Agenda - Advisory Design Panel Source: https://www.langleycity.ca/media/file/adp-package-february-18-2026pdf Archived copy: https://heylangley.ca/records/city-of-langley/committees/advisory-design-panel/2026/2026-02-18-agenda-adp-package-february-18-2026pdf.pdf SHA-256 of the PDF: 80d9b73e3436286a94a661feb3aad0c54eb5097e6bbdce31f762eb82adaa2e8b Fetched: 2026-11-10 --- page 1 --- ADVISORY DESIGN PANEL WEDNESDAY, FEBRUARY 18, 2026 AT 7:00 PM Council Chambers Langley City Hall (In-Person Meeting) A G E N D A 1) AGENDA Adoption of the February 18, 2026 agenda. 2) MINUTES Adoption of minutes from the December 3, 2025 meeting. 3) ADVISORY DESIGN PANEL INTRODUCTION & ORIENTATION Welcome and brief orientation and review of the ADP Terms of Reference. 4) GLOVER ROAD INNOVATION DISTRICT PLAN Presentation of the draft Glover Road Innovation District Plan for feedback. 5) DEVELOPMENT PERMIT APPLICATION DP 07-25 ZONING BYLAW AMENDMENT APPLICATION RZ 03-25 19890 56 Avenue. 6) NEXT MEETING TBD 7) ADJOURNMENT --- page 2 --- Document Number: 205199 MINUTES OF THE ADVISORY DESIGN PANEL HELD IN THE COUNCIL CHAMBERS LANGLEY CITY HALL 20399 DOUGLAS CRESCENT DECEMBER 3, 2025 AT 7:06 P.M. Present: Councillor Paul Albrecht (Chair) Councillor Mike Solyom (Co-Chair) Mayor Pachal (Ex Officio Member) Melissa Coderre Matt Hassett Tana McNicol Samantha Stroman Ritti Suvilai Regrets: Himanshu Chopra Jaswinder Gabri Leslie Koole Staff Present: C. Johannsen, Director of Development Services K. Kenney, Corporate Officer J. Lee, Planning Assistant A. Metalnikov, Senior Planner Chair Albrecht began by acknowledging that the land on which we gather is on the traditional unceded territory of the Katzie, Kwantlen, Matsqui and Semiahmoo First Nations. 1. AGENDA Adoption of the December 3, 2025 agenda It was MOVED and SECONDED THAT the December 3, 2025 agenda be adopted as circulated. CARRIED --- page 3 --- 1 Document Number: 204342 2. MINUTES Adoption of minutes from the November 5, 2025 meeting It was MOVED and SECONDED THAT the minutes of the November 5, 2025 Advisory Design Panel meeting be approved as circulated. CARRIED 3. PANEL MEMBERSHIP PHOTO Picture of ADP members taken to be shown at Annual Volunteer Banquet. 4. DESIGN UPDATE: DEVELOMPENT APPLICATION DP 13-24/ RZ 09-24/ OCP 01-24 19991 49 Avenue, 19990 50 Avenue, and 4951-4975 & 4991 200 Street Staff updated the Panel on the progression of the building design since it came to ADP earlier this year, comparing the original renderings with updated renderings. Staff responded to questions from Panel members. 5. DEVELOPMENT PERMIT APPLICATION DP 05-25 5721 Production Way. Ms. Woo introduced the application and spoke to the staff report dated November 25, 2025. Staff responded to questions from panel members. The applicant team entered the meeting. In attendance were the following: • Jeremy Bergmann, Hungerford Properties, Developer • TKA+D Architecture + Design: o Mike Knauer o Stefan Walsh o Pamela Mendoza Mr. Knauer made a PowerPoint presentation to the Panel providing details of the form and character of the two proposed buildings and details of the landscape design. --- page 4 --- ADP Minutes – December 3, 2025 2 The applicant team responded to questions from Panel members and received feedback from Panel members regarding the form and character of the building, from which a list of recommendations was compiled by staff for the Panel’s consideration. The applicant team left the meeting. It was MOVED and SECONDED THAT: The ADP receive the staff report dated November 25, 2025 for information; and The ADP recommends the applicant give further consideration to the following prior to the application proceeding to Council: a) Provide greater context of the building’s relationship with the 196 Street overpass (i.e. rendering of view from overpass, height comparison); b) Incorporate more design features to break up both southeast corner walls; c) Add more variation to the west building’s roofline; d) Provide weather protection structures in both outdoor amenity areas; e) Consider using pavers in front of business entrances; f) Review opportunities for greater use of stormwater management features on the site (e.g. permeable pavers, etc.); g) Update planting symbols for legibility and consistency between the planting plan and schedule (e.g. use of colour); h) Consider greater use of ornamental plantings in the Production Way outdoor amenity area; i) Provide more information on accessibility between storage lockers, elevators, and washrooms (if they are concentrated on main floor vs. provided on multiple floors, effect on accessibility, etc.); and j) Ensure plant species used are low-maintenance year-round. CARRIED 6. NEXT MEETING February 7. ADJOURNMENT It was MOVED and SECONDED THAT the meeting adjourn at 8:08 pm. CARRIED --- page 5 --- ADP Minutes – December 3, 2025 3 _________________________ Signed: ADVISORY DESIGN PANEL CHAIR _________________________ Certified Correct: CORPORATE OFFICER --- page 6 --- FRASER HIGHWAY 56 AVENUE LANGLEY BYPASS 204 ST OVERPASS 203 STREET LOGAN AVENUE GLOVER ROAD N KPU CAMPUS PLAN AREA FUTURE SKYTRAIN STATION LANGLEY DOWNTOWN Welcome to the Glover Road Innovation District Plan Public Open House. Langley City is planning an Innovation District to connect Downtown, SkyTrain, and KPU with tech and creative businesses, housing, and public spaces. The purpose is to create a welcoming and sustainable community that supports innovative industries and a high quality of life for all residents and visitors. We would like to develop the vision for this District with your input and feedback, as well as explore design options together. For additional questions, email us at: planning@langleycity.ca To learn more about this initiative and other engagement opportunities, scan this QR code with your mobile phone camera: WELCOME GLOVER ROAD INNOVATION DISTRICT PLAN --- page 7 --- WHAT WE HEARD PREVIOUS ENGAGEMENT Design