca Privet Honeysuckle Lonicera-Pileate Western White Pine Pinus-monticola Japanese Holly Ilex crenata Paper Birch Betula-papyrifera Evergreen Huckleberry Vaccinium ovatum Western Red Cedar Thuja-Plicata Flowering Hydrangea Hydrangea macrophylla --- page 95 --- 18 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Systemwide Design Brief Design Rationale Site Furnishing Concept Bike Racks Corridor-wide Landscape Forms - Ring Stand Alone Bench Corridor Wide Landscape Forms - Generation 50 NO back rest 3 intermediate armrests Waste Receptacles Corridor-wide Landscape Forms - Chase Park dual stream - Black “Backed” Bench Corridor Wide Landscape Forms – Generation 50 back rest 3 intermediate armrests Benches Corridor-wide Landscape Forms – Generation 50 Collection (or similar) Wall Top Bench Corridor Wide Landscape Forms – Generation 50 back rest 3 intermediate armrests Site Furnishings Benches Types Project Requirements: Proposed Design: • Standardized line-wide design with same dimensions and components • Low 300mm H wall (CPTED) • CIP Concrete Wall or Precast Modular Wall – TBC • Directional – 150mm & 450mm TH walls • Bench at seat Height 450mm • Off-the-shelf bench top from same line-wide collection • Integrated LED Lighting opportunities --- page 96 --- Langley City Center Station (203 Street and Fraser Highway) --- page 97 --- 20 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Station Site & Context Urban Context & Development North West South East South West North East Key plan 1 1 3 2 4 2 3 4 --- page 98 --- 21 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Cascades Casino Valley Centre Shopping Mall Logan Ave City Centre Square Langley City Hall 203 St Fraser Highway Station Site & Context Urban Context & Development North elevation streetscape Aerial view Site context plan 203 Street City of Langley Official Community Plan 2021 City of Langley Official Community Plan 2021 Rendering does not reflect future transit-oriented development Legend Mixed Employment Legend Historic Downtown Transit Oriented Core Civic Industrial Low Rise Residential Transit Oriented Residential Station Plaza To King George Station To Casino --- page 99 --- 22 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Station Site & Context Urban Context & Development This is the terminus station located at the heart of City of Langley, the surrounding land use is designated as transit-oriented Core by the OCP, permitting the highest densities of mixed-use residential commercial development. A new Park/Open Space is indicated for the lands immediately south of the station which may be developed to include outdoor recreation spaces and small-scale institutional use. The station site is currently undeveloped, and the surroundings are characterized by low-density light industrial and commercial uses. The public realm design will respond to the function of the station as both the terminus of the SLS system and an integrated transit hub. Generous Circulation Zones around the perimeter will support bus transit interchange as well as facilitating connection to the municipal pedestrian network and future adjoining developments. Decision zones are clearly delineated as a systemwide surface paving treatment to connect the station entrances with Circulation Zones. Destination zones are located strategically at the station entrances and to the south, offering a variety of flex and opportunity uses for CRU, for the public plaza interface with future developments to the south, and to support informal meeting and gathering for transit users and neighbour residents. The station design is a unique centre-platform configuration on the SLS system, offering two double-sided through entrances at both ends of the station to support the Transit Exchange to the north and a public plaza to the south. The double entrances will be defined by signature canopy shapes that will serve as primary wayfinding signifiers, with the wood ceiling soffit continuing through the station entrance zone to visually connect all sides of the plaza interface with the heart of the station en- trances. Aligned with