Agenda - Advisory Design Panel Source: https://www.langleycity.ca/media/file/advisory-design-panel-adp-agenda-december-3-2025-final-pkgpdf Archived copy: https://heylangley.ca/records/city-of-langley/committees/advisory-design-panel/2025/2025-12-03-agenda-advisory-design-panel-adp-agenda-december-3-2025-f.pdf SHA-256 of the PDF: e58273b9ebb5696d7fdf6179043fc75298d37652c2e53e543a631b8202de785f Fetched: 2026-11-10 --- page 1 --- ADVISORY DESIGN PANEL WEDNESDAY, December 3, 2025 AT 7:00 PM Council Chambers Langley City Hall (In-Person Meeting) A G E N D A 1) AGENDA Adoption of the December 3, 2025 agenda. 2) MINUTES Adoption of minutes from the November 5, 2025 meeting. 3) PANEL MEMBERSHIP PHOTO Photo of the ADP membership for inclusion in the 2026 Volunteer Appreciation Banquet slideshow. Consent forms will be provided at the meeting. 4) DESIGN UPDATE: DEVELOMPENT APPLICATION DP 13-24/ RZ 09-24/ OCP 01-24 19991 49 Avenue, 19990 50 Avenue, and 4951-4975 & 4991 200 Street. 5) DEVELOPMENT PERMIT APPLICATION DP 05-25 5721 Production Way. 6) NEXT MEETING January/February – date to be confirmed. 7) ADJOURNMENT --- page 2 --- Document Number: 204925 MINUTES OF THE ADVISORY DESIGN PANEL HELD IN THE COUNCIL CHAMBERS LANGLEY CITY HALL 20399 DOUGLAS CRESCENT NOVEMBER 5, 2025 AT 7:00 P.M. Present: Councillor Paul Albrecht (Chair) Councillor Mike Solyom (Co-Chair) Mayor Pachal (Ex Officio Member) Himanshu Chopra (7:02 pm) Melissa Coderre Jaswinder Gabri Matt Hassett Leslie Koole Tana McNicol Samantha Stroman Ritti Suvilai Staff Present: C. Johannsen, Director of Development Services K. Kenney, Corporate Officer A. Metalnikov, Senior Planner Chair Albrecht began by acknowledging that the land on which we gather is on the traditional unceded territory of the Katzie, Kwantlen, Matsqui and Semiahmoo First Nations. 1. AGENDA Adoption of the November 5, 2025 agenda It was MOVED and SECONDED THAT the November 5, 2025 agenda be adopted as circulated. CARRIED --- page 3 --- 1 Document Number: 204342 2. MINUTES Adoption of minutes from the September 10, 2025 meeting It was MOVED and SECONDED THAT the minutes of the September 10, 2025 Advisory Design Panel meeting be approved as circulated. CARRIED 3. DEVELOPMENT PERMIT APPLICATION DP 04-25 5975 Collection Drive (Automotive Dealership) Himanshu Chopra entered the meeting. Mr. Metalnikov introduced the application and spoke to the staff report dated October 22, 2025. The applicant team was in attendance as follows: Christopher Bozyk Architects – Jana Wissmann, Architects Representative PMG Landscape Architects – Yiwen Ruan, Principal Ms. Wissmann made a PowerPoint presentation to the Panel providing details of the form and character of the three proposed buildings. Mr. Bozyk provided details on landscaping features. The applicant team responded to questions from Panel members and received feedback from Panel members regarding the form and character of the buildings, from which a list of recommendations was compiled by staff for the Panel’s consideration. It was MOVED and SECONDED THAT: The ADP receive the staff report dated October 22, 2025 for information; and The ADP recommends the applicant give further consideration to the following prior to the application proceeding to Council: a. Provide a clearer representation of relationship between existing property line, new landscaping, and buildings; b. Ensure renderings and elevations are consistent with each other (e.g. sloping roof cornice at front of dealership, main entrance gateway feature); c. Consider incorporating colours on the exterior, including the glass; d. Provide outdoor amenity areas (e.g. customer seating, employee break spaces, etc.); --- page 4 --- ADP Minutes – November 5, 2025 2 e. Provide additional counter space in the women’s locker room; f. Explore opportunities for on-site natural stormwater management features (e.g. dry creek bed, additional permeable spaces, etc.); g. Consider alternative roof lines for the service bay accessory building for greater visual interest; h. Replace chain link fencing with more attractive