Charrette In July 2025, Langley City and key project partners came together to help brainstorm the vision and develop early concepts for the Innovation District with a Design Charrette. This included visioning exercises of ‘what we do and don’t want’ as well as opportunities and challenges identified. CBRE presented early-stage market analysis engagement work and initial sketches were created that reflected aspirations for the project. Public Open House #1 In September 2025, we hosted an open house to share our work and collect feedback from the community. An online survey gave community members further opportunity to share their input. Presentation boards provided information on the project background including how the area is changing, and described what an area plan and Innovation District is. The initial design concept was presented which has since been refined to the concept which is shown on the following boards. In August, landowners and developers in the District were met with to help further guide these ideas. Based on this early work, draft themes and a design concept were developed. Feedback centred on how the community envisaged the Innovation District, what was important to prioritise and what they liked or disliked about it. This feedback has been used to help guide or confirm the direction of this Area Plan and the policies and guidelines it will put in place. --- page 8 --- DESIGN CONCEPT KEY THEMES - - - - - - - - Locate a central E/W internal street that aligns with Eastleigh Crescent and connects to 203A St, Glover Rd and Logan Ave. Provide a new service lane that gives truck access for loading and unloading from the back of properties. Create linear green streets that loop around the site and connect to the three key destinations - SkyTrain Station, Downtown Langley, and KPU. Establish a series of connected neighbourhood parks/open spaces within the site that link to the green streets. Create two ‘Hub’ buildings with adjacent open plazas, public amenities, and ground level commercial space. Establish ‘gateway’ entrances to the District with key open spaces, activated frontages, wayfinding and public art. Ensure larger parcels for possible light industrial, technology, and office use along existing industrial edge, while more fine grain block sizes line Glover Rd and Logan Ave. Create active commercial and mixed use frontages along key pedestrian thoroughfares and spaces. GREEN STREETS INTERNAL STREET NETWORK OF OPEN SPACES SERVICE LANE GATEWAYS HUB BUILDINGS PARCEL SIZE ACTIVE FRONTAGES 1 2 3 4 5 5 6 7 8 --- page 9 --- T T 0 100 200 400m N KPU Campus Future Langley SkyTrain Station Glover Rd Eastleigh Cres Logan Ave Service Lane Internal Street Logan Ave 203A St 203 St 204 St Potential 205a St Extension 206a St Langley Bypass Duncan Way Fraser Hwy Locke Ln 56 Ave K w a n t l e n C r e s D u n c a n W a y B r i t i s h C o l u m b i a H w y 1 0 P o t e n t i a l L o c a l R o a d C o l l e c t i o n D r i v e LEGEND District Boundary Rail Line Future SkyTrain Station T Civic Centre Historic Downtown Core Industrial Agriculture Low Rise Residential Mixed Employment Mixed Use Proposed Transit-Oriented Core Parks and Open Space Service Commercial Transit-Oriented Residential University District Transit-Oriented Core DESIGN CONCEPT LAND USE --- page 10 --- • Prioritize innovative uses and businesses within targeted industries. • Discourage new industries that don’t align with the objectives or vision of the Innovation District. • Support the intensification of industrial and commercial buildings within Mixed Employment areas. • Encourage a range of commercial unit sizes to provide opportunities for businesses of varied scales to locate in the District. • Encourage collaboration between businesses, like clustering of similar industries, or including co-working or shared use facilities. • Create incentives to attract preferred innovative businesses or to include innovative facilities. DESIGN CONCEPT LAND USE POLICY This Area Plan uses the land use designations as identified in the Official Community Plan (OCP) and supplements these with more specific policies to implement the Innovation District vision. No new land uses are introduced, however portions of two specific parcels within the District will be redesignated to better align with the vision and facilitate implementation. Transit Oriented Core Focus on delivering hundreds of new homes with a commercial base and opportunities for upper-floor office along key routes. Increased residential proximity to workplaces enhances vibrancy, safety, and local business viability. Mixed Employment Add an ‘Innovation’ overlay, allowing up to 15-storey heights within Mixed Employment areas to promote intensive land use and maximize the incentive for innovative design and businesses to thrive. Parks and Open Space Introduce new Parks and Open Space with publicly accessible spaces created to enhance livability and support the growing residential and worker population. University District Support the development of KPU with higher density development that fronts onto Glover Road, in line with its KPU 2050 Campus Plan. Key Policy Directions Innovative & High Employment Businesses Encouraged Like Food Tech & Advanced Manufacturing Mixed Use Development With A Commerical Base Shared or Community Spaces for Gathering Facilitated Through Hub Building Development Balancing & Well Designed Transitions Between Commerical, Residential & Industrial Uses Transit Oriented Development Up To 15 Storeys Attract Innovative Companies Who Can Take On Catalyst Sites & Lead Growth. Area Plan Goals for each Land Use: Core Objective Establish and grow the Innovation District with a strategic focus on innovative businesses, support high density residential and employment growth, and enhance public spaces for connectivity and community. --- page 11 --- T T 0 100 200 400m N KPU Campus Future Langley SkyTrain Station