Agenda - Advisory Design Panel Source: https://www.langleycity.ca/media/file/adp-meeting-agenda-november-5-2025 Archived copy: https://heylangley.ca/records/city-of-langley/committees/advisory-design-panel/2025/2025-11-05-agenda-adp-meeting-agenda-november-5-2025.pdf SHA-256 of the PDF: 3ef321a500d6f80983107f324635a40afe8ea3051be2133107a10d60a8389ee9 Fetched: 2026-11-10 --- page 1 --- ADVISORY DESIGN PANEL WEDNESDAY, November 5, 2025 AT 7:00 PM Council Chambers Langley City Hall (In-Person Meeting) A G E N D A 1) AGENDA Adoption of the November 5, 2025 agenda. 2) MINUTES Adoption of minutes from the September 10, 2025 meeting. 3) DEVELOPMENT PERMIT APPLICATION DP 04-25 5975 Collection Drive. 4) NEXT MEETING Date to be confirmed. 5) ADJOURNMENT --- page 2 --- Document Number: 204342 MINUTES OF THE ADVISORY DESIGN PANEL HELD IN THE COUNCIL CHAMBERS LANGLEY CITY HALL 20399 DOUGLAS CRESCENT SEPTEMBER 10, 2025 AT 7:35 P.M. Present: Councillor Paul Albrecht (Chair) Councillor Mike Solyom (Co - Chair) Mayor Pachal (Ex Officio Member) Himanshu Chopra Jaswinder Gabri Matt Hassett Leslie Koole Samantha Stroman Absent: Melissa Coderre Tracey Macatangay Tana McNicol Ritti Suvilai Staff Present: C. Johannsen, Director of Development Services K. Kenney, Corporate Officer J. Lee, Planning Assistant A. Metalnikov, Senior Planner Also in Attendance: Councillor Leith White Chair Albrecht began by acknowledging that the land on which we gather is on the traditional unceded territory of the Katzie, Kwantlen, Matsqui and Semiahmoo First Nations. 1. AGENDA Adoption of the September 10, 2025 agenda It was MOVED and SECONDED THAT the September 10, 2025 agenda be adopted as circulated. CARRIED --- page 3 --- 1 Document Number: 204342 2. MINUTES Adoption of minutes from the July 30, 2025 meeting It was MOVED and SECONDED THAT the minutes of the July 30, 2025 Advisory Design Panel meeting be approved as circulated. CARRIED 3. DEVELOPMENT PERMIT APPLICATION DP 03-25 5470 203 Street (Langley Lions Alder Building) Mr. Metalnikov introduced the application and spoke to the staff report dated August 29, 2025. The applicant team was in attendance as follows: Jeanette Dagenais, Executive Director, Langley Lions Housing Society Dane Jansen, Principal, dys architecture Leanne Milburn, Intermediate Technologist, dys architecture Amy Lu, Designer, dys architecture Matt Gray, Associate, eta landscape architecture Mr. Jansen made a PowerPoint presentation to the Panel providing details of the form and character of the proposed building, and noting that, due to underground sanitary line placement, the building siting had to be adjusted which resulted in a reduction in the number of units in the building. Staff provided information to the Panel with respect to investigating the feasibility of relocating the parkade access from 203 Street to the internal ring road. Ms. Dagenais spoke regarding her concerns for the safety of residents by relocating the parkade access to the internal ring road. The applicant team responded to questions from Panel members and received feedback from Panel members regarding the form and character of the building, from which a list of recommendations was compiled by staff for the Panel’s consideration. The applicant team left the meeting. Staff responded to further questions and received further feedback from Panel members. --- page 4 --- ADP Minutes – September 10, 2025 2 It was MOVED and SECONDED THAT: The ADP receive the staff report dated August 29, 2025 for information; and The ADP recommends the applicant give further consideration to the following prior to the application proceeding to Council: a. Explore decorative features for the parkade sidewall (e.g. landscaping, terracing, colour, etc.); b. Consider further refining building character, with possible interventions such as greater contrast between façade colours, additional use of orange along the roofline, coloured glass, art features, and highlighting the northwest corner; c. Give further study to the orange masses, including adding decorative details (especially on south elevation), consider the shade’s longevity, and exploring alternative colours or hues; d. Give further consideration to the colour of the balcony door highlights and their relationship with the building’s orange sections; e. Consider incorporating breaks into extended balcony guardrails to add articulation; f. Consider adding more scooter storage spaces in place of bicycle parking spaces (may require variance), explore the potential for spaces to accommodate both scooters and bicycles, and explore scooter spaces outside the parkade, including the usability of in-unit storage rooms; g. Review unit floor plans and potential of resolving overlapping door swings; h. Explore opportunities for additional trees and evergreen plantings; i. Consider providing a greater number of accessible units (in place of adaptable units); j. Ensure design of parkade ramp has excellent sightlines and maintains level sidewalk and bicycle lane access over it if located on 203 Street; k. Provide more detail on weather protection features in the ground floor outdoor amenity areas; l. Explore