material and design; i. Review all three buildings to create an identifiable character for the entire development and for overall design consistency (e.g. consider alternative exterior materials for car wash building to better relate to main dealership building); j. Make the entrance door on northwest elevation more prominent; k. Use a reflective roofing colour/material to reduce the heat island effect l. Confirm landscape design’s compliance with DPA guidelines on parking lots and trees; m. Replace the front boulevard grass with alternative plantings; n. Provide more information on building and site ground elevations, including in relation to the rest of the site and surrounding lands. CARRIED The applicant team left the meeting. 4. NEXT MEETING December 3, 2025 5. ADJOURNMENT It was MOVED and SECONDED THAT the meeting adjourn at 7:52 pm. CARRIED --- page 5 --- ADP Minutes – November 5, 2025 3 _________________________ Signed: ADVISORY DESIGN PANEL CHAIR _________________________ Certified Correct: CORPORATE OFFICER --- page 6 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject: Development Permit Application DP 05 - 25 ( 5721 Production Way ) File #: 6620.00 From: Ji Woo Lee, BSc., MCRP Planning Assistant Bylaw #: Doc #: Date: November 25, 2025 RECOMMENDATION: THAT this report be received for information. 1. PROPOSAL: Development Permit for 19,717m 2 light industrial and self-storage development. 2. CITY BYLAWS & POLICIES: Applying to the subject properties: a. Official Community Plan (OCP): Industrial; and b. Zoning: I1 Light Industrial. The proposed development: a. Is consistent with the OCP (industrial development); and b. Is consistent with the Zoning Bylaw 3. DETAILED BACKGROUND INFORMATION Applicant: Jeremy B ergmann Owner: 5721B Production Ltd. Civic Address: 5721 Production Way Legal Description: Lot 93, District Lot 310, Group 2, New Westminster District, Plan 45918 Except Plan BCP49150 Site Area: 15,495 m 2 (3.83 acres) Gross Floor Area: 19,717 m 2 (212,228 ft 2 ) --- page 7 --- To: Advisory Design Panel Date: November 25, 2025 Subject: Development Permit Application DP 05-25 Page 2 4. SITE CONTEXT (5721 Production Way) The applicant proposes to develop two industrial buildings, with a 2,409 m 2 small- bay industrial building and a 17,308m 2 self-storage building (19,717 m 2 total) on a currently unimproved vacant lot. The applicant has previously submitted a Development Permit Application for the site in 2023 for a 2-building 9,679 m 2 industrial development which was approved in 2024. Due to changes in market conditions, the applicant has submitted this application. The new application shares a similar layout as the previous application, with the main difference being the addition of a larger self-storage building in place of a smaller industrial building on the west of the site. The new concept is consistent with the site’s OCP designation and zoning. This application is received for a development permit for form and character review. The subject property is designated as Industrial in the City’s Official Community Plan, which aligns with the property’s existing I1 Light Industrial zoning, both of which allow for various industrial and industrial-supportive uses, including the proposed development. Situated in an established industrial area, the subject site is surrounded by various buildings for manufacturing and warehousing. The triangular property has a single frontage on its east, from which access is provided, along the bend of Production Way, a local road that connects the area to the arterial roads of 56 Avenue, Fraser Highway, and 200 Street. To the west, the property is bounded by the 196 Street overpass, which acts as a physical barrier restricting site access from the west. A short section along its north property line is shared with a railway on its north. Floor Area Ratio: 1.27 Lot Coverage: 43.8% Total Parking Required: 197 spaces (including 10 h/c spaces) Parking Provided: 111 spaces (including 6 h/c spaces) OCP Designation: Industrial Zoning: I1 Light Industrial Variances