Glover Rd Logan Ave Service Lane Internal Street Logan Ave 203A St 203 St 204 St Potential 205a St Extension 206a St Langley Bypass Duncan Way Fraser Hwy Locke Ln 56 Ave K w a n t l e n C r e s D u n c a n W a y B r i t i s h C o l u m b i a H w y 1 0 P o t e n t i a l L o c a l R o a d C o l l e c t i o n D r i v e Eastleigh Cres Proposed Green Space Proposed Plaza Space Proposed Linear Green Corridor LEGEND District Boundary Rail Line Stream Future SkyTrain Station Existing Naturalised Area Proposed Green & Plaza Space T DESIGN CONCEPT OPEN SPACE --- page 12 --- • Create a neighbourhood network of parks and plazas. • Contribute extensively to the tree canopy. • Secure public access to key open spaces, pedestrian connections and greenways through agreement with landowners. • Provide landscaped visual and noise buffers along identified streetscapes. • Seek to engage with local First Nations in the design of parks and plazas. DESIGN CONCEPT OPEN SPACE POLICY Restaurant / Brewery Spaces Public Plaza Space In Front Of HUB Common Open Space For Businesses Activated Public Space After Hours Multi Functional Urban Lawn Space Internal Pocket Parks Adjacent To Development Public Realm The Innovation District proposes a healthy balance of open space that contribute to an exciting public realm. A network of parks and plazas are strategically located along key desire lines to complement adjacent development. Variety of Spaces These planned areas aim to support a diverse range of community needs including both large gatherings and intimate settings, as well as combining hardscape and greenery for active and passive uses. Streetscape Landscaping Purposeful wide landscaping along streets will soften transitions between land uses, particularly between industrial and residential uses, and enhance active transportation routes. Ecological Protection Existing natural features, such as Logan Creek, will be protected and enhanced as part of the plan. Integrated stormwater features will improve long-term resiliency and sustainability of the district. Key Policy Directions Core Objective Create a connected, green public realm that offers diverse open spaces, supports active transportation, enhances existing ecological features, and integrates sustainable stormwater management. --- page 13 --- 4 0 0 M e t r e s 8 0 0 M e t r e s T T 0 100 200 400m N KPU Campus Future Langley SkyTrain Station Glover Rd Eastleigh Cres Logan Ave Service Lane Internal Street Logan Ave 203A St 203 St 204 St Potential 205a St Extension 206a St Langley Bypass Duncan Way Fraser Hwy Locke Ln 56 Ave K w a n t l e n C r e s D u n c a n W a y B r i t i s h C o l u m b i a H w y 1 0 P o ten t ial L o c a l R o a d C o l l e c t i o n D r i v e Arterial Road Local Street | Lane Service Lane | Industrial Road LEGEND District Boundary Rail Line Landscape Buffer Cycle Circulation | Bike Paths Pedestrian Only Connection Shared Use Street Stream Future SkyTrain Station Highway T DESIGN CONCEPT TRANSPORTATION Linear Park Street Frontage Internal Pedestrian Greenways Transit Supportive Streets Active Frontages on Pedestrian Friendly Streets PRECEDENT IMAGES --- page 14 --- • Upgrade Glover Road and Logan Avenue as development occurs to support the vision of green streets. • Create safe, multi-modal supportive streets within the Innovation District. • Monitor the incremental impacts of development on the network so that traffic is managed. • Ensure changes to streetscapes continue to support existing distribution activities and commercial/industrial businesses. • Accommodate adequate parking underground and avoid surface level parking, except pick/ up/drop off locations, to support the efficient use of land. DESIGN CONCEPT TRANSPORTATION POLICY A Stronger Transportation Network The arrival of SkyTrain and the Innovation District vision will improve connectivity for all travel modes – walking, cycling, driving, and transit. Glover Road Logan Avenue Additional Connectivity New streets, pedestrian-only greenways , and enhanced landscaped setbacks are proposed to strengthen connections between key destinations, unlock development opportunity, and encourage active transportation. Core Objective Deliver a safe, well-connected network; support increased transit service; maintain truck and vehicle access; and manage traffic flows as redevelopment intensifies. Glover Road and Logan Avenue Glover Road and Logan Avenue will be upgraded to ensure safe, efficient travel for pedestrians, cyclists, and transit users, while supporting vibrant, active frontages as redevelopment occurs . Balanced Traffic Flow The plan prioritizes efficient vehicle and transit movement while minimizing disruption to existing landowners and daily commuters by enhancing, not removing, existing transportation features and increasing the permeability of the street grid. Key Policy Directions Dedicated Property Line Dedicated Property Line Building Setback Building Setback 2.0m 2.0m 2.0m 2.0m 2.0m ~4.0m 2.0m 10.0m Sidewalk Sidewalk Bi-Directional Bikelane Landscape Buffer / Plaza Tree Strip Tree Strip Commercial Floor 1 Commercial Floor 2 Parking 1 Parking 1 Parking 2 Proposed Glover Road Corridor Residential Floor 1 Residential Floor 2 Residential Floor 3 Residential Floor 1 Residential Floor 2 Residential Floor 3 Residential Floor 4 Residential Floor 5 FACING NORTH Scale: 1:125 Vehicle Lanes Commercial Ground Floor Building Setback Building Setback Proposed Logan Avenue Corridor 2.0m 2.0m 2.0m 2.0m Sidewalk (Existing) Sidewalk Vehicle Lanes (Existing) ~2.0m 4.0m Bi-Directional Bikelane 10.0m Existing Cascades Parkade Building Residential Floor 1 Residential Floor 2 Residential Floor 3 Residential Floor 4 Residential Floor 5 Commercial Ground Floor Tree Strip Tree Strip Dedicated Property Line Dedicated Property Line Parking 1 Parking 2 FACING WEST Scale: 1:125 --- page 15 --- FEEDBACK What do you think of our land use, open space and transportation