design team’s design parti to differentiate the transit specific elements, the canopy coverage for the CRU will be visually and physically separated from the station entrance canopy through a change in materiality, assembly, and shape. Langley City Centre Station --- page 100 --- Station Drawings Langley City Centre Station --- page 101 --- 24 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain The stations are part of a cohesive design family, with distinct features to make each one unique. Design elements are carefully crafted to support a positive passenger experience, and welcoming, memorable environment. Together, these elements contribute to an enhanced urban experience, creating a sense of place for both passengers and the surrounding community: Green Timbers Station 152 Street Station Fleetwood Station Bakerview-166 Street Station Hillcrest-184 Street Station Clayton Station Willowbrook Station Langley City Centre Station Welcoming entrance canopy geometry Colour reflecting station context Subtle variation in exterior wall panel Different planting palette at station plazas Accent paver treatment around station plazas Making Each Station Unique --- page 102 --- 25 Surrey Langley SkyTrain Langley City Center Station – Station Design Submission #2 Langley City Centre Station – design enhancement Platform and bridge enhanced with coloured glass panel Station specific design on exterior cladding panels Plaza paving pattern reflecting station location A A B B C C --- page 103 --- Fire Access Plan S TD SHELTER REMOVED FROM 56AVE TO BE RELOCATE TO PU3 PU4 BC1 T1 DO2 DO3 DO4 PU1 PU2 HANDYDART LO1 LO2 LO3 LO4 LO6 LO7 LO8 LO9 LO5 203 STREET INDUSTRIAL AVE. ACACIA CRESCENT TRANSIT EXCHANGE SERVICE PARKING (14 SPACES) SERVICE PARKING (4 SPACES) FIRE APPARATUS TAIL TRACK ABOVE TAIL TRACK ABOVE PRIMARY FIRE ACCESS BIKE LANE GUIDEWAY ABOVE MIN. 5.0m CLEAR HEIGHT REQUIRED FOR FIRE DEPARTMENT VEHICLE ACCESS UNDERNEATH THE GUIDEWAY 203A STREET 203A STREET NEW EXTENSION WEST CONCOURSE ENTRANCE EAST CONCOURSE BUS ACCESS ONLY ENTRANCE ENTRANCE TD = 22 m FIRE DEPT. ACCESS TO BLDG TD = 15 m TD = 42m TD = 15m TRANSIT EXCHANGE AND LAYOVER PARKING IS NOT INTENDED AS A FIRE DEPARTMENT ACCESS ROUTE 31.11 m 40.75 m 14.46 m 14.55 m 29.65 m PROJECT SCOPE BOUNDRY CRU CRU - BOH BIKE PARKING PAID PAID UNPAID TD = 35m TRAVEL DISTANCE LEGEND LIMITING DISTANCE 0 HR FIRE SEPERATION 1 HR FIRE SEPERATION 2 HR FIRE SEPERATION SPRINKLER PROTECTION CLEAN AGENT FIRE SUPPRESSION SYSTEM FIRE HYDRANT SPRINKLER/STANDPIPE CONNECTION STANDPIPE HOSE CONNECTION FIREFIGHTER COMMAND POST ENTRANCE / EXIT FIRE DEPARTMENT VEHICLE ACCESS PATH ISSUE/REVISION REFERENCES CONSULTANTS REGISTRATION KEY PLAN PROJECT DRAWING INFORMATION DRAWN BY DESIGNED BY CHECKED BY APPROVED BY PROJECT NUMBER SHEET TITLE DRAWING NUMBER SURREY LANGLEY SKYTRAIN EXPANSION FIRE ACCESS PLAN SLS-203-A-100-DAP LANGLEY CITY CENTRE STATION 1:500 (11X17) - 1:250 (ANSI D) FIRE ACCESS PLAN 1 PN TN N SCALE: 0 12.5 m 2.5 m 1:250 CIVIC ADRESS - 5724 203 STREET, V3A 1W3 I/R DATE BY DESCRIPTION APPR A 2024/05/17 INITIATING DESIGN SUBMISSION #1 B 2025/02/10 STATION DESIGN SUBMISSION #2 DAP REVIEW SCOPE --- page 104 --- 27 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Accessibility & Connectivity Plan Legend Langley City Centre Station features: • Designated accessible pathways at the station and within the plaza • Improved accessible wayfinding, including tactile and contrasting colour tiles • Washroom available within the Fare Paid Zone. TransLink is exploring an open washroom at this location • Secure enclosed bike parkade • Transit Police Hub office, open and accessible to the public Example of tactile wayfinding tile in contrasting colour at the platform Platform floor plan Concourse floor plan --- page 105 --- P1 P2 1 2 3 4 5 6 7 8 9 10 11 12 13 TP TP TS TS CMBC CMBC BCRTC BCRTC BCRTC BCRTC BCRTC BCRTC BCRTC BCRTC NRV NRV NRV NRV ENTRANCE TRANSIT EXCHANGE BUS ACCESS ONLY 203A STREET NEW EXTENSION ACACIA CRESCENT 203 STREET INDUSTRIAL AVE. END OF PLATFORM END OF PLATFORM GUIDEWAY ABOVE ENTRANCE ENTRANCE ENTRANCE 123250 PLATFORM