- City of Langley
- Building Division, City Hall, 20399 Douglas Crescent. 604-514-2804, [email protected]. Forms and guides
- Township of Langley
- Permits, Licences and Inspections, Civic Facility, 20338 65 Avenue. 604-533-6018, [email protected]. Apply online
- Smallest fee
- City $200 for work up to $10,000; Township $100 minimum
- Start early, pay double
- City: fee is doubled. Township: fee may be doubled
- Last checked
- November 20, 2026
Do you need a building permit in Langley? For almost any new building, addition, structural renovation, finished basement or suite, yes, from whichever Langley you live in. The City of Langley and the Township of Langley are separate municipalities with separate building departments, fee bylaws and inspection systems. The City lets a small detached shed under 10 m² go without a permit; the Township takes nearly every application online. If you’re not sure which side of the line you’re on, our City vs Township guide sorts it out.
City vs Township building permits at a glance
| City of Langley | Township of Langley | |
|---|---|---|
| Who handles it | Building Division, City Hall | Permits, Licences and Inspections, Civic Facility |
| How to apply | Application form, Form 1 and two sets of plans no smaller than 11" x 17" | Online through eApply with a MyTownship account; paper isn’t accepted where online is available |
| Title search | No older than 48 hours | No older than 30 days |
| Shed with no permit | Detached and under 10 m² (107.64 sq ft), setbacks still apply | No size exemption in the Township’s residential guide |
| How the fee is figured | Value of the work, including excavation and site prep | Township’s own price per m² for each kind of space |
| Fee on $60,000 of work | $678.30 | $630.25 |
| Registered professional discount | 10%, up to $250 | 2.5% |
| Booking inspections | Phone 604-514-2804 by 3 pm the day before | eInspections in MyTownship by 3:30 pm the business day before |
| Re-inspection | $150 | $165 |
Do I need a building permit?
In the City of Langley, no excavation, building, alteration, repair or demolition can start without a permit. The City’s guides spell out the common cases:
- Sheds and accessory buildings. A detached building under 10 m² doesn’t need a building permit, but it still has to meet the zoning setbacks for accessory buildings. At 10 m² or bigger, or for any addition to one, you need a permit before you start.
- Decks. A new deck more than 2 feet above the finished ground needs a permit. So does repairing, renovating or adding to an existing deck, and putting a cover over one, bought or built on site.
- Fences and low retaining walls. The City’s building bylaw leaves fences, paving and retaining structures under 1.2 m out of its definition of a structure. Zoning still controls how tall a fence can be.
In the Township of Langley, the residential construction guide lists when you need one: building any new building or structure; altering, repairing, renovating, moving or adding to an existing one; finishing a basement or building a suite; chimneys and wood stoves or inserts; retaining walls over 1.2 m; and new plumbing fixtures or re-routed pipes. The Township’s building bylaw also leaves fences, paving and landscaping out of its definition of a structure. The guide gives no small-shed exemption, so email [email protected] with your shed’s size before you build.
On both sides, electrical work is permitted by Technical Safety BC, not by the City or the Township.
How to apply for a building permit in Langley
City of Langley
Pick the guide that matches your job from the City’s Building Permits page. There are separate packages for new houses, additions and alterations, suites, accessory buildings, sundecks, garage conversions and demolitions. A typical small residential application needs:
- The building permit application form and Form 1, the owner’s acknowledgement.
- A title search no older than 48 hours.
- An Agent’s Authorization form if a contractor applies for you.
- Two sets of plans at proper scale, on paper no smaller than 11" x 17". Pencil drawings and graph paper aren’t accepted.
- A Schedule B and proof of insurance (Form 2) if an engineer is involved.
You pay a non-refundable application fee up front. The rest of the building and plumbing fees is worked out after plan review, and a refundable damage deposit is collected before the permit is issued. Every contractor working in the City needs a City business licence.
Township of Langley
Township applications go through eApply, linked from each permit type on the Residential Building Permits page. You need a MyTownship account first, and the application links to it automatically. Paper applications stopped being accepted on February 3, 2025 for every permit type that can be filed online, which now covers new houses, accessory buildings, additions and alterations, suites, basement finishes, pools, retaining walls and more.