alternatives to artificial turf for the lawn bowling area; m. Consider providing a guest suite within the building; n. Consider incorporating upper floor stepbacks; o. Consider an automatic door opener for the garbage room; p. Incorporate additional visibility into the parkade elevator lobby; q. Explore opportunities to increase the prominence of the “S-curving” balcony decks and walls; r. Consider air conditioning in the common indoor amenity room and provide more information on approach to compliance with Building Code temperature and energy requirements; s. Consider heating and/or design solutions to improve the parkade ramp’s accessibility in slippery conditions. CARRIED --- page 5 --- ADP Minutes – September 10, 2025 3 4. NEXT MEETING October or November – to be determined 5. ADJOURNMENT It was MOVED and SECONDED THAT the meeting adjourn at 9:14 pm. CARRIED _________________________ Signed: ADVISORY DESIGN PANEL CHAIR _________________________ Certified Correct: CORPORATE OFFICER --- page 6 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject: Development Permit Application DP 04-25 (5975 Collection Drive) From: Ji Woo Lee , BSc. , MCRP Planning Assistant File #: 6630.00 Bylaw #: Date: October 22, 2025 Doc #: RECOMMENDATION: THAT this report be received for information. PROPOSAL Development Permit Application for a 4,609.65m 2 automotive dealership development. CITY BYLAWS & POLICIES: Applying to the subject properties: a. Official Community Plan (OCP): Mixed Employment; and b. Zoning: CD 23 Comprehensive Development The proposed development: a. Is consistent with the OCP (Mixed Employment); and b. Is consistent with the property’s existing CD 23 Comprehensive Development zoning; no rezoning required. COMMENTS/ANALYSIS: Background Information: Applicant: Christopher Bozyk Architects Ltd. Civic Address: 5975 Collection Drive --- page 7 --- To: Advisory Design Panel Date: October 22 2025 Subject: Development Permit Application DP 04-25 Page 2 Discussion: 1. Context The applicant is proposing a 4,609.65 m² automotive dealership development. The subject site is designated Mixed Employment in the City’s Official Community Plan and is zoned CD23 Comprehensive Development, permitting automotive sales and services. The property is located within the Langley Auto Collection, an established auto mall. Surrounding lands are occupied by automotive dealerships and associated facilities. The property is currently unimproved and utilized as a parking lot by the owner. The site fronts onto Collection Drive, a privately owned internal road that provides access to Glover Road (arterial road) and Langley Bypass (Provincial road). Car dealerships border the site to the north and south, while Logan Creek and a light industrial building are located to the west, along the rear property line. Legal Description: Lot D, District Lot 308, Group 2, New Westminster District, Plan BCP49680 And an Undivided 85/400th Share in Lot 4, District Lot 308, Group 2 New Westminster District, Plan BCP44937 (See Plan as to Limited Access) Site Area: 12,063m 2 (129,841 ft 2 ) Gross Floor Area: 4,609.65m 2 (49,618 ft 2 ) Floor Area Ratio: 0.38 Lot Coverage: 28% Total Parking Required: 99 spaces (including 5 h/c space) Parking Provided: 144 spaces (including 5 h/c spaces) OCP Designation: Mixed Employment Zoning: CD 23 Development Cost Charges: $1,330,254.83 (City - $717,474.26, GVS&DD - $268,432.62, GVWD - $262,974.66, MV Parks – $11,908.29, TransLink - $69,465.00) Community Amenity Contributions (CACs): N/A --- page 8 --- To: Advisory Design Panel Date: October 22 2025 Subject: Development Permit Application DP 04-25 Page 3 Site context 2. Design The applicant is proposing a 4,609.65 m 2 development for an automotive dealership consisting of three buildings: a showroom, a carwash, and service bays. Vehicular and pedestrian access to the site is provided from Collection Drive, the existing internal road. The showroom is oriented towards Collection Drive and is constructed of concrete tilt-up panels expressed in a rectilinear massing with flat roofs. The front façade features extensive glazing enclosing a two-storey lobby. Primary cladding materials include an insulated metal wall system and aluminium composite panels in silver and grey tones. The carwash facility is located behind the showroom near the corner of the north and rear property lines. The building has a simple rectangular form with flat concrete tilt-up walls. Exterior finishes consist of aluminium panels in silver and grey, and concrete block cladding painted in similar shades. Subject Site --- page 9 --- To: Advisory Design Panel Date: October 22 2025 Subject: Development Permit Application DP 04-25 Page 4 The service bay building is located at the rear of the showroom along the rear property line and is constructed of tilt-up construction with a sloped roof. The exterior is clad with an insulated metal wall system and aluminium composite panel in varying shades of grey and silver. The proposed landscaping plans indicate that existing tree groups at the rear of the site will be retained. Planting of a range of tree and plant species is proposed along the site frontage, west and south boundaries, and within parking islands. A total of 47 new trees are proposed, including Emerald Sentinel Sweetgum and Select Green Austrian Black Pine. Shrub and groundcover species such as Little- Leaf Boxwood, Oregon Grape, and Oceanspray provide additional layering and visual interest throughout the site. Trees and groundcovers are planted along the rear property line for additional buffer between the parking lot and Logan creek. 