LENGTH 82500 CL OB DAP IB WEST CONCOURSE EAST CONCOURSE PROJECT SCOPE BOUNDRY CRU CRU - BOH BIKE PARKING PAID PAID UNPAID GENDER NEUTRAL WASHROOM NOTE: FOR GENERAL GRADING REFER TO LANDSCAPE AND HARDSCAPE PLAN LEGEND PUBLIC ACCESS NON-PUBLIC ACCESS (SERVICE ROOMS) ISSUE/REVISION REFERENCES CONSULTANTS REGISTRATION KEY PLAN PROJECT DRAWING INFORMATION DRAWN BY DESIGNED BY CHECKED BY APPROVED BY PROJECT NUMBER SHEET TITLE DRAWING NUMBER SURREY LANGLEY SKYTRAIN EXPANSION CONCOURSE PLAN SLS-203-A-201-DAP LANGLEY CITY CENTRE STATION 1:400 (11X17) - 1:200 (ANSI D) CONCOURSE PLAN 1 PN TN N SCALE: 0 12.5 m 2.5 m 1:250 I/R DATE BY DESCRIPTION APPR A 2024/05/17 INITIATING DESIGN SUBMISSION #1 B 2025/02/10 STATION DESIGN SUBMISSION #2 --- page 106 --- P1 P2 1 2 3 4 5 6 7 8 9 10 11 12 13 PLATFORM LENGTH 82500 ENTRANCE CANOPY BELOW CRU ROOF BELOW ROOF BELOW SERVICE WALKWAY SERVICE WALKWAY CRU ROOF ACCESSHATCH SERVICE WALKWAY SERVICE WALKWAY INBOUND PLATFORM OUTBOUND PLATFORM END OF PLATFORM END OF PLATFORM 123250 ENTRANCE CANOPY BELOW ENTRANCE CANOPY BELOW ENTRANCE CANOPY BELOW WP-1 WP-2 WP-3 WP-4 CENTRAL WAITING PLATFORM CENTRAL WAITING PLATFORM CL OB IB 19709.01 19709.01 19294.01 19294.01 BUS EXCHANGE GLASS CANOPY BELOW CRU GLASS CANOPY BELOW ISSUE/REVISION REFERENCES CONSULTANTS REGISTRATION KEY PLAN PROJECT DRAWING INFORMATION DRAWN BY DESIGNED BY CHECKED BY APPROVED BY PROJECT NUMBER SHEET TITLE DRAWING NUMBER SURREY LANGLEY SKYTRAIN EXPANSION PLATFORM PLAN SLS-203-A-202-DAP LANGLEY CITY CENTRE STATION 1:400 (11X17) - 1:200 (ANSI D) PLATFORM PLAN 1 PN TN N SCALE: 0 12.5 m 2.5 m 1:250 I/R DATE BY DESCRIPTION APPR A 2024/05/17 INITIATING DESIGN SUBMISSION #1 B 2025/02/10 STATION DESIGN SUBMISSION #2 --- page 107 --- P1 P2 1 2 3 4 5 6 7 8 9 10 11 12 13 PLATFORM LENGTH 82500 ELEVATOR OVERRUN PLATFORM ROOF BUS EXCHANGE GLASS CANOPY BELOW CRU ROOF BELOW CRU GLASS CANOPY BELOW PROPOSED LOCATION OF ROOF HATCH PLATFORM WINDSCREEN ELEVATOR OVERRUN CRU ROOF ACCESSHATCH PLATFORM WINDSCREEN END OF PLATFORM END OF PLATFORM 123250 CL OB IB PLATFORM ROOF ENTRANCE CANOPY BELOW ENTRANCE CANOPY BELOW ENTRANCE CANOPY BELOW ENTRANCE CANOPY BELOW 0.5% 0.5% 0.5% 2.0% 2.0% 2.0% 2.0% ISSUE/REVISION REFERENCES CONSULTANTS REGISTRATION KEY PLAN PROJECT DRAWING INFORMATION DRAWN BY DESIGNED BY CHECKED BY APPROVED BY PROJECT NUMBER SHEET TITLE DRAWING NUMBER SURREY LANGLEY SKYTRAIN EXPANSION ROOF PLAN SLS-203-A-203-DAP LANGLEY CITY CENTRE STATION 1:400 (11X17) - 1:200 (ANSI D) ROOF PLAN 1 PN TN N SCALE: 0 12.5 m 2.5 m 1:250 I/R DATE BY DESCRIPTION APPR A 2025/02/10 STATION DESIGN SUBMISSION #2 --- page 108 --- CONCOURSE EL.11.500 PLATFORM EL.20.655 ROOF EL.24.455 12955 2 4 1 4 CL OB IB 6 12600 4 1 6 4 CL OB IB 6300 6300 CONCOURSE EL.11.500 PLATFORM EL.20.655 ROOF EL.24.455 P1 P2 1 2 3 4 5 6 7 8 9 10 11 12 13 PLATFORM LENGTH 82500 STATION ENTRANCE STATION ENTRANCE 123250 12955 4 4 4 2 3 4 2 1 6 6 1 3800 9155 CONCOURSE EL.11.500 PLATFORM EL.20.655 ROOF EL.24.455 P1 P2 1 2 3 4 5 6 7 8 9 10 11 12 13 STATION ENTRANCE STATION ENTRANCE PLATFORM LENGTH 82500 123250 12955 4 4 6 3 4 2 1 1 4 6 4 CLEAR 3500 CLEAR 2770 CLEAR 3982 ISSUE/REVISION REFERENCES CONSULTANTS REGISTRATION KEY PLAN PROJECT DRAWING INFORMATION DRAWN BY DESIGNED BY CHECKED BY APPROVED BY PROJECT NUMBER SHEET TITLE DRAWING NUMBER SURREY LANGLEY SKYTRAIN EXPANSION ELEVATIONS SLS-203-A-301-DAP LANGLEY CITY CENTRE STATION 1:400 (11X17) - 1:200 (ANSI D) EAST ELEVATION 1 1:400 (11X17) - 1:200 (ANSI D) WEST ELEVATION 2 1:400 (11X17) - 1:200 (ANSI D) SOUTH ELEVATION 3 1:400 (11X17) - 1:200 (ANSI D) NORTH ELEVATION 4 Heavy Timber Metal Panel Concrete Panel Spider Clip & Laminated Glazing 1 2 3 4 STATION SPECIFIC FEATURE - CONCRETE PATTERN Metal Screen 5 Metal Louvers 6 TYP. H-1250 TYP. H-1250 TYP. W-1250 TYP. W-1250 TYP. W-1250 TYP. W-1250 TYP. W-1250 TYP. W-1250 TYP. W-1250 TYP. W-1250 TYP. W-1250 TYP. H-2500 SCALE: 0 12.5 m 2.5 m 1:250 I/R DATE BY DESCRIPTION APPR A 2024/05/17 INITIATING DESIGN SUBMISSION #1 B 2025/02/10 STATION DESIGN SUBMISSION #2 --- page 109 --- PLATFORM BUS EXCHANGE CANOPY CL OB 6300 6300 8898 CLEAR 3200 CLEAR 3450 CLEAR 