policies? Is there anything missing? Write your response on a sticky note. --- page 16 --- • Extend the Transit Oriented Core Designation to extend housing and density opportunities. • Target large scale innovative businesses identified for high employment use. • Create a Hub Building that contains innovative uses and community spaces. • Support the intensification of industrial and commercial buildings. • Introduce safe, multi-modal streets. • Designate a half acre park/plaza space for community use. DESIGN CONCEPT PRECINCT 1 - AN INNOVATIVE GATEWAY Gateway Role Envisioned as the gateway from the Langley City Skytrain Station, Precinct 1 will open to a generous publicly accessible and multi-functional plaza which serves nearby residents and workers. Mixed-Use Activation The plan extends the Transit-Oriented Core designation along Logan Avenue to introduce mixed- use frontage, small businesses, and retail to serve a growing local population. Employment Focus Precinct 1 is planned to be a strong employment node, supporting intensified light industrial, commercial and office use. Target industries are the cultivation and handling of food a nd beverage, entrepreneurship, creative arts and industries, research, sustainability, and compact and advanced manufacturing . Connectivity 203A Street will be extended into the Precinct, connecting to a pedestrian-oriented Internal Street, creating new commercial frontage. A new Service Lane will serve a utility function for businesses, helping keep pedestrian and truck movements separate. Hub Building The Hub Building is imagined as an architectural landmark and catalyst site, hosting innovative businesses and community spaces, integrated with the plaza and walkable streets for a campus-style environment. Key Policy Directions Precinct 1 T T VIEW 1 N L o g a n C r e e k KPU Campus Future Langley SkyTrain Station Glover Rd Eastleigh Cres Logan Ave 203A St 204 St Langley Bypass Duncan Way Fraser Hwy K w a n t l e n C r e s C o l l e c t i o n D r VIEW 1 - PLAZA ALONG LOGAN AVENUE & 203A STREET CONNECTION CONCEPTUAL --- page 17 --- FEEDBACK What do you like about Precinct 1? What could be improved? Write what you like on a green sticky note. Write any concerns or possible improvements on a red sticky note. --- page 18 --- • Introduce generously sized, pedestrian-only connection from corner of Logan Avenue and Glover Road to Internal Street. • Establish corner plaza and pocket park spaces providing additional amenity for new residents. • Buffer future residential and industrial uses with green space. • Create mixed use buildings that maximise ground-oriented retail uses, above-ground office space, and residential floors. • Target innovative businesses that support ground-oriented activated streets. • Supply a diversity of units for a range of business sizes and places to live. • Connect the Internal Street to Eastleigh Crescent and enhance intersection. DESIGN CONCEPT PRECINCT 2 - AN INNOVATIVE COMMUNITY Transit-Oriented Core This land use designation capitalizes on proximity to the SkyTrain Station and downtown, with priority for high-density mixed-use buildings. Innovative Uses Smaller ground-oriented units will be utilised to support innovative businesses like creative studios, start-ups with only a few people, specialized consultants or satellite offices for larger businesses, and local food and beverage options. Complete Community Precinct 2 will aim to establish a complete community, with diverse housing options, retail space focused on active frontages, and various commercial unit sizes to suit a range of business needs. This will promote people living and working within the Innovation District – encouraging short commutes, and supporting new businesses with a customer base. Public Realm & Connectivity A corner plaza at Glover Road and Logan Avenue will create an inviting entrance from downtown, connected via a pedestrian greenway with activated retail frontages. The Internal Street is planned to link to Eastleigh Crescent, establishing a new neighbourhood block. Key Policy Directions Precinct 2 T T VIEW 2 N L o g a n C r e e k KPU Campus Future Langley SkyTrain Station Glover Rd Eastleigh Cres Logan Ave 203A St 204 St Langley Bypass Duncan Way Fraser Hwy K w a n t l e n C r e s C o l l e c t i o n D r VIEW 2 - GLOVER ROAD & LOGAN AVENUE INTERSECTION CONCEPTUAL --- page 19 --- FEEDBACK What do you like about Precinct 2? What could be improved? Write what you like on a green sticky note. Write any concerns or possible improvements on a red sticky note. --- page 20 --- • Target innovative businesses in light industrial and production industries. • Encourage the stacking of light industrial floors for intensive and efficient use of land. • Support enhancement of Collection Drive and intersections. • Maintain protection of Logan Creek and Glover Road swale and look for enhancement opportunities. DESIGN CONCEPT PRECINCT 3A - AN INNOVATIVE ENTRANCE Location and Gateway Role Precinct 3a at the northern end of the Innovation District along Glover Road and Langley Bypass, serves as an entrance for vehicles to the city. Visibility Corner sites at the Langley Bypass and Glover Road intersection cater to businesses that benefit from the high visibility and accessibility. Employment Node Precinct 3a is envisaged for high-employment uses that could benefit from strong transit access and direct highway connections for trucks and convenient pick-up/drop-off. Intensive light industrial uses including assembly, manufacturing and production will be supported. Corner Definition This vision requires well defined edges at key intersections with reduced setbacks to shift to a more walkable neighbourhood and support the intensification of the adjacent University District. Key Policy Directions Precinct 3a T T VIEW 3 N L o g a n C r e e k KPU Campus Future Langley SkyTrain Station Glover Rd Eastleigh Cres Logan Ave 203A St 204 