For an addition or accessory building, plan on a title search or freehold transfer no older than 30 days, a site plan, drawings, a soil declaration, an erosion and sediment control form, and a Declaration of Intended Use for accessory buildings. On septic, your onsite wastewater practitioner fills in a Fraser Health filing or the Township’s referral form. If any trees are coming down, check the Township’s Tree Protection Bylaw before your drawings are done: it can hold up a permit.
Building permit fees
City of Langley fees
From Schedule 4 of the Building and Plumbing Regulation Bylaw No. 2498, plus applicable taxes:
- Application fee for single-family work (new, additions, alterations, renovations): $200
- Permit fee: $200 for work up to $10,000; then $200 plus $10.56 per $1,000 over $10,000; $576 plus $10.23 per $1,000 over $50,000; $1,088 plus $9.63 per $1,000 over $100,000; $5,286 plus $10 per $1,000 over $500,000
- Plumbing: $100 base plus $40 per fixture
- Demolition $200, re-inspection $150, transfer or renewal $200
The fee is doubled if work starts before the permit is issued. It’s cut by 10%, to a maximum of $250, when a registered professional certifies the work meets the Building Code.
Township of Langley fees
From Schedule 18 of the Fees and Charges Bylaw No. 4616, last amended July 27, 2026, before tax:
- Permit fee: $100 minimum; $52.50 for the first $1,000 of value; $9.75 for each further $1,000 up to $50,000; $10 per $1,000 from $50,000 to $1 million; $9.50 per $1,000 after that
- How the Township values your job: $545 per m² to renovate an existing house, $450 per m² for a garage or closed accessory building, $200 per m² for a carport or open structure, $700 per m² to finish a basement, $1,220 per m² for a main storey
- File records fee on additions and accessory permits: 0.015% of value, minimum $32.25
- Re-inspection $165, demolition $150, renewal $100
A worked example: a 20 m² closed shed or garage is valued at $9,000, so the permit is $130.50 plus the $32.25 records fee. The Township may double the fee for work started without a permit, and it charges double for each inspection where work was covered up before it was seen. The registered professional reduction is 2.5%.
How to book building inspections
City of Langley: call the 24-hour inspection line, 604-514-2804, by 3 pm the day before. Have the address, permit number, type of inspection, a contact name and number, and a morning or afternoon preference. Paperwork for an inspection goes to the Building Division counter 24 hours ahead.
Township of Langley: every request goes through eInspections in MyTownship by 3:30 pm on the business day before. Link the permit with the 4- to 6-digit access code from your application, and share that code with your trades. Put your contractor’s business licence number in the notes, or type “homeowner” if you’re doing the work yourself. Next-day visits aren’t guaranteed, and the first inspection comes before any work starts, to check bins, tree protection fencing and silt control.
In both places, keep the approved drawings on site, post the permit card and address where they can be seen, don’t cover work until it’s passed, and don’t move in until the final inspection is accepted and occupancy is authorized in writing.
How long does a building permit take?
In March 2025 the Township said smaller permit types were averaging about two weeks, helped by new staff and the online system. How long yours takes depends on how busy they are, how complex the job is and whether the application is complete. The City’s guides don’t give a turnaround time, so ask the Building Division when you apply.
Once a Township permit is issued, work has to start within six months, can’t stop for more than six months, and has to be finished within two years, or the permit lapses.
Common projects: decks, sheds, suites, fences and renos
- Decks: in the City, permit over 2 feet high and for any deck cover. Our deck builders list has local firms.
- Sheds: City, under 10 m² is permit-free; in the Township, ask first. Shed and greenhouse sellers are on our sheds and greenhouses page.
- Secondary suites: a permit and final inspection in both places, plus a $250 City legalization fee and a yearly Township suite fee. The full side-by-side is in secondary suite rules in Langley.
- Fences: no building permit under either bylaw, but zoning sets the heights.
- Renovations: structural work, new plumbing, basement finishes, wood stoves and garage conversions all need permits. See home renovation contractors, and trees on your property if a tree is in the way.
Our government paperwork guide covers which office handles everything else.
Last checked November 19, 2026. Spotted something out of date? Tell us.