3225 IB CONCOURSE EL.11.500 PLATFORM EL.20.655 ROOF EL.24.455 CONCOURSE PLATFORM 12955 CL OB CLEAR 3450 CLEAR 5025 CLEAR 4000 4860 3200 IB 12600 3800 9155 CONCOURSE EL.11.500 PLATFORM EL.20.655 ROOF EL.24.455 P1 P2 1 2 3 4 5 6 7 8 9 10 11 12 PLATFORM LENGTH 82500 CRU CONCOURSE CONCOURSE PLATFORM 12955 111250 BIKE PARKADE CLEAR 6390 CLEAR 3635 1153 CLEAR 3200 CLEAR 4000 CLEAR 3225 467 CLEAR 2777 3982 CLEAR 3771 CLEAR 2441 CLEAR 3191 9155 3800 ISSUE/REVISION REFERENCES CONSULTANTS REGISTRATION KEY PLAN PROJECT DRAWING INFORMATION DRAWN BY DESIGNED BY CHECKED BY APPROVED BY PROJECT NUMBER SHEET TITLE DRAWING NUMBER SURREY LANGLEY SKYTRAIN EXPANSION SECTIONS SLS-203-A-401-DAP LANGLEY CITY CENTRE STATION 1:400 (11X17) - 1:200 (ANSI D) CROSS SECTION 2 2 1:400 (11X17) - 1:200 (ANSI D) CROSS SECTION 1 1 1:400 (11X17) - 1:200 (ANSI D) LONGITUDINAL SECTION 3 STATION SPECIFIC FEATURE - GLAZING COLOU NOTE: GLASS GUARD WITH COLOUR LAMINATION SCALE: 0 12.5 m 2.5 m 1:250 I/R DATE BY DESCRIPTION APPR A 2024/05/17 INITIATING DESIGN SUBMISSION #1 B 2025/02/10 STATION DESIGN SUBMISSION #2 --- page 110 --- Landscape --- page 111 --- Landscape Plan L31 L32 ENTRANCE ENTRANCE ENTRANCE ENTRANCE ACACIA CRESCENT INDUSTRIAL AVE. 203 STREET L36 L03 L23 PPUDO (10 SPACES) 203A STREET 203A STREET NEW EXTENSION BUS LAYOVER AND CHARGING AREA F03 FOOTPRINT OF BUILDING ABOVE B14 BCRTC NRV ENCLOSURE C/W TWO SETS OF BIFOLD GATES AND ONE MAN DOOR WAVE PATTERN DECORATIVE CONCRETE SPACE PROOFING FOR FUTURE CHARGING INFRASTRUCTURE SPACE PROOFING FOR FUTURE CHARGING INFRASTRUCTURE SERVICE PARKING TP TP TS TS CMBC CMBC BCRTC BCRTC BCRTC BCRTC BCRTC BCRTC BCRTC BCRTC L30 TN N NRV NRV NRV NRV L01 L01 L01 L01 L01 L08 L06 L44 STATION AND CRU NOTE: GRADING SPOT ELEVATIONS ARE INDICATIVES, DETAIL DESIGN TO BE SUBMITTED TO THE CITY FOR REVIEW AS PER THE MUNICIPAL AGREEMENT PROCESS. 11.255 11.344 11.221 11.338 11.359 11.300 11.208 11.025 11.204 11.049 11.147 11.132 11.326 11.332 11.363 11.231 11.082 11.346 PLAZA PAVING TREATMENT SUBJECT TO CHANGE WITHIN STREET ROW ZONE, CURRENTLY NOT INDICATED IN DAP PLAN. PAVING TYPE 1 CIP CONCRETE - DECORATIVE PAVING TYPE 2 CIP CONCRETE - STANDARD PAVING TYPE 3 CONCRETE UNIT PAVERS - PERMEABLE LEGEND DECIDUOUS TREE PLANTING BED 450mm FOR SHRUBS 900mm FOR TREES SMALL DECORATIVE TREE PAVING TYPE 4 EXPOSED AGGREGATE CIP CONCRETE 600mm W BANDS PAVING TYPE 5 CIP CONCRETE - COLOURED CHARCOAL LEGEND DECIDUOUS TREE SMALL DECORATIVE TREE PAVING TYPE 6 CIP CONCRETE - WAVE PATTERN PERMANENT LANDS TEMPORARY LANDS ISSUE/REVISION REFERENCES CONSULTANTS REGISTRATION KEY PLAN PROJECT DRAWING INFORMATION DRAWN BY DESIGNED BY CHECKED BY APPROVED BY PROJECT NUMBER SHEET TITLE DRAWING NUMBER SURREY LANGLEY SKYTRAIN EXPANSION LANDSCAPE & HARDSCAPE PLAN SLS-203-L-100-DAP LANGLEY CITY CENTRE STATION 1:500 (11X17) - 1:250 (ANSI D) LANDSCAPE & HARDSCAPE PLAN 1 KEYNOTE LEGEND B14 RAIL STATION VALIDATOR (RSV) F03 FIRE HYDRANT (FD) L01 OUTDOOR WASTE RECEPTACLE L03 BIKE RACKS L06 FUTURE SHARED MICROMOBILITY HUB L08 EXTERIOR GARBAGE ENCLOSURE L23 CONCRETE MOTI VAULT L30 BC HYDRO PAD-MOUNTED TRANSFORMER L31 CTRM VAULT WITH MANHOLE OPENING L32 TL VAULT WITH MANHOLE OPENING L36 SPACE FOR BCRTC GENERATOR L44 IRRIGATION POINT OF CONNECTION AND CONTROLLER SCALE: 0 12.5 m 2.5 m 1:250 I/R DATE BY DESCRIPTION APPR A 2024/05/17 INITIATING DESIGN SUBMISSION #1 B 2025/02/10 STATION DESIGN SUBMISSION #2 --- page 112 --- 35 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Decorative cast-in-place concrete pavement Exposed aggregate concrete bands Decorative wave pattern Unit paver pavement Cast-in-place concrete pavement 1 1 2 5 2 3 4 5 4 Illustrative Landscape Plan 3 --- page 113 --- Transit Exchange --- page 114 --- ,668(5(9,6,21 5()(5(1&(6 &2168/7$176 5(*,675$7,21 .(<3/$1 352-(&7 '5$:,1*,1)250$7,21 '5$:1%< '(6,*1('%< &+(&.('%< $33529('%< 352-(&7180%(5 6+((77,7/( '5$:,1*180%(5 6855(</$1*/(< 6.