The Thursday Roundup: Langley in 5 minutes, every Thursday. Free, no ads. Join free
Submit

Directory › Civic

Civic

Building a legal secondary suite in Langley: City vs Township rules

What it takes to add or legalize a basement suite in the City of Langley versus the Township of Langley: size limits, parking, permit steps, every published fee and the yearly charges that follow.

Side by side: Langley City Hall on Douglas Crescent in downtown Langley City (left) and the Township of Langley Civic Facility at 65 Avenue and 203 Street (right), on sunny days
Photos: City of Langley (left); Leoboudv, CC BY-SA 4.0, via Wikimedia Commons (right)
Permit needed?
Yes, in both. Every suite, new or existing, needs a building permit and a final inspection before anyone moves in
City of Langley
Building Division, City Hall, 20399 Douglas Crescent. 604-514-2804, [email protected]. Suite forms
Township of Langley
Permits, Licences and Inspections, 20338 65 Avenue. 604-533-6018, [email protected]. Apply online
Size limit
City: the lesser of 100 m² or 40% of the building. Township: 120 m²
Yearly charges
Township: $145 suite infrastructure fee (2026 on) plus $233.99 water and $214.94 sewer on flat rates. City: water and sewer are metered
Provincial grant
Closed. BC Housing stopped taking applications as of March 31, 2025
Last checked
November 15, 2026

Can you build a legal secondary suite in Langley? Yes, on both sides of the line, but the City and the Township write the rules differently. The City caps a suite at 100 m² (or 40% of the house, whichever is smaller) and requires the owner to live on the property. The Township allows up to 120 m² and charges a yearly suite fee on the tax notice. Both want a building permit, inspections and a final sign-off before a tenant moves in.

Not sure which one you live in? Our City vs Township guide sorts that out in a minute.

City vs Township secondary suite rules at a glance

City of Langley Township of Langley
Rulebook Zoning Bylaw No. 3300, in effect since March 9, 2026 Zoning Bylaw No. 2500, Section 100
Where a suite can go A single detached house, or one per unit in a “plex home” (duplex to fourplex) Single family, two family and semi-detached homes, manorhomes, townhouses, rowhouses and small-scale multi-unit housing, one per principal unit
Maximum size Lesser of 100 m² or 40% of the building’s gross floor area 120 m² gross floor area
Owner must live there Yes, the registered owner must live on the lot Not part of the Township’s suite definition
Parking One space for the suite on top of the house’s two (exceptions near frequent transit) House and suite lots: 1 space per unit, at least 2 per lot
Permit fee Set by construction value, from $200 Set by construction value, $100 minimum
Legalizing an existing suite $250 fee, plus the permit Through a building permit
Yearly suite charges No separate suite line on the City’s utility page $145 infrastructure fee, plus 30% extra on flat-rate water and sewer

City of Langley secondary suite rules

The City’s new zoning bylaw, adopted March 9, 2026, sets six conditions for a suite. The registered owner has to live on the lot. The suite has to meet the BC Building Code. It can’t be larger than 100 m² of gross floor area, and it can’t take up more than 40% of the building. It needs one off-street parking space on top of the two a house normally needs. And it has to be inspected through a building permit and recorded in the City’s secondary suite registry.

On a typical R1 lot the bylaw now allows up to four homes, or six within 400 m of a frequent bus stop, as a plex home. Each unit in a plex home can have one suite of up to 100 m². Inside a Transit-Oriented Area near the coming SkyTrain stations, an R1 lot is limited to a house plus one suite, garden suite or carriage home.

Parking has a wrinkle. The bylaw’s parking table says the R1 minimums are “not applicable within 400 m of a frequent bus stop,” and in Transit-Oriented Areas the residential minimum drops to accessible parking only. If your lot is near a frequent route, ask the City’s planners ([email protected], 604-514-2831) which rule applies before you pave anything.

One thing that can trip people up: the City’s suite application guide is dated May 2022 and still shows the old 90 m² limit. The guide itself says the bylaw wins where they differ, and the bylaw now says 100 m².

