- Buses (timetables of 7 Sept 2026)
- TransLink 503 west, BC Transit 21 to Abbotsford, TransLink 556 to Gloucester (weekday peaks only)
- SkyTrain
- None in Aldergrove. Surrey-Langley line ends at Langley City Centre; 2029 target (Sept 2026 update)
- Scheduled bus, 07:00 from 272 St/Fraser Hwy
- Langley Centre 07:38, Surrey Central 08:43
- 264 St interchange
- Under construction, provincial target 2027; mobility hub planned, not open
- Border hours, 1 Nov 2026 to 14 Mar 2027
- Canadian side 09:00 to 01:00 Pacific. Check live waits
- RV on the street
- Attached RV or trailer: 48 hours per calendar year
Aldergrove is a long way from the rest of the region, and the choices here are blunt. One road leads west (Fraser Highway, and Highway 1 once you climb onto it at 264 Street), one leads to Abbotsford, and one leads to the border. Three bus routes each cover one of those jobs. All the bus details below were checked on 30 October 2026 against timetables that took effect on 7 September.
Buses: which one does what
| Route | Where it goes | Weekday peak | Weekday off-peak | Weekends |
|---|---|---|---|---|
| TransLink 503 | Aldergrove, Langley Centre, King George and Surrey Central; also loops through north and south residential Aldergrove | Uneven: westbound morning departures from 272 St and Fraser Hwy have gaps of 6 to 20 minutes | About every 30 minutes at midday; evenings vary | Roughly every 20 to 30 minutes for much of the day, with some longer gaps |
| TransLink 556 (new 7 Sept 2026) | Langley Centre to the Gloucester industrial area via 56 Avenue | Every 30 minutes in two peak windows | No midday or evening service | No service |
| BC Transit 21 / 21A | 272 St and Fraser Hwy to Highstreet, Clearbrook and Bourquin Exchange in Abbotsford | Eastbound morning: 06:30, 07:15, 08:00, 08:45 | Irregular, roughly 45 to 90 minutes | Saturday 60 to 100 minutes; Sunday 60 to 95 |
Those frequencies describe the Aldergrove end of each route, not the more frequent overlapping service farther west. They’re our calculations from the published timetables, not a promised clock-face frequency.
The 556 in detail. From Langley Centre, buses run roughly 05:15 to 08:15 and 14:45 to 17:45. From Gloucester, they run roughly 06:00 to 09:00 and 15:30 to 18:30. If your shift ends later, you’ll need a different plan. Check how far the stop is from your workplace door too.
The 21 in detail. It’s the link for Abbotsford jobs, shopping and appointments. One weekday trip leaves 272 St and Fraser Hwy at 08:00 and reaches Highstreet at 08:17, Clearbrook at 08:29 and Bourquin Exchange at 08:36. TransLink and BC Transit are separate agencies, so check each one’s fare rules rather than assuming one fare covers the whole trip.
The commute west
A weekday example from the official timetable: the 503 leaving 272 St and Fraser Hwy at 07:00 reaches Langley Centre at 07:38 and Surrey Central at 08:43. That’s 38 minutes and 1 hour 43 minutes on the bus alone, before walking, waiting or the SkyTrain leg to Vancouver.
By car, route planners give these estimates from a generic Aldergrove point. They assume free-flowing traffic:
| Destination | Distance and time |
|---|---|
| Surrey Central Station | 33.5 km, 27 minutes |
| King George Station (SkyTrain) | about 34 km, 27 minutes |
| Downtown Vancouver (generic point) | 58.6 km, 47 minutes |
| Abbotsford | 19.2 km, 22 minutes |
| Abbotsford Airport | about 13 km, 15 minutes |
These aren’t observed commute times. We couldn’t find a verified peak-hour range, so before you budget a daily drive, test your exact address and arrival time on a few ordinary weekdays, in both directions.
SkyTrain and park-and-ride
There’s no SkyTrain station in Aldergrove. The existing line’s eastern end is King George in Surrey. The Surrey-Langley SkyTrain extension will reach Langley City Centre (203 Street and Industrial Avenue) with a stop at Willowbrook near 196 Street and Fraser Highway. The province’s 15 September 2026 update keeps a 2029 opening target. No funded extension to Aldergrove has been announced, so getting to that station will still mean a bus or a drive. See the Langley-wide getting around guide.