<75$,1 (;3$16,21 75$16,7(;&+$1*(3/$1 6/6$'$3 /$1*/(<&,7<&(175(67$7,21 31 71 1 6&$/(  P P  ,5 '$7( %< '(6&5,37,21 $335 $  67$7,21'(6,*168%0,66,21 203 ST 203A ST ACACIA CRESENT INDUSTRIAL AVE EXTENSION P O O L E G N A H C X E N T S 3 0 2 N O I T A T S E R T N E C Y T I C Y E L G N A L 0 1:250 10 m 2 m CLIENT PROJECT/DWG. NO: REV No. ENGINEER STAMP: DESIGNED BY: DRAWN BY: STATUS PACKAGE NO. ENG CHECK: APPROVED BY: REFERENCE DRAWINGS LEGEND: REF: DRAWING NUMBER DRAWING TITLE REVISIONS NO. DESCRIPTION DRW CHK APR YYYY/MM/DD 1 A 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 B C D E F G H I J I J E F G H A B C D This document has been prepared for the party which commissioned it and for specific purposes connected with the captioned project only. It may not be used, reproduced or relied upon by third parties or used for any other purpose, without express authorization of the author or commissioning party. We accept no responsibility, and denies any liability whatsoever for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties. DO NOT SCALE FROM THIS DOCUMENT. ALL MEASUREMENTS MUST BE OBTAINED FROM STATED DIMENSIONS. DRAFT SURREY - LANGLEY SKYTRAIN PROJECT LANGLEY CITY CENTRE STATION ROADS TRANSIT EXCHANGE PLAN SLS-203-A-102-DAP C DESIGN ADVISORY PROCESS G250SI C. LEE 2025/01/28 Y. HUANG 2025/01/28 P. CU 2025/01/28 H. SHARMA 2025/01/28 C ISSUED FOR DAP SB CL HS 2025/01/28 DAP REVIEW SCOPE --- page 115 --- 38 Langley City Center Station – Station Design Submission #2 Surrey Langley SkyTrain Transit Exchange Transit Exchange – rendering Conceptual rendering, subject to change; does not reflect future transit-oriented development --- page 116 --- --- page 117 --- Langley City Centre Station PPS Propulsion Power Substation --- page 118 --- 40 Langley C ity C enter Station – Station Design Submission #2 Surrey Langley SkyTrain PPS Site Plan --- page 119 --- 41 Langley C ity C enter Station – Station Design Submission #2 Surrey Langley SkyTrain PPS Elevations Mechanical units & ductwork subject to change Mechanical units & ductwork subject to change --- page 120 --- 42 Langley C ity C enter Station – Station Design Submission #2 Surrey Langley SkyTrain PPS Elevations Mechanical units & ductwork subject to change Mechanical units & ductwork subject to change Render illustrating opening day condition with 3 roof top units. Subject to change based on final design. --- page 121 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject : Langley City Centre SkyTrain Station ( 5710 - 5740 203 Street & 5673 203A Street ) File #: 6620.00 From: Anton Metalnikov, RPP, MCIP Planner Bylaw #: Doc #: Date: September 5, 2024 RECOMMENDATION: THAT this report be received for information . PURPOSE OF REPORT: To consider the form and character of the Langley City Centre (‘LCC’) SkyTrain station, proposed as part of the Surrey Langley SkyTrain (SLS) project being led by Transportation Investment Corporation (TIC) of the Province of British Columbia , and as designed by the Station contractor South Fraser Station Partners (SFSP) and project architect Francl Architecture Inc . POLICY: The LCC SkyTrain station is the sole SkyTrain station within the City of Langley , and is not subject to rezoning and/or a Development Permit . As part of the Development Advisory Process (DAP) agreed to between the City of Langley and TIC, the City has the right to provide non - binding input to TIC and SFSP on the design of the SkyTrain station and its site. As part of exercising this right, the City has elected to bring the project to the Advisory Design Panel (ADP) for its review , with the input received to be provided to TIC and SFSP along with previously compiled staff comments. --- page 122 --- To: Advisory Design Panel Date: September 5, 2024 Subject: Langley City Centre SkyTrain Station Page 2 Discussion: 1. Context The S LS project consists of a 16 - kilometre extension of the Expo Line, from its current terminus of King George Station in downtown Surrey to a new terminus in Downtown Langley City, with a total of 8 new stations. This new terminus station, which ha d previously been known as the “203 Street station” but since has been re named Langley City Centre (LCC) S tation , is projected to be one of the most well - used stations on the extension , as the ‘gateway’ into the regional rapid rail