Requested 111 parking spaces provided (197 min.) Development Cost Charges: $3,626,976.52 (City - $1,233,044.68, GVS&DD - $1,148,153.48, GVWD - $1,124,808.40, MVRD - $50,934.72, TransLink - $70,035.24) --- page 8 --- To: Advisory Design Panel Date: November 25, 2025 Subject: Development Permit Application DP 05-25 Page 3 Context Map 5. PROPOSED SITE AND BUILDING DESIGN A. Site Layout and Building Massing The applicant is proposing a two-building industrial development on the I1 Light Industrial-zoned lot. Vehicular and pedestrian access to both buildings are provided from Production Way. The proposed buildings are positioned north-south, parallel to 196 Street. Internal circulation drive aisles are planned throughout the site to connect parking stalls and allow fire truck access. In anticipation of the future Willowbrook Skytrain station north of the site, a pedestrian path along the south property line is provided to allow future access to 196 Street. B. Building Elevations and Materials Building 1 is a two-storey tilt-up concrete building with its primary frontage facing east. The building elevations employ a range of construction materials in white and grey. The street facing east elevation features glazing and spandrel. Loading bays and doors to individual units are provided from the rear, west elevation. Subject Site --- page 9 --- To: Advisory Design Panel Date: November 25, 2025 Subject: Development Permit Application DP 05-25 Page 4 Building 2 is a three-storey tilt-up concrete construction with slate-coloured panels. The east elevation includes a glazed storage office main entrance on the ground floor, acting as a lobby to the building. Blue and orange sections, along with grey vertical stripes, are used at intervals on the building elevations to articulate rhythms and reduce the sense of overall width. C. Landscaping A total of 43 new trees in a mix of deciduous and evergreen species are planned throughout the site. Primary tree species include Garnet Japanese Maple and Serbian spruce. Additionally, shrubs, perennials, and groundcover species are introduced notably Kinnickinnick and Dwarf Red Osier Dogwood. Existing tree groups along the south property line are preserved. Two outdoor amenity spaces are proposed: a larger area along the frontage and a smaller one in the southwest corner of the property. Both areas will be furnished with picnic tables and benches, with the larger space also featuring a pergola and bike racks. Pavers will be used as the surface finish for both amenity areas. 6. SUSTAINABILITY FEATURES • Using construction techniques that minimize site disturbance and protect air quality; • Using exterior lighting systems meeting ground-level and dark skies light pollution reduction principles; • Incorporating a construction recycling plan and the use of recycled building materials; • Using drought-tolerant plans and incorporating an irrigation system with central control and rain sensors; and • Incorporating an irrigation system with central control and rain sensors 7. CPTED The applicant’s proposal benefited from a comprehensive Crime Prevention Through Environmental Design (CPTED) review by a qualified consultant whose recommendations were incorporated into the plans. 8. VARIANCES The applicant has requested a variance from the Zoning Bylaw to reduce the required number of parking spaces for the development from 197 to 111. This request reflects the operational characteristics of Building 2 and the lower parking demand associated with its self-storage use. If parking for the two buildings was considered separately, 24 parking spaces would be required for --- page 10 --- To: Advisory Design Panel Date: November 25, 2025 Subject: Development Permit Application DP 05-25 Page 5 Building 1 to achieve the required parking rate of 1.0 space/100 m² of gross floor area (GFA), which would leave 87 spaces for Building 2, or equivalent to 0.5 spaces/100 m² GFA. This reduced rate for Building 2 is supported by staff in recognition of self-storage buildings’ lower parking demand and the additional analysis