How to add a secondary suite in Langley City

  1. Check the basics. You’ll be living on the property, the suite fits under 100 m² and 40% of the house, and there’s room for the extra parking space and a hard-surfaced walkway to the suite door (the guide asks for one).
  2. Get plans drawn. Two sets, no smaller than 11" x 17": a site plan showing the driveway, the suite’s parking spot and the walkway, plus floor plans and a cross-section showing both units, the fire separation, alarms and heating. Pencil and graph paper aren’t accepted.
  3. Fill in the paperwork. From the Building Permits page: the building permit application, Owner’s Acknowledgement (Form 1), Agent Authorization if a contractor is applying for you, and a title search no older than 48 hours. The owner-residency rule is confirmed with a Secondary Suite Declaration, a solemn declaration signed in front of a commissioner for taking affidavits.
  4. Apply and pay the application fee. The rest of the permit fee is worked out after plan review, and a refundable damage deposit is collected before the permit is issued.
  5. Book the inspections. Typically plumbing, framing, insulation, a drywall check of the fire separation, and a final. Electrical permits come from Technical Safety BC, not the City.
  6. Wait for written occupancy. Nobody can live in the suite until the final inspection is done and the City authorizes occupancy in writing.

If the house is more than 30 years old, or the work tops $100,000, the City’s Engineering Department decides whether water and sewer connections need upgrading.

City of Langley suite fees

From the City’s Schedule 4, Building Permit Fees & Charges (all subject to applicable taxes):

  • Application fee, single-family dwelling work (new, additions, alterations, renovations): $200.00
  • Permit fee by construction value: $200.00 up to $10,000; $200.00 plus $10.56 for each $1,000 or part over $10,000 (to $50,000); $576.00 plus $10.23 for each $1,000 or part over $50,000 (to $100,000); $1,088.00 plus $9.63 for each $1,000 or part over $100,000 (to $500,000)
  • Legalize a Secondary Suite: $250.00
  • Removal of a Secondary Suite: $200.00
  • Plumbing: $100.00 base plus $40.00 per fixture
  • Re-inspection: $150.00

The permit fee doubles if work starts before the permit is issued. For yearly costs, the City bills water at $2.06 per cubic metre plus a $75 fee and sewer at $2.41 per cubic metre on 80% of water use plus $75 (2026 rates). Its utilities page lists no separate suite charge.

Township of Langley secondary suite rules

The Township’s zoning bylaw defines a secondary suite as a unit that meets the BC Building Code and is no larger than 120 m² of gross floor area. Bylaw amendments in 2024 and 2025 widened where suites can go: single family homes, two family (duplex) and semi-detached homes, manorhomes, townhouses, rowhouses and small-scale multi-unit housing, each principal unit allowed one suite. In the Agricultural Land Reserve, a suite also has to follow the Agricultural Land Commission’s rules.

In the Township’s bylaw, small-scale multi-unit housing means up to four units, attached or detached, on one lot. The lot has to be inside the urban containment boundary, under 4,050 m², on municipal water and sewer, not heritage-protected, not in the Willowbrook Transit-Oriented Area and not accessed from an arterial road. Lots of 280 m² or less top out at three units.

For parking, single family, two family and small-scale multi-unit lots need one space per dwelling unit, with at least two per lot. Townhouses, semi-detached homes, manorhomes and rowhouses need one space per secondary suite.

The Township’s suite guide was last updated in January 2025, before the July 2025 amendment, and still says suites aren’t allowed in townhouses, row houses or manor houses. If you own one of those, confirm with the Township before paying for drawings.

How to add a secondary suite in Langley Township

  1. Read the guide and checklist. Both are under “Secondary suite” on the Township’s Residential Building Permits page. The 120 m² cap counts finished living area, not shared laundry or shared exits.
  2. Draw the floor plans to scale. Label every room with its size and height, and show windows with egress sizes, the fire separation, interconnected smoke and CO alarms, plumbing, and heating and ventilation. If the suite takes only part of a floor, show the whole floor.
  3. Gather the documents. A building permit application form, the signed secondary suite checklist, a title search or freehold transfer no older than 30 days, and an Agent Authorization if someone applies for you. On septic, a Registered Onsite Wastewater Practitioner has to seal the floor plan and complete the Township’s referral form.
  4. Apply online. Suite applications go through the Township’s eApply portal; paper isn’t accepted where digital submission is available.
  5. Pay and pick up the permit. It’s issued once bylaw and code compliance is shown and fees and any bonds are paid.
  6. Call for inspections. The first one comes before construction, to check waste bins, tree protection and silt control. Post the permit card and address where they’re visible, and keep the approved drawings on site.
  7. Get the final accepted. No one can occupy the suite until the inspector accepts the final and authorizes occupancy in writing.