3. Sustainability The proposal incorporates several sustainable development features, including: • Removing invasive plant species; • Using construction techniques that minimize site disturbance; • Using exterior lighting systems meeting ground-level and dark skies light pollution reduction principles; • Incorporating a construction recycling plan; • Incorporating the use of recycled building materials; • Achieving energy performance of 25% better than the current Model National Energy Code for commercial, industrial, and institutional buildings; • Using drought-tolerant and non-water dependent planting materials; • Using an irrigation system with central control and rain sensors; • Using water-conserving toilets; 4. CPTED The applicant’s proposal benefited from a comprehensive Crime Prevention Through Environmental Design (CPTED) review by a qualified consultant whose recommendations were incorporated into the plans. 5. Summary The proposed development is consistent with the property’s zoning and OCP designation and would further reinforce the Auto Mall’s function as a key regional destination for automotive sales. --- page 10 --- To: Advisory Design Panel Date: October 22 2025 Subject: Development Permit Application DP 04-25 Page 5 BUILDING REQUIREMENTS The site is located within the floodplain area and is therefore subject to the provisions of Floodplain Elevation Bylaw No. 2768. All buildings and structures are to be designed to meet the required minimum building elevation (MBE). ENGINEERING REQUIREMENTS A new water service connection will be required to support this development. The developer will need to provide sufficient room at the lot property line, on the private side, to accommodate a water meter chamber. Given that Collection Drive is a private road, Engineering will require the water service to be within a statutory right-of-way from the watermain to the property line. FIRE DEPARTMENT COMMENTS Fire department access for the whole project was reviewed to ensure adequate access was in place for both apparatus and firefighters. A construction fire safety plan shall be completed. The department is requesting the Fire Department Connection to be a 4” storz connection located on a remote pedestal in front of the building. A lockbox will be required for this building. The location of the new hydrant proposed by the applicant will need to be confirmed at a later date. ADVISORY DESIGN PANEL In accordance with Development Application Procedures Bylaw No. 3270, the subject Development Permit application will be reviewed by the Advisory Design Panel (ADP) at the November 5, 2025 meeting. According to the Council-approved ADP Terms of Reference, the ADP is to provide form and character and urban design-related advice and recommendations for Council’s consideration. ADP recommendations will be presented to Council through the ADP meeting minutes and, if applicable, through an additional City staff report, prior to Council consideration of the proposed Development Permit Applications. A copy of the ADP minutes will be presented to Langley City Council at a future Regular Council meeting. BUDGET IMPLICATIONS: In accordance with Bylaw No. 3256, the proposed development would contribute $717,474.26 to City Development Cost Charge accounts. --- page 11 --- To: Advisory Design Panel Date: October 22 2025 Subject: Development Permit Application DP 04-25 Page 6 Prepared by: _______________________ Ji Woo Lee, BSc., MCRP Planning Assistant Concurrence: Concurrence: __________________________ _______________________ Roy M. Beddow, RPP, MCIP Carl Johannsen, RPP, MCIP Deputy Director of Development Services Director of Development Services Concurrence: Concurrence: __________________________ __________________________ Rachel Ollenberger Scott Kennedy Manager of Engineering Services Fire Chief Attachments --- page 12 --- To: Advisory Design Panel Date: October 22 2025 Subject: Development Permit Application DP 04-25 Page 7 DEVELOPMENT PERMIT APPLICATION DP 04-25 Civic Addresses: 5975 Collection Drive Legal Description: Lot D District Lot 308 Group 2 New Westminster District Plan Bcp49680 And An Undivided 85/400th Share In Lot 4 District Lot 308 Group 2 New Westminster District Plan Bcp44937 (See Plan As To Limited Access) Applicant: Christopher Bozyk Architects Ltd. --- page 13 --- --- page 14 --- --- page 15 --- --- page 16 --- --- page 17 --- --- page 18 --- --- page 19 --- --- page 20 --- --- page 21 --- --- page 22 --- --- page 23 --- --- page 24 --- --- page 25 --- --- page 26 --- --- page 27 --- --- page 28 --- --- page 29 --- --- page 30 --- --- page 31 --- --- page 32 --- --- page 33 --- --- page 34 ---