St Langley Bypass Duncan Way Fraser Hwy K w a n t l e n C r e s C o l l e c t i o n D r VIEW 3 - GLOVER ROAD & LANGLEY BYPASS INTERSECTION CONCEPTUAL --- page 21 --- FEEDBACK What do you like about Precinct 3a? What could be improved? Write what you like on a green sticky note. Write any concerns or possible improvements on a red sticky note. --- page 22 --- • Establish second Hub Building within KPU campus. • Create a large park/plaza space adjacent the Hub. DESIGN CONCEPT PRECINCT 3B - AN INNOVATIVE EDUCATION • Enable and implement the KPU 2050 Official Campus Plan: • Enhance campus identity and street presence by replacing surface parking with compact development and a welcoming frontage along Glover Road. • Redesign Kwantlen Crescent as a gateway entrance that prioritizes pedestrians and cyclists. • Protect natural ecosystems and increase biodiversity. • Create opp ortunities to represent Indigenous Peo ples in through design. Destination Point Precinct 3b occupies the University District with KPU campus – a destination point and an active transportation connection between other key destinations (SkyTrain and Downtown) – through the planned upgrade of Glover Road and Logan Avenue. Hub Building and Gateway Precinct 3b will introduce a second landmark hub building along Glover Road with shared community spaces for gathering and innovation, complemented by an adjoining plaza that activates the precinct and university. Together these will be designed to foster creative collisions and unplanned encounters, reinforcing the Innovation District’s philosophy of diverse uses, ideas, and people in vibrant shared spaces. KPU Campus Plan Revitalization of Kwantlen Crescent, under the KPU 2050 Campus Plan, will form a celebrated entry point, that accommodates all modes of travel, and builds campus identity with landmark buildings, frontages and open spaces. Key Policy Directions Precinct 3b T T VIEW 4 N L o g a n C r e e k KPU Campus Future Langley SkyTrain Station Glover Rd Eastleigh Cres Logan Ave 203A St 204 St Langley Bypass Duncan Way Fraser Hwy K w a n t l e n C r e s C o l l e c t i o n D r VIEW 4 - GLOVER ROAD & KPU ENTRANCE CONCEPTUAL --- page 23 --- FEEDBACK What do you like about Precinct 3b? What could be improved? Write what you like on a green sticky note. Write any concerns or possible improvements on a red sticky note. --- page 24 --- DESIGN GUIDELINES TO FOLLOW NEXT Purpose of Design Guidelines Design Guidelines provide council-approved direction on ‘how’ to implement policies. They offer best practice guidance for achieving high- quality development outcomes to help people make decisions and understand requirements. Building Design Key spatial conditions of buildings and how they address the site, like where are they placed, dimensions, and orientation. Frontages How buildings interface with the streetscape and public realm, creating interesting and active ground floors that encourage walking. Servicing and Utilities Integrated servicing and utilities in a way that is functional but avoids impacting primary frontages, pedestrian movement or the visual quality of development. Streetscape & Public Realm How streets, open spaces and the space around buildings function and be attractive, like the inclusion of amenities and parking. Safety Incorporating design principles that reinforce personal safety and manage the impacts of anti-social behaviour. Building Articulation & Materiality The external design of building façades that ensures development is high quality, consistent and responsive to prominent street faces. Sustainable Landscaping A planting and stormwater management approach that is specific to the area and builds resilience. Precinct Guidelines Specific guidelines that pertain to outcomes within a Precinct, like the look and feel of the Hub building. Guidelines set the standard for the desired form and character of new development, guiding how it should look and what it should include. Application Design Guidelines are intended to guide future architectural applications within the Innovation District. This includes all future residential, commercial, and mixed-use projects. These guidelines focus on what is experienced by the public - including frontages, interfaces with the street, impacts on the local community, etc. Vision Alignment Once policies are finalized, Design Guidelines will be added to enable the implementation of the vision of the Area Plan policies. The Design Guidelines will provide detail on how design can foster innovation and innovative businesses, while also creating a transit-oriented, complete, and vibrant urban community - ensuring that future growth reflects the vision. Key Guidelines Topics --- page 25 --- A DVISORY D ESIGN P ANEL R EPORT To: Advisory Design Panel Subject: Development Permit Application DP 0 7 - 25 (19890 56 Avenue) From: Anton Metalnikov, RPP, MCIP Senior Planner Bylaw #: 3334 File #: 6620.00 Date: February 6, 2026 Doc #: RECOMMENDATION: THAT this report be received for information. 1. PROPOSAL: Development Permit and rezoning applications for a 6-storey, 30-unit apartment building at 19890 56 Avenue. 