system and a catalyst for significant pedestrian activity & Transit - Oriented Development (TOD) . With the SkyTrain line running down Industrial Avenue in Langley City, the LCC s tation will be located on a large vacant site just east of its intersection with 203 Street. Langley City Centre SkyTrain Station & s ite context The City’s Official Community Plan (OCP) , adopted in 2021, supports the SkyTrain extension, both at a higher level to align the surrounding land uses with the significant access improvements and demand for homes, job spaces, and services created by the SkyTrain, and at a finer grain to ensure the station and guideway were desi gned in harmony with the expected buildings and public spaces nearby. T he OCP’s Policy 2.32.1 on SkyTrain stations and guideway design stated the City’s intent to collaborate with TransLink and the Province to ensure station entrances and surrounding areas are designed to maximize TOD opportunities, be safe, accessible, easy to use and inviting for SkyTrain users --- page 123 --- To: Advisory Design Panel Date: September 5, 2024 Subject: Langley City Centre SkyTrain Station Page 3 and include innovative art, lighting, landscaping, and public space elements to integrate the station into the urban fabric. Also, given the area south of the Station currently consists of an empty lot, a lane and the ‘back of house’ of single storey buildings along Fraser Highway (which ‘hide’ the future Station from the high - profile Fraser Highwa y/203 Street intersection ) , the attached OCP Appendix B: District Policies , and as illustrated below, set s out a vision for significant TOD that connects the S tation to Fraser Highway and seamlessly integrates SkyTrain into the City’s highly walkable Downtown . Key features of the OCP vision for the LCC Station include : • Relocating the existing transit exchange to the north side of LCC S tation ; • E xtending Industrial Avenue and 203A Street to ‘complete the grid’ ; • Design ating the area immediately south of the Station, including the lane and properties fronting Fraser Highway, for future TOD that is directly adjacent to the Station and includes active and safe pedestrian connection s between Station entrances and Fraser Highway , 203 Street , and 203A Street. T his is intended to create a vibrant and safe experience for SkyTrain users , and create a n attractive landmark destination , anchored by major plaza at Fraser Highway, that ties the Station to one of the City’s most visible and important intersections and is representative of the Station’s ‘ gateway ’ role . In order to facilitate this, t h e OCP requir es all areas/ properties south of the Station , including those on Fraser Highway, to be assembled into one comprehensively - planned TOD parcel ; • Ensuring that ground floor retail, with housing and offices above, is located adjacent to pedestrian areas and plazas, to provide the ‘eyes on the street’ and activity that supports a comfortable transit user experience ; and • Locating a community and/or transit police office on the S tation site , to further enhance site and area safety . --- page 124 --- To: Advisory Design Panel Date: September 5, 2024 Subject: Langley City Centre SkyTrain Station Page 4 On the strength of the City’s OCP policies staff worked closely with TIC during the Reference Concept Design (RCD) stage to ensure the basic Station design , that was eventually used in the process to retain a design - build contractor, include d a transit exchange on the north side of the Station and enabled future TOD between the S tation footprint and Fraser Highway . The successful contractor, SFSP , has developed a n LCC Station design that is consistent with the RCD. As shown in the attached drawing package (described in detail in the following section), the SFSP design includes a ‘temporary’ south plaza area that provides an open and landscaped public realm that will be in place for likely 5 to 10 years ( between opening day of SkyTrain service and eventual TOD redevelopment of the area as envisioned in the OCP ), and the design of the station south facade won’t prevent future adjacent development. 