Township of Langley suite fees

From Schedule 18 of the Township’s Fees and Charges Bylaw:

  • Minimum building permit fee: $100.00
  • Permit fee by value: $52.50 for work valued up to $1,000; $9.75 for each additional $1,000 or part up to $50,000; $10.00 for each additional $1,000 or part from $50,000 to $1,000,000
  • How value is counted: basement finish or secondary suite, $1,220.00 per m²; secondary suite conversion, $345.00 per m²; secondary suite above grade, $345.00 per m²
  • Re-inspection: $165.00 per inspection

Under the Building Bylaw the permit fee may be doubled if work starts first.

Then there are the yearly charges. The Annual Secondary Suite Infrastructure Fee was $245 in 2025 and is $145 in 2026 and after, billed with property taxes and due the same day. It keeps coming every year until the Township accepts that the suite has been removed, and it isn’t refunded if you take the suite out. On the separate utility bill, a flat-rate home with a suite pays 30% more: $233.99 for water and $214.94 for sewer in 2026. The Township says suite owners get priority in its voluntary water metering program if they ask. Our water and sewer explainer and property tax and utilities guide cover the bills in more detail.

What the BC Building Code asks for

Zoning decides if a suite is allowed. The BC Building Code decides how it’s built, and the Province’s Home Suite Home guide walks through the main points:

  • Ceiling height is generally no less than 2.1 m, including corridors and stairs, under beams and ducts.
  • Fire separation: the suite must be fully separated from the rest of the house by fire-protected walls, floors, ceilings and doors. The rating needed depends on the house, the alarms and whether there are sprinklers.
  • Alarms: smoke alarms in each unit and in shared spaces, and CO alarms wherever there’s a fuel-fired appliance or a garage. Unless the house is sprinklered, they must be interconnected to sound in both units and hardwired for power.
  • Sound separation between the units is part of the code too.
  • Attached homes (duplexes, row houses) have extra rules, and no part of the suite can sit above or below another dwelling unit.

The guide adds that a newly built home can’t use the code’s alternate compliance methods, which are sometimes available for older houses.

Legalizing an existing basement suite

A suite built without a permit isn’t legal in either municipality until it goes through the same permit and inspections as a new one. The City lists a $250 fee to legalize a secondary suite. The Township’s guide says every suite needs a permit “whether they are being considered as an alteration to an existing dwelling” or built new.

Neighbours can report an unauthorized suite. The Township takes construction complaints only from people living within 500 m, with name, address and phone number, and doesn’t accept anonymous ones. If you’re renting in a suite, our renting in Langley page explains how tenancy law still applies.

Going the other way, both municipalities spell out what removing a suite means: the 220-volt stove and dryer and their wiring, the range hood, upper cabinets and second laundry all go, no more than 6 feet of lower cabinets and a bar sink can stay, and the locks between units come off. The City’s form comes with a $200 fee; the Township’s requirements end with a site inspection. In the Township, removal to its satisfaction is also what ends the yearly infrastructure fee.

Is the BC Secondary Suite Incentive Program still open?

No. BC Housing’s page says that “as of March 31, 2025, BC Housing is no longer accepting applications to this program,” and that existing pre-approvals and SSIP mortgages will be honoured. The program offered a forgivable loan of half the construction cost, up to $40,000, to owners who rented the suite below market for five years. When it closed, the Province said in a March 19, 2025 release that homeowners might be able to apply to a planned federal secondary-suite loan program once it launched.

Planning a bigger renovation around the suite? Our home renovation contractors list covers Langley builders.

Something out of date? Tell us.

Last checked November 14, 2026. Spotted something out of date? Tell us.

The Thursday Roundup · free

Langley in 5 minutes, every Thursday.

The weekend lineup, one honest review, one local decision explained. No ads, unsubscribe in one click.

More in civic

Building permits in Langley: City vs Township, when you need one, fees and inspections

When a project in the City of Langley or the Township of Langley needs a building permit, how each one takes applications, what the 2026 fees work out to, and how to book inspections.

Burning permits in Langley

When you can burn yard debris in Langley, what the Township permit costs, who qualifies, and why Langley City doesn't issue one.

Can you cut down that tree? Pruning, removal and permits in Langley

Seven checks before you prune or take down a tree on your Langley property: City or Township, how big it is, nesting birds, who owns it, the permit, emergencies and power lines.

Casino money in the City of Langley: how the host share works

The casino sits in the City, so the City gets a share of its gaming revenue. Here is how that works and what the City says it does with it.

City of Langley council: who they are and how to reach them

The mayor and councillors elected in the City of Langley's 2026 election, and the official ways to reach council.

City of Langley vs. Township of Langley: what's the difference?

Two separate municipalities, two councils and two city halls, and here is how to tell them apart.