2. CITY BYLAWS & POLICIES: Applying to the subject properties: a. Official Community Plan (OCP): Low Rise Residential (maximum 6- storey height and Floor Area Ratio of 2.6); and b. Zoning: RM1 Multiple Residential Low Density Zone. The proposed development: a. Is consistent with the OCP; b. Requires a rezoning to RM3 Multiple Residential High Density Zone to enable the proposed development in alignment with the OCP; and c. Requires a Development Permit for a multi-unit residential development. --- page 26 --- To: Advisory Design Panel Date: February 6, 2026 Subject: Development Permit Application DP 07-25 Page 2 3. DETAILED BACKGROUND INFORMATION 4. SITE CONTEXT (19890 56 Avenue) The proposed development site consists of a single 3-storey strata 5-plex property within an existing multi-unit residential area. Its surroundings include: • North: 56 Avenue (arterial street), and a 2-storey mixed-use building on lands designated “Industrial” within the City’s OCP; • East: 2-storey 7-plex; Applicant: Paramorph Architecture Inc. Owner: HOV Investments Ltd. Civic Address: 19890 56 Avenue Legal Description: Strata Lots 1 - 5 of Section 3, Township 8, New Westminster District, Strata Plan LMS270, Together with an Interest in the Common Property in Proportion to the Unit Entitlement of the Strata Lot as Shown on Form 1 Site Area: 1,519 m 2 (0.38 ac) Number of Units: 30 apartments Unit Density: 197 units/ha (79 units/ac) Gross Floor Area: 2,907 m 2 (31,292 ft 2 ) Floor Area Ratio 1.914 Lot Coverage: 37.79% Parking Required: 51 spaces (including 3 accessible spaces) Parking Provided: 44 spaces (including 2 accessible spaces) OCP Designation: Low Rise Residential Zoning: RM1 Multiple Residential Low Density Proposed Zoning: RM3 Multiple Residential High Density Variances Requested: 1,519 m 2 site area (1,850 m 2 min.) 25.8 m site width (30 m min.) 6-storey height (4 storeys max.) 3 m front setback (7.5 m min.) 6 m interior setbacks (7.5 m min.) 38 resident parking spaces (45 spaces min.) 50% small car parking spaces (40% max.) 42 m 2 indoor amenity space (69 m 2 min.) Estimated Development Cost Charges (DCCs): $963,855.00 (City - $473,965.00, GVS&DD - $181,775.00, GVWD - $238,820.00, MV Parks - $13,760.00, SD35 - $16,500.00, TransLink - $39,035.00) Community Amenity Contributions (CACs): $180,000.00 --- page 27 --- To: Advisory Design Panel Date: February 6, 2026 Subject: Development Permit Application DP 07-25 Page 3 • South: Public lane, and Encore Apartments (4-storey, 62-unit apartment building); and • West: 3-storey 5-plex. Context Map The site is within a 10-minute walk of Downtown and benefits from access to its shops and services. Other key nearby neighbourhood amenities include: • Three bus routes within a 5-minute walk; • Linwood Park (10-minute walk); • Nicomekl Elementary School (10-to-15-minute walk); and • Timms Community Centre (15-minute walk). 5. PROPOSED SITE AND BUILDING DESIGN A. Site Layout and Building Massing The proposed development is a 6-storey apartment building that steps down to 5 storeys at its northern 56 Avenue frontage to open up to a rooftop patio. The building makes use of a simple rectangular configuration that responds efficiently to its long and relatively narrow site and its required setbacks, which results in wider and shallower apartment units than typical. A single Subject Site --- page 28 --- To: Advisory Design Panel Date: February 6, 2026 Subject: Development Permit Application DP 07-25 Page 4 level of underground parking is provided, with additional surface parking provided on the rear half of the site. The building’s ground floor screens this parking area from the lone street frontage, and its upper floors partially extend their footprint over it on columns. Pedestrian access is provided to both 56 Avenue to the north as the main entrance as well as the lane to the south, while vehicle access is limited to this rear lane. B. Building Elevations and Materials The building is clad predominantly with fibre cement panels and lap siding in shades of brown and grey. Extruded frames and masses, material variation on inside walls and soffits, and cantilevered black metal railing balconies work with the siding’s textures to add depth to the elevations. C. Landscaping Landscaping consists of a planted perimeter and an accessible rooftop deck. At grade, the softscape consists of a mix of plantings, lawn, and trees, with concrete patios and walkways and feature pavers used to distinguish entrances to the property both at the front entrance and the rear vehicle driveway. Solid black aluminum fencing is provided on the side property lines and at the ground floor patios, with shorter fencing on the sides near the front of the property. The rooftop patio is also surfaced with pavers and buffered on its edge with plantings. This outdoor amenity is programmed with seating and dining areas and set back from the roof edges for safety and privacy. Inverted U-style racks are used for bicycle parking. D. Building Program and Details The building’s unit mix includes: • 4 one-bedroom units (13%); • 17 two-bedroom units (57%); and • 9 three-bedroom units (30%). 6 (20%) of the units are adaptable. Resident storage facilities are provided within in-unit storage rooms. 120 m 2 of total amenity space is provided, including 42 m 2 of indoor space and 78 m 2 of outdoor space. 6. SUSTAINABILITY FEATURES • Construction techniques that minimize site disturbance and protect air quality; • Lighting systems meeting ground-level light pollution reduction principles; --- page 29 --- To: Advisory Design Panel Date: February 6, 2026 Subject: Development Permit Application DP 07-25 Page 5 • Non-water dependent and drought-tolerant materials in the landscape design served by an irrigation system with central control and rain sensors; • Water-conserving toilets; and • All parking stalls are pre-wired for electric vehicle charger installation, with 4 chargers installed. 7. CPTED The applicant’s proposal benefited from a comprehensive Crime Prevention Through Environmental Design (CPTED) review by a qualified consultant whose recommendations were incorporated into the plans. 8. VARIANCES The proposed application was designed around the new R3 Low Rise Residential Zone, which was developed for the upcoming new Zoning Bylaw to implement the OCP’s Low Rise Residential designation under which this property falls. The new Zoning Bylaw has received 3 rd Reading (“approval in principle”) from Council. Accordingly, a number of variances are required for elements that are consistent with the new Zoning Bylaw but not the current one, namely the 1,519 m 2 site area, the 6-storey height, the 3-metre front setback, the 6-metre interior setbacks, the 38 resident parking spaces, the 50% small car parking spaces, and the 42 m 2 indoor amenity area. The one variance not meeting the new Zoning Bylaw’s requirements is the 25.8- metre site width. This is very close to the new R3 Zone’s minimum (26 metres), reflects the block’s existing multi-unit development and lot pattern, and maintains the ability of neighbouring lots to assemble into wider development sites. Based on this rationale, staff support the requested variances. 