Directory › Recreation › Projects
Smith Athletic Park: the Township's new soccer campus
Three turf fields are open and an indoor soccer building is under construction at Smith Athletic Park in Willoughby.
- Where
- Smith neighbourhood, Willoughby, near 76 Avenue and 208A Street, Township of Langley (20-acre site)
- Project value
- $129.95 million, per the Township's project page
- Phase one
- Three synthetic fields, open since September 6, 2025
- Phase two
- Indoor soccer field and training facility, under construction; no opening date listed
- Project page
- tol.ca, Smith Athletic Park
- Township phone
- 604-534-3211
A big piece of Willoughby that used to be a construction site now has kids running around on it. Smith Athletic Park is the Township of Langley’s newer soccer campus, and it is still growing. Here is where it stands, going by the Township’s own project page.
What’s open
Phase one is done. The Township says it includes three synthetic turf fields, shelters for players and officials, spectator seating and a grandstand, parking, change rooms, public washrooms, a concession, more than 100 trees, a playground, picnic tables and new trail connections. The three fields officially opened on September 6, 2025. The Langley Advance Times reported that Langley United Soccer Association is the operator, which fits with our Langley United Soccer page.
What’s still being built
Phase two is an indoor synthetic soccer field and training facility, with change rooms, public washrooms, a concession and training spaces. As of the Township’s May 19, 2026 update, the building’s wood arch roof was under construction and exterior cladding was expected to start in summer 2026. The page gives no completion or opening date, so we don’t either.
Cost and approvals
The Township lists the project value as $129.95 million. Council approved funding for phase one on July 25, 2024, and for phase two on January 16, 2025. An earlier Township news item on phase one described $60 million of funding covering access roads, utilities and site work along with the three fields, a dog park and a playground, and said the money would come from Community Amenity Contributions and Development Cost Charges. Earlier news coverage has used other total figures at other stages, so check the project page for the current number.
The neighbours
The site sits beside the planned Smith Middle and Smith Secondary schools. The Province’s project page lists the secondary school (grades 9 to 12, 1,900 spaces, $203 million) as under construction, with occupancy planned for fall 2027.
The new ice and dry-floor arenas are a separate project at the Langley Events Centre, not at this park. See the arena expansion. For the full list, see major projects in the Langleys.
Something out of date? Tell us.
More in recreation
Al Anderson Memorial Pool
The City of Langley's outdoor 25 metre pool in City Park, open in spring and summer, with lessons, aquafit and evening swims.
Aldergrove Credit Union Community Centre
Aldergrove's community centre, with an indoor pool, ice arena, fitness centre, walking track and The Outdoor Experience waterpark.
Big projects being built in the Langleys, fall 2026
A tour of the large public projects underway or planned in the City and Township, with official costs and dates where they are published.
George Preston Recreation Centre
The Township's ice arena and curling centre on 42 Avenue in Brookswood, and home rink of the Langley Rivermen.
Langley Events Centre
The big sports and events complex on 200 Street, with its arenas, stadium, gyms and the teams that call it home.
The ARENAS at Langley Events Centre: what was built
Three new ice arenas and two dry-floor arenas joined the Langley Events Centre in September 2026. Here is the scope, cost and timeline.
Last checked October 20, 2026. Spotted something out of date? Tell us.