2. Design As noted above t he contractor’s design is closely aligned with the RCD and incorporates a number of driving factors including City policy and the operational requirements of the BC Rapid Transit Company (BCRTC, which operates the SkyTrain system) and the Coast Mountain Bu s Company (CMBC, which operates the bus system). These factors include the extension of Industrial Avenue and 203A Street, the inclusion of a bus exchange and layover area, and the accommodation of parking for staff of various associated agencies. The station is aligned diagonally through the site, with the station plaza (noted as ‘South Plaza’ on above site context map) surrounding it and expanding out to --- page 125 --- To: Advisory Design Panel Date: September 5, 2024 Subject: Langley City Centre SkyTrain Station Page 5 the southwest. This plaza is designed with a number of different treatments, including a saw - cut concrete pattern as the primary hardscape, a cast - in - place concrete mosaic highlighting the station entrances, and unit pavers in the larger open plaza area and beside the at - grade commercial retail unit (CRU) located at the east end of the Station. This CRU is intended to provide on site retail service for transit users and pedestrian activity/‘eyes on the street’ for the east end of the Station and transit exchange prior to the redevelopment of the S outh P laza area. Additionally, a ‘ wave ’ paving pattern is used on the north side of the S tation (between the Station wall and transit exchange bays) , which carries through a similar paving pattern along the south side of Industrial Avenue to the west, which was designed as part of a separate public realm plan associated with the road , multi - use pathway and sidewalk surface under the SkyTrain guideway (see image below for an example of the wave pattern boulevard along the south side of Industrial Avenue ) . The wave pattern is intended to evoke the Nicomekl River and its journey through the City, and the significant role it has played in shaping the geographical and historical context of the Langley City ar ea. This paving pattern is a part of a broader public realm enhancement concept that support s future TOD development along Industrial Avenue; this concept will include public art and interpretive feature installations spaced along the corridor, as well as decorative uplighting of the SkyTrain guideway columns in the future. Surface parking spaces are provided along the lane south of the Station, for use by staff of operating agencies including SkyTrain staff and Transit Police (these spaces will be integrated into the parkade s of future building s as redevelopment occurs). Trees are incorporated in planting areas of different sizes throughout the site. Furnishings include benches and a large outdoor bicycle rack. --- page 126 --- To: Advisory Design Panel Date: September 5, 2024 Subject: Langley City Centre SkyTrain Station Page 6 T he space to the northeast of the station is oriented toward bus operations and includes five bus bays and a layover area. The layover area has been designed to support electric bus charging capability in the future and leaves a smaller area adjacent to the planned intersection of Industrial Avenue and 203A Street to host the required infrast ructure. Additional trees are proposed on the perimeter. The station has four entrances, with one on the north and south sides of each end. Both sets of entrances have up and down escalators and an elevator for access to the centre platform above. A bike parkade ( a Compass - card secured room with tw o - level racks ) is included near the northwest entrance . Much of the middle of the station ground floor, below the platform, is occupied by interior non - public service rooms that are only accessible for SkyTrain and transit support staff (ie. BCRTC and CMBC) . TIC and SFSP have also indicated that this interior service space will also accommodate Transit Police staff on - site. Intercom k iosks are also planned to be provided in the Station area, including at ground level (outside of fare paid