9. ENGINEERING These requirements have been issued in considering a potential development for an apartment development at the above noted addresses. The Developer, or Applicant shall undertake sanitary and water hydraulic modelling reports, a Traffic Impact Assessment (TIA) report as well as an assessment of the existing road structures. The off-site servicing drawing submission will not be accepted until all report recommendations are finalized. Additional requirements may be identified if warranted through the development of the reports or design. --- page 30 --- To: Advisory Design Panel Date: February 6, 2026 Subject: Development Permit Application DP 07-25 Page 6 A. OFF-SITE SERVICING REQUIREMENTS 1. Road Dedication and Easement a. Approximately 3.6m road dedication on 56 Avenue is required to achieve an ultimate 29.0m wide road right-of-way. Developer shall determine the precise dedication and a provide legal survey plan. b. Developer to confirm the lane meets the 8.0m width requirement for emergency vehicle access. 2. Road Works a. Vehicle access to the site shall be off the lane on the east side of the property. Any other contemplated access location must demonstrate that the proposed driveway will not impede the future access of 19876 56 Avenue and the safe movement at the lane and Brydon Cres intersection. b. Garbage and recycling enclosures, and collection vehicle access route and turning radius shall be accommodated on the site without backing out to City highway (lane is considered a City highway). c. The traffic consultant will determine the appropriate scope of the TIA in accordance with the City’s Design Criteria Manual (DCM). The traffic consultant should consider traffic calming in the road design. The Consultant must submit the TIA Terms of Reference for City review and acceptance prior to commencing the study. The scope and extent of the off-site works shall also be determined in part from the TIA recommendation. TIA report must be generally accepted prior to proceeding the application to Council readings. d. 56 Avenue shall be upgraded in accordance with the City standard drawing SS-R01. e. The lane is complete. The Applicant must confirm, and consider the service locations and the age of the pavement. f. The permanent pavement restoration, including all fees for all roads shall be in accordance with Section 8.25 of the DCM. g. The condition of the existing pavement along the proposed project’s frontages shall be assessed by a geotechnical engineer. Pavements shall be adequate for an expected road life of 20 years under the expected traffic conditions for the class of road. Road construction and asphalt overlay designs shall be based on the analysis of the results of Benkelman Beam tests and test holes carried out on the existing road which is to be upgraded. If the pavement is inadequate, it shall be remediated by the Developer, at the Developer’s expense. 3. Watermain and Water Service Connection a. A hydraulic modelling report is required to ensure the City water network has sufficient pressure and fire flow capacity to support the --- page 31 --- To: Advisory Design Panel Date: February 6, 2026 Subject: Development Permit Application DP 07-25 Page 7 development, and that the development will not negatively impact City infrastructure. This work must be completed by City’s modelling consultant. Developer must provide a cheque for Engineering to initiate the work with the consultant. Please contact Engineering for the cost estimate. b. One new water service connection is required. c. A water meter is required to be installed on private property in accordance to the City's DCM. The City will require a refundable security bond (to be determined at fee & security calculation stage) for the water meter. d. Additional C71P fire hydrants may be required to meet bylaw and firefighting requirements as per DCM Section 3.10 and approved by the City Engineer and the City of Langley Fire Rescue Service. 4. Storm & Sanitary Mains and Service Connections a. A hydraulic modelling report will be required to ensure the City main has sufficient capacity to support the development, and that the development will not negatively impact City infrastructure. This work must be completed by City’s modelling consultant. Developer must provide a cheque for Engineering to initiate the work with the consultant. Please contact Engineering for the cost estimate. b. The development shall be serviced by one sanitary service connection and one storm service connection. c. On-site infiltration shall be considered as identified in Section 5.7 of the DCM. A storm water management plan for the site is required. Pre-development release rates shall not include climate change effect. d. Runoff catchment area analysis is required to assess if the existing storm system can convey the 1:5 year event. See section 4.0 in the DCM for details. e. Site surface drainage needs to be treated in accordance with Section 5.4 of the DCM. f. Stormwater run-off generated on the site shall not impact adjacent properties, or roadways. 