The Thursday Roundup: Langley in 5 minutes, every Thursday. Free, no ads. Join free
Submit
Explained · Murrayville

The 300 long-term care beds promised for Langley Memorial: a timeline, and where it stands

Announced in September 2024 with an opening pencilled in for 2030. Two years on there is a business plan, no start date and a new government. Every date that matters, what each side has said, and what to watch next.

The main entrance of Langley Memorial Hospital, with an ambulance parked out front
Photo: Canuckle, CC BY-SA 3.0, via Wikimedia Commons

Two years and seven weeks ago, a health minister stood at Langley Memorial Hospital and said 300 new long-term care beds would be built on the grounds, opening around 2030. Nothing has been dug. Here is everything that has happened since, in order, so you can judge for yourself how real the promise is now.

What was promised
A new, publicly funded 300-bed long-term care home, built and run by Fraser Health, on land next to Langley Memorial Hospital in Murrayville
When announced
September 11, 2024, shortly before the 2024 provincial election campaign began
Cost
Never set. The minister's own per-bed range at the announcement works out to $240 million to $450 million
Opening
2030 was the date given in 2024. No construction start has been announced
Status, October 26, 2026
Business plan complete; no funding approval, no start date; a new provincial government elected October 24

September 11, 2024: the announcement

Health Minister Adrian Dix, with Langley’s two NDP MLAs, Fraser Health’s CEO and the head of the hospital foundation beside him, announced that Fraser Health would acquire additional land at the Langley Hospital campus and build a 300-bed care home there, taking the number of long-term care homes in the Langley catchment from four to five. The business plan, the Province said, was expected to be complete in fall 2024.

Asked what it would cost, Dix said recent long-term care projects had come in at $800,000 to $1.5 million a bed, which is where the $240 million to $450 million figure comes from. He put the opening at 2030, said the design would favour single rooms over the two-to-five-bed wards of older homes, and added that these were “not the sole long-term care beds that we need, but it’s a pretty good start.” The Langley Community Health & Hospital Foundation said it would help buy the land. Its executive director noted Langley was the fastest-growing community in BC by rate of growth.

The election writ dropped shortly after. The NDP was re-elected, and the project became one of the things its Langley campaign pointed to.

February 17, 2026: Budget 2026 slows the care-home program

Facing a record deficit, the Province’s 2026 budget “re-paced” seven approved long-term care projects, in Abbotsford, Campbell River, Chilliwack, Kelowna (the Cottonwoods replacement), Delta, Fort St. John and Squamish, along with the second phase of Burnaby Hospital and a student housing project at UVic. The budget papers said the government was reviewing its whole long-term care building program to get beds built more cheaply.

Langley was not on the list. That was not good news so much as a sign of where things stood: the seven were approved projects being slowed down, and Langley’s, on the public record, had not yet been approved at all.

April 13 to May 7, 2026: the City asks, the Province answers

Langley City council, whose mayor said he heard about the health system from many residents even though hospitals are not a municipal job, voted on April 13 to write to the Province for a status report. The letter went out April 17 to Health Minister Josie Osborne, asking whether a business plan existed and for a timeline with a construction start and an opening date.

The reply, dated May 7, came instead from Infrastructure Minister Bowinn Ma. Fraser Health had completed the business plan, she wrote, and “on a cost per bed basis, the estimated cost for the Langley long term care was as high or higher than the seven projects that were re-paced in Budget 2026.” No start date was given. The City’s letter had put the case plainly: Langley Memorial is operating with 200 long-term care beds, and the shortfall against demand is growing. The mayor of the day called the answer “obviously disappointing.”

October 9 to 23, 2026: the campaign

A snap provincial election followed the October 17 municipal vote by a week, and long-term care was on both platforms.

The BC Conservatives, in a seniors plan released October 9, promised to build more long-term care beds, arguing the NDP had let design rules push the cost of some proposed beds to $1.8 million each, and said they would review the design requirements with care providers and builders to deliver cheaper beds faster. They also promised a Long Term Care Access and Transparency Act to publish regional waitlist and capacity figures monthly. Just before the election was called, Minister Ma had said the government was working with health authorities on standardized designs to bring the per-bed cost down.

On October 23, campaigning in downtown Langley City, NDP leader David Eby was asked directly about the Langley home. He acknowledged “challenges” in bringing down the per-bed cost, said standardization was the fix, and promised: “Shovels will be in the ground on this and seven other long-term care facilities” if the NDP was re-elected.

October 24, 2026: a new government

The Conservatives won a majority. All three Langley ridings re-elected Conservative MLAs. Asked about her priorities in Victoria, Langley-Walnut Grove’s Misty Van Popta named Langley Memorial Hospital, long-term care and schools; Langley-Willowbrook’s Jody Toor said “our public safety, our hospital, our seniors.” Neither has said specifically what will happen to the 300-bed plan, and the seniors plan the party released on October 9 spoke of beds in general rather than this site. Our MLA pages have their contact details.

So where does it actually stand?

In the hands of a government that has not yet been sworn in. What exists today is a completed Fraser Health business plan, the Province’s own statement that the per-bed cost is at the high end, and a parcel of land on the hospital campus that the 2024 announcement said Fraser Health would acquire (whether that purchase has closed has not been reported). What does not exist is a funding approval, a construction contract, a start date or a confirmed opening year. The 2030 opening, which already assumed shovels in the ground by about now, is the first thing we would expect to move.

Two things cut in the project’s favour: both main parties went into the election promising to build long-term care beds more cheaply, and the Province had already said the fix was standardized designs, which is work that carries over regardless of who is in office. Two things cut against it: the cost-per-bed problem that stalled it in May has not been solved publicly, and a new government’s first budget is where projects get re-ranked.

What to watch, and who to ask

  • The new cabinet. Which ministers take Health and Infrastructure, and whether the Langley home appears in their mandate letters or the first budget. Both Langley MLAs have put the hospital at the top of their lists; ask them where this project is on it.
  • Fraser Health’s capital projects listing on its website, where its approved building projects are set out.
  • The new councils. Langley City’s outgoing council was the one writing letters; the new council and mayor take office in November and will decide whether to keep asking. The Township’s new council likewise.
  • The hospital foundation, which pledged to help with the land and will know when that purchase moves.

We will keep this timeline current. If you or a family member are on a long-term care waitlist in Langley now, our seniors guide has the Fraser Health access line for care assessments, the existing homes and where to get help with the forms.