The 264 Street interchange project includes a planned mobility hub with 180-plus parking spaces and a bus loop, but it isn’t built. For an existing park-and-ride, TransLink’s park-and-ride directory lists Carvolth Exchange; we haven’t measured an Aldergrove-to-Carvolth commute.
Driving: Fraser Highway, 264 Street and construction
Fraser Highway is the east-west road through town. The Township finished widening the 24300 to 24600 block in May 2026, with four lanes, paths and intersection work; that doesn’t mean the whole route to 264 Street is widened.
264 Street (Highway 13) connects the Highway 1 interchange to the border. The Province is rebuilding the Highway 1 and 264 Street interchange as a diverging-diamond interchange. Traffic moved onto the new west bridge on 29 August 2026 and the old structure closed for demolition. The project page targets 2027 for completion. Questions go to the project team at [email protected] or 604-527-2221. For current local road work, see Langley road closures and the Township’s traffic impacts page.
The border crossing
The Aldergrove-Lynden crossing is at 264 Street (Highway 13) and 0 Avenue. For this and the other nearby crossings, see U.S. border crossings near Langley.
New hours on 1 November 2026. The CBSA notice of 9 October 2026 sets the Canadian side's traveller and commercial hours at Aldergrove to 09:00 to 01:00 Pacific Time from 1 November 2026 to 14 March 2027, tied to the seasonal clock difference with Washington. The U.S. listing for Lynden uses 08:00 to midnight local Washington time. Check the direction you're travelling and which clock the hours use, and look at the live CBSA wait times before you go. Published hours never promise a short queue.
Walking and cycling
From 272 St and Fraser Hwy, the community centre at 27032 Fraser Hwy is roughly a 5 minute walk and FreshCo at 27566 Fraser Hwy about 10 minutes. Those are our estimates from the street grid, not mapped routes. The Township’s cycling and trails page links its cycling map. We couldn’t confirm a continuous protected bike route from every residential pocket to Gloucester or Langley City, so check your own route.
Parking in Aldergrove
We found no Aldergrove-wide parking-occupancy study or residential permit zone, so read the posted signs on your block and check your home or strata’s stall allocation.
- RVs and trailers. An attached RV or trailer can be parked on a street for a maximum of 48 hours per calendar year, with no residential occupancy. The general limit for a vehicle in one street spot is 72 hours where parking is otherwise allowed. Front-driveway RV storage in residential zones has a seasonal exception from 1 April to 30 September, subject to setbacks and other requirements, so don’t assume October storage is allowed. Details are on the Township’s parking regulations page; the Langley-wide parking guide covers the rest.
- Gloucester trucks. The Township runs a pilot where commercial vehicles may park at designated signed locations at all hours for up to 72 hours. Council continued Phase 1 on 29 June 2026 and held Phase 2 until existing capacity is used more. Questions: [email protected]. The pilot doesn’t apply to an ordinary residential street.
- The community centre. Use the overflow parking map on the facility page for waterpark sessions and arena events.
- Schools. We have no measured school-by-school parking shortage. Look at pickup conditions during the real dismissal period. The Township lists traffic calming already done on 32 Avenue in front of Parkside.
Road-safety requests and bylaw concerns go through the Township’s report a problem page; transit feedback goes to TransLink or BC Transit.
More on the area: Aldergrove overview, town centre, pros and cons.
Questions people ask about Aldergrove
Which bus goes west from Aldergrove?
Can I take a bus from Aldergrove to Abbotsford?
Can I get to Gloucester by bus?
Is SkyTrain coming to Aldergrove?
How long is the drive to Vancouver?
Is the Aldergrove border crossing open 24 hours?
When will the 264 Street interchange be finished?
Can I park an RV on the street in Aldergrove?
Last checked October 29, 2026. Things change fast in a growing area: confirm anything important (catchments, rents, bus times) with the official source linked. Spotted something out of date? Tell us.