5. Street Light and Pedestrian Light a. Existing street light illumination along 56 Avenue will need to be assessed to ensure current standards are met. b. Pedestrian level lighting is required along the 56 Avenue frontage. c. Analysis and design shall be prepared by a qualified electrical consultant to ensure street lighting and lighting levels meet the current criteria outlined in Section 9.0 of the DCM. d. Any required street lighting upgrades, relocation, and/or replacement shall be done by the Developer at the Developer’s --- page 32 --- To: Advisory Design Panel Date: February 6, 2026 Subject: Development Permit Application DP 07-25 Page 8 expense. Any existing BC Hydro lease-lights to be removed and disposed of off-site. 6. Eliminate the existing overhead BC Hydro/telecommunication infrastructure along the development’s frontages and replace with underground infrastructure. The developer is responsible for contacting BC Hydro and telecom companies to start the design work. If undergrounding is not possible at this time, pre-ducting the frontage is typically required by the Developer with cash in-lieu contribution for the incomplete portion of the work. 7. Undergrounding of hydro, telecommunication to the development site is required, complete with an underground or at-grade transformer. Transformers servicing developments are to be located on private property with maintenance access located on private property. All transformers to be wrapped upon installation by the Developer. B. SECURITY BOND AND ENGINEERING FEES 1. The City will require a Security Deposit based on the estimated construction costs of installing civil works, as accepted by the City Engineer. 2. The City will require inspection and administration fees in accordance to the Subdivision Bylaw based on a percentage of the estimated construction costs, as per the City’s Subdivision and Development Servicing Bylaw 2021 #3126. 3. A deposit for storm, sanitary, and water services are required, which will be determined by City staff after detailed civil engineering drawings are submitted, sealed by a Professional Engineer. 4. The City will require a refundable security bond for the installation of a water meter(s) to current City standards as per the DCM. 5. A signed and sealed pavement cut form (Form F-2 of the City’s DCM) shall be completed by the developer’s consulting engineer. Upon the review and approval of the City Engineer of the submitted form, the corresponding Permanent pavement cut reinstatement and degradation fees shall be paid by the Developer. All design and construction work to be done to the City’s Design Criteria Manual (DCM), and the City’s Subdivision and Development Servicing Bylaw (SDSB). --- page 33 --- To: Advisory Design Panel Date: February 6, 2026 Subject: Development Permit Application DP 07-25 Page 9 As per the City’s DCM requirement, the developer and their consulting engineer shall submit to the City Engineer a signed and sealed copy of Form F-1 (Commitment by Owner and Consulting Engineer) prior to starting their design works. 10. FIRE DEPARTMENT COMMENTS Fire department access for the entire project was reviewed to ensure adequate access was in place for apparatus and firefighters. A construction fire safety plan shall be completed, complete with crane inspection records. A progressive standpipe installation will be required as construction rises. Standpipes will be required to extend to the parkade, in the elevator lobby, and to both rooftop exit stairway. Stairwells act as an area of refuge and should be made as wide as possible (60”) All garbage/recycling containers must be stored in a fire rated, sprinklered room, and must be of adequate size to prevent spillover into adjacent area. Marked Exits must not be on a FOB system. A radio amplification bylaw is currently in development and will need to he adhered to. Consideration will be given to the installation of power banks in the storage room lockers for e-bikes charging. A Fire Safety plan and FD lock box (Knox box) will be required before occupancy. A 4” storz FDC will be required and is to be located on concrete pedestal at the front of the building. The exact location to be discussed with the Fire Department at a later date. 11. BUDGET IMPLICATIONS In accordance with Development Cost Charges Bylaw, 2024, No. 3256 the proposed development is estimated to contribute $473,965.00 in Development Cost Charges (DCCs) to City Development Cost Charge accounts and $180,000.00 in Community Amenity Contributions. --- page 34 --- To: Advisory Design Panel Date: February 6, 2026 Subject: Development Permit Application DP 07-25 Page 10 Prepared by: _______________________ Anton Metalnikov, RPP, MCIP Senior Planner Concurrence: Concurrence: __________________________ _______________________ Roy M. Beddow, RPP, MCIP Carl Johannsen, RPP, MCIP Deputy Director of Development Services Director of Development Services Concurrence: Concurrence: __________________________ __________________________ David Pollock, P.Eng. Scott Kennedy Director of Engineering, Parks, Fire Chief & Environment Attachments --- page 35 --- To: Advisory Design Panel Date: February 6, 2026 Subject: Development Permit Application DP 07-25 Page 11 DEVELOPMENT PERMIT APPLICATION DP 07-25 REZONING APPLICATION RZ 03-25 Civic Address: 19890 56 Avenue Legal Description: Strata Lots 1-5 of Section 3, Township 8, New Westminster District, Strata Plan LMS270, Together with an Interest in the Common Property in Proportion to the Unit Entitlement of the Strata Lot as Shown on Form 1 Applicant: Paramorph Architecture Inc. Owner: HOV Investments Ltd. --- page 36 --- --- page 37 --- --- page 38 --- --- page 39 --- --- page 40 --- --- page 41 --- --- page 42 --- --- page 43 --- --- page 44 --- --- page 45 --- --- page 46 --- --- page 47 --- --- page 48 --- --- page 49 --- --- page 50 --- --- page 51 --- --- page 52 --- --- page 53 --- --- page 54 --- --- page 55 --- --- page 56 --- --- page 57 --- --- page 58 --- --- page 59 --- --- page 60 --- --- page 61 --- --- page 62 --- --- page 63 --- --- page 64 --- --- page 65 --- --- page 66 --- --- page 67 --- --- page 68 --- --- page 69 --- --- page 70 --- --- page 71 --- --- page 72 --- --- page 73 --- --- page 74 --- --- page 75 --- --- page 76 --- --- page 77 --- --- page 78 --- --- page 79 ---