below. A parking rate of 0.5 spaces/100 m² GFA for Building 2 would be well aligned with the lower rates required by surrounding municipalities for self-storage buildings, as outlined in Table 1 below. These rates range from approximately 0.125 spaces/100m² to 0.54 spaces/100 m². Additionally, a parking study prepared by a Professional Engineer confirms that the proposed parking level is acceptable for Building 2. The study identified a total peak need for 99 parking stalls for both buildings together, compared to the 111 stalls proposed. The study also notes that peak demand periods for self-storage and industrial buildings are offset (5PM vs 2PM respectively) which further supports the proposed parking approach as the total parking supply will be more resilient and efficient in accommodating parking needs for both uses. Based on the rationale above, staff support the requested variance. Table 1. Self-Storage Parking Comparisons Jurisdiction Rate Township of Langley Industrial 1 space/186 m 2 (0.54 spaces/100 m 2 ) Surrey 0.5 spaces/100 m 2 Abbotsford 1 space/800 m 2 (0.125 spaces/100 m 2 ) Chilliwack 1 space/550 m 2 (0.18 spaces/100 m 2 ) Mission 1 space/200 m 2 (0.5 spaces/100 m 2 ) New Westminster 1 space/325.15 m 2 (0.31 spaces/100 m 2 ) Table 2. Parking Summary Required Provided Parking variance Building 1 24 24 No Variance Building 2 173 87 0.5 spaces/100m 2 Total 197 111 --- page 11 --- To: Advisory Design Panel Date: November 25, 2025 Subject: Development Permit Application DP 05-25 Page 6 9. ENGINEERING The Developer will be required to upgrade the Production Way frontage including curb and gutter, sidewalk and street lights. The existing service connections will need to be replaced to reflect the development flows and a portion of the existing sanitary sewer main on Production Way shall be upgraded. A water meter and backflow preventor shall be installed in a water meter chamber at the property line at the building permitting stage. 10. FIRE DEPARTMENT COMMENTS Fire department access for the entire project was reviewed to ensure adequate access was in place for fire apparatus and firefighters. A construction fire safety plan shall be completed. A 4” storz, fire department connection will need to be located on a remote pedestal at the front property line. A fire hydrant within 45 meters of the FDC is to be provided. A FD lock box will be required to be installed on buildings and near gates before occupancy. A radio amplification system will be required. 11. BUDGET IMPLICATIONS In accordance with Development Cost Charges Bylaw, 2024, No. 3256 and the City’s Amenity Contributions Policy, the proposed development is estimated to contribute the following to the City: • Development Cost Charges (DCCs): $1,233,044.68 Prepared by: _________________________ Ji Woo Lee, BSc., MCRP Planning Assistant Concurrence: _______________________ Carl Johannsen, RPP, MCIP Director of Development Services --- page 12 --- To: Advisory Design Panel Date: November 25, 2025 Subject: Development Permit Application DP 05-25 Page 7 Concurrence: Concurrence: __________________________ __________________________ David Pollock, P.Eng. Scott Kennedy Director of Engineering, Parks, Fire Chief & Environment Attachments --- page 13 --- To: Advisory Design Panel Date: November 25, 2025 Subject: Development Permit Application DP 05-25 Page 8 DEVELOPMENT PERMIT APPLICATION DP 05-25 Civic Addresses: 5721 Production Way Legal Description: Lot “F”, District Lot 37, Group 2, New Westminster District, Plan 8633 Applicant: Jeremy Bergmann Owners: 5721B Production Ltd. --- page 14 --- --- page 15 --- --- page 16 --- --- page 17 --- --- page 18 --- --- page 19 --- --- page 20 --- --- page 21 --- --- page 22 --- --- page 23 --- --- page 24 --- --- page 25 --- --- page 26 --- --- page 27 --- --- page 28 --- --- page 29 --- --- page 30 --- --- page 31 --- --- page 32 --- --- page 33 --- --- page 34 --- --- page 35 --- --- page 36 --- --- page 37 --- --- page 38 --- --- page 39 --- --- page 40 --- --- page 41 --- 70" 1778mm 25 1/2" 647mm --- page 42 ---