zone/gates) and platform level, to enable transit users to call and comm unicate with Transit Police and BCRTC staff. Additional information is expected to be provided by TIC and SFSP as the LCC Station design progresses to its final iteration and construction. The Station and public realm materials are consistent with those intended to be used for all stations along the SkyTrain extension, and will be similar to other newer stations such as those along the Millennium Line “Evergreen Extension” in the Tri - Cities. Key station materials include heavy timber soffits and ceilings, stone panel walls, large glazed areas, and metal accents. 3. Propulsion Power Substation (PPS) Propulsion P ower S ubstations (PPS) are buildings supplying electrical power to the SkyTrain system that are generally associated with stations. One PPS is planned in Langley City along Industrial Avenue near its intersection with 201A Street, approximately 225 metres to the west of the station . This PPS is sited nearly abutting the east property line , with the remainder of the property used for associated infrastructure, vehicular access, and two staff parking spaces. The PPS will present a height of approximately two storeys, and will be primarily finished in stone/concrete panels, with doors and a decorati ve fin in steel. The PPS façade design is driven by the need to house high voltage electrical equipment, which precludes windows or other openings. This being said, the location of the PPS along the east side of the site (including access), as well as the blank façade nat ure of the building, does permit future buildings to be --- page 127 --- To: Advisory Design Panel Date: September 5, 2024 Subject: Langley City Centre SkyTrain Station Page 7 constructed adjacent to the PPS (and possibly over top of the PPS, as seen in other communities with similar facilities). 4. Sustainability The project ’s sustainability approach prioritizes natural light and uses energy - efficient system s and durable materials , including cross - laminated timber. 5. Summary The p lanned Langley City Centre station has been a primary consideration within the City’s long - range planning, including both transportation and land use. In turn, the City has set expectations for the Province and its contractor to align the station’s design with the City’s vision for the immediate area and Downtown. Fire Department Comments: Fire department access for the whole project was reviewed to ensure adequate access was in place for apparatus and firefighters. A construction fire safety plan shall be completed and updated on a regular basis. A Fire Safety plan and FD lock box (knox box) will be required before occupancy , location to be discussed at a later date. The 4” FDC locat ion will be determined later in the project schedule in discussions with the Fire Department . Advisory Design Panel : As a Provincial project, the SkyTrain extension and Langley City Centre station is not subject to formal municipal permitting or approvals. However, the City has worked closely with BC TIC over the course of the project to shape its design and reached an agreement to provide non - binding recommendations through an adjusted process similar to those used for development applications. Accordingly, the station design will be reviewed by the Advi sory Design Panel (ADP) at the September 11, 2024 meeting. The ADP i s to provide form and character and urban design - related advice which will be provided to BC TIC and their contractor SFSP for their consideration. Prepared by: _______________________ Anton Metalnikov, RPP, MCIP Planner --- page 128 --- To: Advisory Design Panel Date: September 5, 2024 Subject: Langley City Centre SkyTrain Station Page 8 Concurrence: __________________________ Roy M. Beddow, RPP, MCIP Deputy Director of Development Services Concurrence: _______________________ Carl Johannsen, RPP, MCIP Director of Development Services Concurrence: Concurrence: __________________________ __________________________ David Pollock, P.Eng. Scott Kennedy, Fire Chief Director of Engineering, Parks, & Environment Attachments