Minutes - Advisory Design Panel Source: https://www.langleycity.ca/media/file/advisory-design-panel-adp-minutes-april-16-2025 Archived copy: https://heylangley.ca/records/city-of-langley/committees/advisory-design-panel/2025/2025-04-16-minutes-advisory-design-panel-adp-minutes-april-16-2025.pdf SHA-256 of the PDF: e2477af228f6595112e82adfb6aabaee0b80428b24bf6aadfce02cec816f39af Fetched: 2026-11-10 --- page 1 --- Document Number: 201679 201679 MINUTES OF THE ADVISORY DESIGN PANEL HELD IN CKF ROOM , LANGLEY CITY HALL WEDNESDAY , APRIL 16 , 2025 AT 7:0 0 PM Present: Councillor Paul Albrecht (Chair) Councillor Mike Solyom (Co - Chair) Mayor Nathan Pachal Himanshu Chopra Melissa Coderre Jaswinder Gabri Matt Hassett Tracey Macatangay Tana McNicol Samantha Stroman Absent: Leslie Koole Ritti Suvilai Staff: C. Johannsen, Director of Development Services A. Metalnikov , Planner S. Salh , Executive Assistant Chair Albrecht began by acknowledging that the land on which we gather is on the traditional unceded territory of the Katzie, Kwantlen, Matsqui and Semiahmoo First Nations. 1) AGENDA Adoption of the April 16, 2025 agenda It was MOVED and SECONDED THAT the April 16 , 2025 agenda be adopted as circulated. CARRIED --- page 2 --- ADP Minutes – April 16 , 2025 2 2) MINUTES Adoption of minutes from the March 12, 2025 meeting It was MOVED and SECONDED THAT the minutes of the March 12 , 202 5 Advisory Design Panel meeting be approved as circulated. CARRIED 3) DEVELOPMENT PERMIT APPLICATION DP 03 - 24 20297 Fraser Highway . Mr. Johannsen introduced the application and advised that it is in a transit - oriented area and does not require rezoning, only a building permit. Mr. Metalnikov spoke to the staff report regarding the application context, indicating that it is a 6 - storey mixed - use building with apartments and commercial floor area. The Applicant team entered the meeting: Travis Tournier, Owner’s Representative, Kerr Properties Ltd. Jim Vasto, Principal, Gravity Architecture Richard Anderson, Project Architect, Gravity Architecture Clark Kavolin a s, Landscape Architect, C Kavolinas & Associates Inc. Mr. Vasto p rovided a PowerPoint presentation on the proposed development, providing information on the following: • Noting the importance of the site and understand ing the desire to revitalize the downtown core with the proximity to the new sky train station ; • The history of the property, with the approach needing to be different than a cookie cutter property; • T he proposed design including 78 rental units , and 7000 square feet for commercial retail space with parking below . Mr. Anderson provided the following information: • S ite context and layout ; • E xterior design of the building ; • I nterior layout ; • Project details. The applicant team responded to questions from Panel members and received feedback from Panel members regarding the form and character of building : • R eally like the project with the wood panels in the random spots; • Need clarity on the amenity space ; • Colour and character needed on the white wall facing Fraser H ighway ; • The height of the roofline; --- page 3 --- ADP Minutes – April 16 , 2025 3 • Would prefer more green ery on the ground level and vertical surfaces; • Amending the ground floor commercial retail units so they can use the street front for outdoor seating; • Have large stairs at the front of the building where people can sit or can be used for greenery; • More is needed in the front corner of the building, such as a public art piece, lighting detail, water feature, trees, or Indigenous art; • The need for privacy s creening between residents’ balconies ; • Use of r ooftop treatment to reduce heat island effect ; provide environmentally friendly surface treatment ; • Suggestion to name the building Gabby’s or add Gabby’s down one side of the exterior walls; • E xtra sound treatmen t with the washrooms in the amenity/active areas due the condos on either side of them; • P re - ducting for future expansion of EV parking ; • U se Canada post hardware in the mailroom . The applicant team left the meeting. There was further discussion regarding the following: • Update landscape plans with additional programming and furnishing detail s consider ing potential for outdoor displays and seating on the business frontages ; • Create a roll up wall for the commercial retail units ; or set the curtain wall a little further back ; • Need to be strategic when planting trees – need protection around them or plant them against the building; • A n opportunity to test out different artistic interventions by projecting art onto that exterior wall ; • G reen elements such a s floating trellis or vines ; • Use LED strip lighting; • Suggestion was not to have a water feature due to water restrictions and high maintenance; • L andscaping in the back lane to add interest to the back of the building and to keep graffiti and loitering to a minimum; • Stairs in front of the building, like areas in Vancouver and Bentall complex; • Keep the bike racks simple; • B ike parking underground or in the units ; • S ound attenuation in the amenity room; • O perable windows in all the bedrooms . It was MOVED and SECONDED THAT: The ADP receive d the staff report dated April 11, 2025 for information; and The ADP recommends the applicant give further consideration to the following prior to the application proceeding to Council: --- page 4 ---